Post Job Free

Resume

Sign in

Electrical Design Engineer

Location:
Cebu City, Central Visayas, Philippines
Posted:
August 22, 2017

Contact this candidate

Resume:

* ** **

RIT GUARDIARIO LENDIO

Cebu, Philippines

Mobile Number: +639*********

Email addresses: aczw8t@r.postjobfree.com

SUMMARY OF QUALIFICATIONS

- Electrical Design Engineer/Designer with Over 14 years in the EPC Industry involve in Electrical Designing.

o Familiar with international codes and standards (IEC, ANSI, NEMA, NFPA). o Take responsibility for the design and drafting of electrical installation for the assigned project o Coordinate with design team of other disciplines for inter-disciplinary interaction. o Plan and schedule work for a given project.

o Quality Assurance Responsible for working within the provisions and guidelines of the company Quality Assurance system. Familiarity in discipline internal checks, squad checks for deliverables. o Can work within a team environment with minimum supervision

- Proficient in using the following software

o AutoCAD 2011.

o Microstation V8i

o PDS- EE Raceway & Equipment Modeling.

o Naviswork Jetstream.

o Dialux.

o SP3D Raceway & Equipment Modeling.

o Micosoft Excel including functions & Macros.

o Microsoft Word.

- Philippines Registered Electrical Engineer with license number 0029260. o Can interpret Electrical Engineering Calculations and Reports. 2 of 11

WORK EXPERIENCES

Date: August 19, 2013 to August 18, 2016

Job Title: Electrical Design Engineer

Department: Electrical

Company Name: Fluor Daniel Incorporation, Cebu Philippines. Work History:

• Encana Cut Ridge Program Project in Calgary, Canada (January 2016 to August 2016) Project Engineering, Design and Construction execution approach using the latest modularization concept Job Role: Design Engineer

Reports directly to office project lead.

Coordinate with other discipline to obtain small Power loads. Designs the small Power System(120V) in the Project. Prepare the following Client and Inter department Deliverables:

- Lighting Panel schedules

- Cable sizing (120/208V)

- Small Power Panel Schedule

- Block Diagrams for Lighting and Receptacle

- Small Power Cable Schedule

- UPS Fused Junction box and Non UPS Junction Box Wiring diagram

- 3D Modeling for EE-raceway and Equipments (SP3D).

- MTO preparation for all equipments and materials within Scope

• WTDC Project in Calgary, Canada (June 2014 to December 2016) Job Role: Design Engineer / Modeller

Assist Electrical lead in work Coordination between Lead and Satellite offices. Coordinate with other discipline for work interfaces. Oversee the Electrical Task force in performing the Electrical engineering and designing work for the following Client and Inter department Deliverables:

- MCC SLDs

- Grounding Layout

- Cable Routing Layout

- Lighting Calculations and Layouts

- 3D Modeling for EE-raceway and Equipments (SP3D).

- MTO preparation for all equipments and materials within Scope

• Dow PUI PROJECT in Houston Texas, USA (January 2013 to June 2014) Job Role: Electrical Designer.

Prepared, Coordinated with other discipline and Updated or Revised Construction Detail Drawings of the following systems:

- Lightning Protection Layout for Buildings.

- Grounding Layout

- Hazardous Area Classfication

- Cable Routing Layout

- 3D Modeling for raceways and Equipments (SP3D).

• BASF Project in USA and other small Projects (August 2013 to December 2013) Job Role: Electrical Designer

Prepared, Coordinated with other discipline and Updated or Revised Construction Detail Drawings of the following systems:

- 2D drafting works

- 3D Modeling for raceways and Equipments (SP3D).

- As built drawings supports

3 of 11

Date: December 2006 to July 2013.

Job Title: Electrical Designer

Department: Electrical

Company Name: Consolidated Contractors Int'l Co. (CCIC) Engineering, Procurement & Support Office (EPSO)

P.O. Box 45014 Abu Dhabi, United Arab Emirates

Work History:

• SHAH PROJECT in Abu Dhabi, U.A.E. (January 2012 to Present) Prepared, Coordinated with other discipline and Updated or Revised Construction Detail Drawings of the following systems:

- Lightning Protection Layout for Buildings.

- Cellar Arrangement Layout for Buildings and Substations

- Grounding Layout

- Cable Routing Layout

- 3D Modeling which includes EE-raceway and Equipment Modeling. Software used: CAD 2D - Microstation V8i ; 3D Modeling – SP3D (Smart Plant 3D)

• RAS LAFFAN EXPANSION PORT PROJECT in Ras Laffan, Qatar. (March 2011 to January 2012) Prepare As-built works for the following systems:

- Cable Route Layout for both LV and HV.

- Grounding systems (Substation building)

- Single Line Diagrams for HV, LV and UPS Distribution System.

- Substation Cable Route Layout.

- Cathodic Protection Schematic Diagrams (From Sub-con / Vendor)

- Interconnection Schematic Diagram

- Electrical Distribution Board Schedule

Software used: CAD 2D - AutoCAD 2006 and MS Office – Excel

• HABSHAN FLARE GAS RECOVERY PROJECT in Abu Dhabi, U.A.E. (January 2011 to March 2011) Prepare Construction Detail Drawings for the following systems:

- Telephone & Intercom Systems Cable Route and Equipment Layout in 2D and 3D.

- CCTV System Process and Security Surveillance in 2D and 3D.

- Fire and Gas System Equipment Layout 3D.

- Schematic Block Diagram for Fiber Optic System, Camera, Telephone and Intercom. Software used:

CAD 2D - Microstation V7

CAD 3D - PDS (Plant Design System) of Electrical Raceways and Equipment Modeling 3D Viewer - Naviswork Jetstream.

• RAS LAFFAN EXPANSION PORT PROJECT in Ras Laffan, Qatar. (September 2008 to December 2010) Prepare Construction Detail Drawings for the following systems:

- Cable Route layout for both LV and HV

- Grounding systems

- Single Line Diagrams for HV, LV and UPS Distribution System 4 of 11

- Substation Cable Route and Equipment Layout

- Standard Installation Drawings for Power, Lighting, Grounding, and Telecommunication Systems

- Telephone & Intercom Systems Cable Route and Equipment Layout in 2D (with WWWP sub- contractor)

- CCTV System Process and Security Surveillance in 2D (with WWWP sub-contractor) Software used: CAD 2D - AutoCAD 2006 & 2007 LT

• OFFSHORE ASSOCIATED GASSES PROJECT in Abu Dhabi, UAE. (December 2007 to September 2008) Prepare Construction Detail Drawings for the following systems:

- Telephone & Intercom Systems Cable Route and Equipment Layout in 2D and 3D

- CCTV System Process and Security Surveillance in 2D and 3D

- Schematic Block Diagram for Fiber Optic System, Camera, Telephone and Intercom Software used:

CAD 2D - Microstation V7

CAD 3D - PDS (Plant Design System) for Electrical Raceways and Equipment Modeling 3D Viewer - Naviswork Jetstream

• AL-KHAFJI JOINT OPERATIONS of Kuwait Gulf Company. (December 2006 to March 2008) Prepared Construction Detail Drawings of the following systems:

- Lighting Systems Cable Route and Equipment layout

- Power systems Cable Route and Equipment layout

- Standard Installation Drawings for Power, Lighting, and Grounding systems

- Support CAD works in preparing P&ID with Process Groups Software used:

CAD 2D - AutoCAD 2007

Date: July 2002 to December 2006

Job Title: Electrical Designer 2 (Senior Electrical Designer) Department: Electrical

Company Name: DASH Engineering Philippines, Inc.

8th floor PIPC-ESB Building, Jose Ma. Del Mar Avenue Asiatown IT Park Cebu City, Philippines 6000 Tel. No. +63-32-234**** Work History:

• SMM/SMAG-III Project (Singapore)

Prepare Electrical Construction Detail Drawings and Schematics of the following systems:

- Power Systems (Equipment Layout, Cable Route Layout and Single Line Diagrams)

- Cable Schedule

Perform Engineering Calculations such as:

- Circuit Breaker Sizing

- Cable Sizing

Software used:

- AutoCAD 2002

- Microsoft Office (Word & Excel)

5 of 11

• Petrochemical Corporation of Singapore II Propylene Plant Prepare Electrical Construction Detail Drawings and Schematics of the following systems:

- Power Systems (Equipment Layout, Cable Route Layout and Single Line Diagrams)

- Lighting Systems (Equipment Layout, Cable Route Layout and Panel board Schedule)

- Standard Installation Details for all Systems.

- Grounding Systems includes Main Earthing Grid, Substations, Outdoor Power & Static Equipments

- Hazardous Area Classification

- Data Sheets for all Electrical equipments

- Cable Schedule

- Bill of Quantity

Perform Engineering Calculations such as:

- Cable Sizing

- Circuit Breaker Sizing

Software used:

- AutoCAD 2002

- Chalmite

- Microsoft Office (Word & Excel)

• SMPC 3 Project (Thailand)

Prepare Electrical Construction Detail Drawings, Schematics and Documents of the following systems:

- Lighting Systems (Equipment Layout, Cable Route Layout and Panel board Schedule)

- Communication Systems (Equipment Layout, Cable Route Layout and Single Line Diagrams)

- Fire Alarm & Emergency Systems (Equipment Layout, Cable Route Layout and Schematic Diagrams)

- Cable Schedule for all voltage levels

- Bill of Quantity

Perform Electrical Calculations such as:

- Cable Sizing

- Circuit Breaker Sizing

Software used:

- AutoCAD 2002

- Illumination (point by point method)

- Microsoft Office (Word & Excel)

• Petkim Petrokimya holding A.S., NSC-Revamp & 2EPP Projects (Turkey) Prepare Electrical Construction Detail Drawings and Document of the following systems:

- Power Systems (Equipment Layout & Cable Route Layout)

- Bill of Quantity

Software used:

- Microsoft Office (Word & Excel)

- Adobe Photoshop

6 of 11

• Thai Pet Resin Company, TPRC Project (Thailand)

Prepare Electrical Construction Detail Drawings, Schematics and Documents of the following systems:

- Power Systems (Equipment Layout, Cable Route Layout and Single Line Diagrams)

- Lighting Systems (Equipment Layout, Cable Route Layout and Panel board Schedule)

- Grounding Systems for Main Grounding Network, Substations, Power & Static Equipment

- Fire Alarm & Emergency Systems (Equipment Layout, Cable Route Layout and Schematic Diagrams)

- Cable Schedule for all voltage levels

- Bill of Quantity

Perform Engineering Calculations such as:

- Illumination (point by point method)

- Circuit Breaker Sizing

Software used:

- AutoCAD 2002

- Microsoft Office (Word & Excel)

• Tiszai Vegyi Kombinat Rt., TVK-PE4 Project in Hungary Prepare Electrical Construction Detail Drawings, Schematics and Documents of the following systems:

- Power Systems (Equipment Layout, Cable Route Layout and Single Line Diagrams)

- Substation Systems (Equipment & Cable Route Layout)

- Fire Alarm & Emergency Systems (Equipment Layout, Cable Route Layout and Schematic Diagrams)

- Cable Schedule

- Bill of Quantity

Perform Electrical Calculations such as:

- Cable Sizing

Software used:

- AutoCAD 2002

- Microsoft Office (Word & Excel)

• Nippon Synthetic Chemical Industry Co. Ltd. SLEU Project, UK. Prepare Electrical Construction Detail Drawings and Document of the following systems:

- Lighting Systems (Equipment & Cable Route Layout)

- Bill of Quantity.

Software used:

- AutoCAD 2002

- Microsoft Office (Word & Excel)

7 of 11

Construction Site Experience:

Position: Observer and Trainee

Job: Monitor and report electrical work progress of High Rise Building Construction to Client. Location: Asia Town I.T. Park Cebu City Philippines. Period: 3 months

Purpose: To be Familiar with the flow of Construction work and Materials. Be aware of how work coordination among different disciplines plays an important role during Construction stage. Be able to recognize the relevance of Engineering Design to Construction works in terms of Safety, Quality, Schedule & Cost. TRAININGS / SEMINARS

OSHA 30-Hours Construction Safety and Health

RODECH Training Services Link International Inc

Cebu City, Philippines

March 30- April 2, 2017

OSHA 10-Hours General Industry Safety and Health

RODECH Training Services Link Intl Inc

Cebu City, Philippines

March 28-29, 2017

Safety Officer Training Course for Construction, Petrochemical and Oil & Gas Industry RODECH Training Services Link Intl Inc

Cebu City, Philippines

March 6-27, 2017

• RIGPASS Onshore and Offshore Endorsement

• Certified Permit Issuer

• Fire and Safety Management

• Certified Safety Inspector

• Water Rescue and Sea Survival

• H2S Specialist / Authorized Gas Tester

• Standard First Aid, CPR and AED

• Oil and Gas Exploration and Drilling Operation

EDUCATION

September 2001 Registered Electrical Engineer Board Exam Passer Bachelor of Science in Electrical Engineering (1996 to 2001) University of San Carlos Technological Center

Cebu City 6000

Philippines

Secondary Education (1992 to 1996)

University of San Carlos Boys High School

General Maxilom, Cebu City

6000 Philippines

8 of 11

PERSONAL DATA

Age : 38 years old

Place of Birth : Cebu City, Philippines

Date of Birth : February 4, 1979

Sex : Male

Civil Status : Married

Religion : Roman Catholic

Citizenship : Filipino

Height : 162 cm

Weight : 80 kgs

Language Spoken : English and Tagalog

PROFESSIONAL REFERENCES

1. Alexander Obida - Design Engineer - Fluor Philippines - +639*********. 2. Lawrence Romeo Bordallo - Senior Electrical Designer - China Petroleum Engineering (Former Colleague in CCC- Chiyoda and Dash Engineering) - +971*********.

3. Unell Orizonte - Senior Electrical Designer - CCC-Chiyoda - +971*********. 9 of 11

10 of 11

11 of 11



Contact this candidate