Saied Mohammadi, PE, PMP
***** ******* ********* #** ******, CA 91316
818-***-**** *****.*********@*****.***
SENIOR ENGINEERING & CONSTRUCTION PROFESSIONAL
Structural Engineering Project Scheduling & Management Forensic Engineering Highly experienced Senior Engineering and Construction Professional with comprehensive background in structural engineering, forensic engineering, project planning and scheduling, and project management within the industries of retail, commercial, residential and industrial construction, and oil and gas sector construction. Expert consultant to the Board for Professional Engineers, Land Surveyors & Geologists for seismic exams. Strong level of proficiency across industry standards, codes, and computer software applications and programs.
Personnel Management
Expert Consultancy
Standards Compliance
Project Scheduling
Structural Design
Quality Assurance
Civil Engineering
Safety Compliance
Resource Estimations
EDUCAT I ON & CREDENT I AL S
MS, Structural Engineering
BS, Civil Engineering
PE Civil Engineering, California License # C82330
PMP License #1792160
General Contractor License B #994604
Expertise License –Forensic Engineering
SE structural Engineering, California Will be
acquired in Fall 2017
TECHNI CAL SKI L L S
ACI 318-11, AISC – LRFD/ASD 2010, AISI 2012, ASCE 7-10, NDS 2015, IBC 2015, CSA-A23.3, FEMA 356, AASTO (Specifications for Highway Bridges) PMBOK
SAP2000 including Static none linear analyses (push over analysis) and IDA. CSI Bridge, ETABS, SAFE, RISA 2D, Auto Cad 2016, MS Office (Word, Excel, PowerPoint), Primavera Enterprise (P6), MSP
Structural Engineering, Concrete Structures, Steel Structures, Seismic Design, Geotechnical Engineering, Finite Element Analysis, High Rise Buildings, Underground Structures, Construction Methodology, Construction Management, Project Engineering, Project Management, Project Estimation (Cost, Time etc.), Project Planning & Scheduling, Retrofit Design, Excel VBA programming PROF E S S I ONAL EX P ER I ENC E
Independent Consultant: September 2013 – present
Designing structures of various scales in concrete, steel, masonry, and wood projects.
Seismic Retrofit design for multifamily soft story buildings. VERENGO August 2014 – Present
Structural Engineer
Structural engineering and Engineer on Record for roof top and ground mount solar projects; over 2500 projects completed for over 100 AHJ
Inspection of solar projects and completion of structural observation reports to record findings; resolution of structural issues
Producing Standard Operating Procedures for engineering activities, design and structural assessment
Development of a range of spreadsheets for design of wood members, wood connections, wood diaphragm and shear walls utilizing VBA.
SAEID MOHAMMADI, PMP 818-***-****, *****.*********@*****.*** MARMARA DEVELOPMENT GROUP January 2012 – August 2014 Site Manager
Led multiple housing projects in Bel Air, Los Angeles, overseeing all aspects of project coordination, project facilitation, and project management
Directed employees in tasks and duties, ensuring adherence to safety, standards, and quality assurance, and delivery of high level of service
Evaluated resource and labor costs and requirements, time estimation, variance analysis, and risk assessment to complete pre-project timeline, schedule, and milestones
Formulated templates for evaluation of project progress, including monthly and weekly reports SELF EMPLOYED August 2007 to November 2012
Project Manager, Structural Designer
Managed engineering team for structural design and construction of commercial, residential, industrial and office projects for private clients
Managed construction and liaised with customers, subcontractors, vendors, official agencies, and various other key stakeholders to ensure compliance, quality of care, and open communications
Designed and implemented master schedule, detailed schedule, and detailed execution plan, resources and cost estimation collaborating with clients to ensure management of expectations and requirements
Performed structural analysis and design for industrial structures, industrial buildings, and equipment structures across a variety of plants
Completed structural inspections during the construction phase of projects
Prepared forensic engineering reports for clients PROMA COMPANY December 2005 to August 2007
Senior Structural Engineer, Project Supervisor
This was a high rise building of 34 stories and usable area of 1,300,000 Sq. Ft. The lower portion was a fourteen stories concrete structure, about 100 ft. of which was underground, and the upper portion was 20 stories steel structure. I managed the engineering team to perform structural analysis and design, checked and approved structural modeling, analysis, calculations, and drawings, performed structural inspections during the construction phase of project. PARS COMPANY February 2004 to September 2005
Department Manager
This project was design, procurement, and construction of 41 CNG stations. selected project control team, managed team to develop schedules and related activities, rechecked resources, manpower, time and cost allocation to the schedules, held meetings, rescheduled planning, established and discussed construction methodology with construction team members, preparation of invoices (lump sum project) KAYSON CONSTRUCTION COMPANY January 2000 to January 2004 Project Scheduler, Control Specialist, Civil & Structural Designer
Directed project scheduling and control as Project Control Department Head in 4th Aromatics Plant, preparing master schedule, detailed schedule, and detailed execution plan (Feb 2002 to Jan 2004)
Oversaw project scheduling and control as Project Scheduler and Controller for gas refinery South Pars, Phrases 4&5 (Sept 2001 to Feb 2002); Preparing master schedule, detailed schedule, and detailed execution plan; preparing resource estimation, cost and time estimation, variance analysis, and risk assessment; preparing templates for evaluating of project progress, monthly & weekly reports and invoice preparing
SAEID MOHAMMADI, PMP 818-***-****, *****.*********@*****.***
Performed as Civil & Structural Designer in gas refinery South Pars Gas Field, Phase 1 (Jan 2000 to Sep 2001); Performing structural design and supervising drawings preparation for, gas and oil refineries including pipe racks, pipe supports, slug catchers, steel and concrete structures, equipment foundations TEHRAN METRO COMPANY September 1997 – November 2000 Structural Designer
Responsible for structural analysis and design for underground station, metro stations and tunnels