Post Job Free

Resume

Sign in

Project Engineering

Location:
Los Angeles, CA
Posted:
April 17, 2017

Contact this candidate

Resume:

*

Saied Mohammadi, PE, PMP

***** ******* ********* #** ******, CA 91316

818-***-**** aczt6h@r.postjobfree.com

SENIOR ENGINEERING & CONSTRUCTION PROFESSIONAL

Structural Engineering Project Scheduling & Management Forensic Engineering Highly experienced Senior Engineering and Construction Professional with comprehensive background in structural engineering, forensic engineering, project planning and scheduling, and project management within the industries of retail, commercial, residential and industrial construction, and oil and gas sector construction. Expert consultant to the Board for Professional Engineers, Land Surveyors & Geologists for seismic exams. Strong level of proficiency across industry standards, codes, and computer software applications and programs.

Personnel Management

Expert Consultancy

Standards Compliance

Project Scheduling

Structural Design

Quality Assurance

Civil Engineering

Safety Compliance

Resource Estimations

EDUCAT I ON & CREDENT I AL S

MS, Structural Engineering

BS, Civil Engineering

PE Civil Engineering, California License # C82330

PMP License #1792160

General Contractor License B #994604

Expertise License –Forensic Engineering

SE structural Engineering, California Will be

acquired in Fall 2017

TECHNI CAL SKI L L S

ACI 318-11, AISC – LRFD/ASD 2010, AISI 2012, ASCE 7-10, NDS 2015, IBC 2015, CSA-A23.3, FEMA 356, AASTO (Specifications for Highway Bridges) PMBOK

SAP2000 including Static none linear analyses (push over analysis) and IDA. CSI Bridge, ETABS, SAFE, RISA 2D, Auto Cad 2016, MS Office (Word, Excel, PowerPoint), Primavera Enterprise (P6), MSP

Structural Engineering, Concrete Structures, Steel Structures, Seismic Design, Geotechnical Engineering, Finite Element Analysis, High Rise Buildings, Underground Structures, Construction Methodology, Construction Management, Project Engineering, Project Management, Project Estimation (Cost, Time etc.), Project Planning & Scheduling, Retrofit Design, Excel VBA programming PROF E S S I ONAL EX P ER I ENC E

Independent Consultant: September 2013 – present

Designing structures of various scales in concrete, steel, masonry, and wood projects.

Seismic Retrofit design for multifamily soft story buildings. VERENGO August 2014 – Present

Structural Engineer

Structural engineering and Engineer on Record for roof top and ground mount solar projects; over 2500 projects completed for over 100 AHJ

Inspection of solar projects and completion of structural observation reports to record findings; resolution of structural issues

Producing Standard Operating Procedures for engineering activities, design and structural assessment

Development of a range of spreadsheets for design of wood members, wood connections, wood diaphragm and shear walls utilizing VBA.

SAEID MOHAMMADI, PMP 818-***-****, aczt6h@r.postjobfree.com MARMARA DEVELOPMENT GROUP January 2012 – August 2014 Site Manager

Led multiple housing projects in Bel Air, Los Angeles, overseeing all aspects of project coordination, project facilitation, and project management

Directed employees in tasks and duties, ensuring adherence to safety, standards, and quality assurance, and delivery of high level of service

Evaluated resource and labor costs and requirements, time estimation, variance analysis, and risk assessment to complete pre-project timeline, schedule, and milestones

Formulated templates for evaluation of project progress, including monthly and weekly reports SELF EMPLOYED August 2007 to November 2012

Project Manager, Structural Designer

Managed engineering team for structural design and construction of commercial, residential, industrial and office projects for private clients

Managed construction and liaised with customers, subcontractors, vendors, official agencies, and various other key stakeholders to ensure compliance, quality of care, and open communications

Designed and implemented master schedule, detailed schedule, and detailed execution plan, resources and cost estimation collaborating with clients to ensure management of expectations and requirements

Performed structural analysis and design for industrial structures, industrial buildings, and equipment structures across a variety of plants

Completed structural inspections during the construction phase of projects

Prepared forensic engineering reports for clients PROMA COMPANY December 2005 to August 2007

Senior Structural Engineer, Project Supervisor

This was a high rise building of 34 stories and usable area of 1,300,000 Sq. Ft. The lower portion was a fourteen stories concrete structure, about 100 ft. of which was underground, and the upper portion was 20 stories steel structure. I managed the engineering team to perform structural analysis and design, checked and approved structural modeling, analysis, calculations, and drawings, performed structural inspections during the construction phase of project. PARS COMPANY February 2004 to September 2005

Department Manager

This project was design, procurement, and construction of 41 CNG stations. selected project control team, managed team to develop schedules and related activities, rechecked resources, manpower, time and cost allocation to the schedules, held meetings, rescheduled planning, established and discussed construction methodology with construction team members, preparation of invoices (lump sum project) KAYSON CONSTRUCTION COMPANY January 2000 to January 2004 Project Scheduler, Control Specialist, Civil & Structural Designer

Directed project scheduling and control as Project Control Department Head in 4th Aromatics Plant, preparing master schedule, detailed schedule, and detailed execution plan (Feb 2002 to Jan 2004)

Oversaw project scheduling and control as Project Scheduler and Controller for gas refinery South Pars, Phrases 4&5 (Sept 2001 to Feb 2002); Preparing master schedule, detailed schedule, and detailed execution plan; preparing resource estimation, cost and time estimation, variance analysis, and risk assessment; preparing templates for evaluating of project progress, monthly & weekly reports and invoice preparing

SAEID MOHAMMADI, PMP 818-***-****, aczt6h@r.postjobfree.com

Performed as Civil & Structural Designer in gas refinery South Pars Gas Field, Phase 1 (Jan 2000 to Sep 2001); Performing structural design and supervising drawings preparation for, gas and oil refineries including pipe racks, pipe supports, slug catchers, steel and concrete structures, equipment foundations TEHRAN METRO COMPANY September 1997 – November 2000 Structural Designer

Responsible for structural analysis and design for underground station, metro stations and tunnels



Contact this candidate