HUSSEIN RADHI
**** ********* **, *** #*, Walnut Creek, CA 94596
510-***-**** *******.*****@*****.***
Reference: Available upon request
PROFESSIONAL SUMMARY
An enthusiastic and highly motivated individual who has a clear understanding of the role and responsibilities associated with being a field / office civil engineer. EDUCATION
B.S. Civil Engineering, San Francisco State University, California 2015 KEY SKILLS
• SAP2000, AutoCAD and MS Office
• Strong analytical and problem-solving
abilities
• Detail oriented
• Capable and practiced in handling complex
multifaceted tasks.
• Ability to work under stress and meet
deadlines
RELEVANT COURSES
• Steel Structures
• Wood structures
• Reinforce Concrete
Structures
• Structural Analysis
• Soil Mechanics
• Foundation Engineering
• Construction
Management
• Structure Vibration
• Transportation
Engineering
• Engineering Cost
Analysis
RELEVANT PROJECTS
ASCE Steel Bridge SFSU Fall 2014 – Spring 2015
• Design and structural analysis the steel bridge.
• Managed required materials for the construction and worked on building the bridge
• Provided schedule and cost estimates of project deliverables Foundation Design for New Airport and Terminal, SFSU Fall 2014
• Designing a retaining wall, building foundation and calculated the settlement
• Designed the wall for basement excavation and performed a bearing capacity analysis based on the foundations
• Provided cost analysis of this project
Construction on the Women’s softball field in SFSU Spring 2014
• An analysis of the soil was performed to determine the soil properties
• Analysis defined the capabilities of the land to support the loading forces of the structures to be built. PROFESSIONAL EXPERIENCE
AutoCad Drafter Mar 2017– Present
Win Structural, San Ramon, CA
• Ensured compliance with company standard drawing procedures in blueprint review.
• Developed complex project design specifications.
• Provided design support to multiple projects.
Cash Management Apr 2011 – Present
T.J. Maxx, Moraga, CA
• Responsible for reconciling cash on hand with daily sales.
• Preparing bank deposits, balancing registers, tracking petty cash and organizing paper work for sales audit
• Checking the daily sale transactions and inform, train and update employees on cash procedures. Project Manager 2008 – 2010
Al Mezan Construction, Cairo, Egypt
• Prepare contracts, work scope and purchase orders for subcontractors and vendors.
• Constantly maintain budget and accounting records for the project.
• Communicate directly with contractors and suppliers to plan and execute work as scheduled.
• Coordinate building turnover dates with property management.