Post Job Free
Sign in

Project Architect

Location:
Grand Rapids, MI
Salary:
70000
Posted:
April 08, 2017

Contact this candidate

Resume:

c u r r i c u l u m v i t a e

L u c a s J. H o l w e r d a

**** ********** **. **

Grand Rapids, MI

616-***-****

**************@*****.*** architect

c u r r i c u l u m v i t a e

L u c a s J. H o l w e r d a

4579 Meadowlawn Dr. SW

Grand Rapids, MI

616-***-****

**************@*****.***

e d u c a t i o n

08.11 - 05.13 Master of Architecture

Ball State University, Muncie, Indiana (GPA: 3.98) - Top of Class Extreme Environments Response: Global Disaster Surgical Module (thesis) 09.05 - 05.07 Bachelor of Science, Architecture, deans list The University of Michigan, Ann Arbor, Michigan

01.03 - 05.05 Associates in Arts, deans list

Grand Rapids Community College, Grand Rapids, Michigan 09.98 - 06.00 Civil Engineering Certifi cate

Community College of the Air Force

Naval Construction & Training Center, Gulfport, Mississippi p r o f e s s i o n a l p r a c t i c e

2015 - 2017 C2AE / Grand Rapids MI

2 0 1 7 Fairview Elementary School / Lansing MI

-57,000 SF. Addition (16 Million)

-Life Cycle Analysis

-Future Expansion Analysis and proposal

2 0 1 6 Ann Arbor VA / Ann Arbor MI

-20,000 Sq. Ft. / Retrofi t (13.2 Million)

-Expand Endoscopy & Pulmonary Clinic Spaces

-Maintain phased project to allow for continual use during Const.

-Increase effi cency in patient and employee fl ows. 2 0 1 6 Coopersville Area District Library / Cooopersville MI

-9,200 Sq. Ft. / Retrofi t (2 Million)

-$4,600 Sq. Ft. new addition and 4,600 Sq. Ft. remodeling with large porch and MakerSpace

2 0 1 5 MCC Downtown Center / Muskegon MI

-87,000 Sq. Ft. / Retrofi t (14.7 Million)

-Housed in the former Muskegon Chronical Building

-Program includes entrepreneurial programs, Maker Space, Fab Lab

& Steelcase’ s Learn Lab for their experiential program 2015 Paradigm Design / Grand Rapids MI (Consultant) 2 0 1 5 Marcus Theater / Shakopee WI

2260 Seats / Greenfi eld (5.4 Million)

-Full restaurant included

-Future Expansion Analysis and proposal

2 0 1 5 Moorhead Family Entertainment Center / Moorhead, MN 25,000 Sq. Ft. / Retrofi t (3.7 Million)

-Laser Tag, Brewery/Bar, Restaraunt and Bowling

-Existing facility retrofi t w/ full thermal upgrades Project Architect

Project Architect/

Medical Planner

Project Architect

Project Architect

Project Architect

Project Architect

cont’d

c u r r i c u l u m v i t a e

L u c a s J. H o l w e r d a

4579 Meadowlawn Dr. SW

Grand Rapids, MI

616-***-****

**************@*****.***

2014 - Date Holwerda Architectural Consulting LLC/ Grand Rapids MI 2 0 1 4 - 2 0 1 5 Michigan Blood / Various Lociations MI Master Facilities Planning / Life Safety Analysis

Process Improvement Analysis

2 0 1 4 - 2 0 1 5 Spectrum Health / Big Rapids MI

MOB Learing Center Redesign Consultation

2013-2014 Progressive AE / Grand Rapids MI

2 0 1 3 - 2 0 1 4 Mercy Health Full Consolitation / Grand Rapids MI 260 bed, 500,000 Sq. Ft. / Renovation (270 Million)

-Multi-Campus Consolidation

-New 6 story tower addition to existing facility

-Campus process analysis and improvement

2 0 1 3 - 2 0 1 4 Michigan Blood / Grand Rapids MI 8,314 sq. ft. Blood Lab Alteration / Renovation (1.6 Million)

-Pre./Post DNA Aplifi cation redesign and processing analysis

-Component Lab and Cold Storage effi ciency and fl ow improvements

-Process analysis, distribution expansions and Apheresis Therapy redesign 2 0 1 4 Mercy Health Lakeshore Campus / Shelby MI

Mobile MRI Loading dock redesign (120k)

-Bellows redesign and MRI egress ramp re-engineering 2007-2011 HBE Corporation (Hospital Builders & Equipment) / Saint Louis MO 2 0 0 8 - 2 0 1 1 Community Memorial Hospital/ Ventura CA 227 bed, 348,743 square foot hospital addition (185 Million)

-Miscellaneous equipment coordination & specifi cation

-Contract Administration & Engineering Coordination 2 0 0 8 San Antonio Community Hospital/ Upland CA

186 bed, 195,600 square foot hospital addition (99.8 Million) 2 0 0 8 Sacred Covenant Medical Center/ Willminton DE 125 bed, 274,000 square foot hospital addition (125 Million) 2 0 0 7 - 2 0 0 8 Orange County Regional Medical Center/ Wallkill NY 374 bed, 621,000 square foot replacement hospital (195.5 Million)

-Miscellaneous equipment coordination & specifi cation o t h e r p r o j e c t s

2 0 0 6 Mapping Bombay/ Mumbai India + Rajastan State explore modes of mapping and representation that encapsulate the city in its present form.

r e l a t e d e x p e r i e n c e

2 0 0 2 - 2 0 0 7 River City Mechanical/ Comstock Park MI

-commercial plumbing and medical gas fi eld installations 2 0 0 0 - 2 0 0 2 H & H Plumbing and Heating/ Greenville MI

-commercial plumbing and medical gas fi eld installations 1 9 9 8 - 2 0 0 0 United States Air Force/ United States of America

-wartime engineering operations and peacetime facilities control 1 9 9 5 - 1 9 9 8 H & H Plumbing and Heating/ Greenville MI

(Summers) -commercial plumbing and medical gas fi eld installations Principal

Principal

Medical Planner /

Project Architect /

Medical Planner /

Project Architect /

CA

Medical Planner /

Project

Architect

Project Architect

Design Associate

Design Associate

Production Architect

Researcher

Commercial Plumber

Commercial Plumber

Civil Engineer,Combat

Controller

Commercial Plumber

cont’d

c u r r i c u l u m v i t a e

L u c a s J. H o l w e r d a

4579 Meadowlawn Dr. SW

Grand Rapids, MI

616-***-****

**************@*****.***

a w a r d s & h o n o r s

2 0 1 3 The American Institute of Architects School Medal and the Certifi cate of Merit

- Top Ranking Graduate

2 0 1 3 AIA Indianapolis Excellence in Architecture Award

- Project Under 4 Million

2 0 1 3 ARCC / Jonathan King Research Medal for innovation, integrity, and scholarship in architectural research

2 0 1 3 The ULI/Gerald D. Hines Student Urban Design Competition

-1 of 4 National Finalists from 149 Teams

2 0 0 0 Airman of the Month (January 2000)/ Holloman AFB, NM 1 9 9 8 Long-Jump Record (23’ 11-3/4”)/ Thornapple-Kellogg High 1 9 9 8 All-State Award - Soccer/ Thornapple-Kellogg High 1 9 9 8 All-State Award - Track/ Thornapple-Kellogg High 1 9 9 7 - 1 9 9 8 All-Conference Award Soccer / Thornapple-Kellogg High 1 9 9 7 - 1 9 9 8 All-County Award Soccer / Thornapple-Kellogg High c o m p u t e r l i t e r a c y

AutoCAD ADT 14

Rhinoceros 5.0

Illustrator

Grasshopper

Revit 2014

Photoshop

InDesign

MasterCAM 5

SketchUp

Maxwell Render 3.2

3d Max

m e m b e r s h i p & l e a d e r s h i p

2 0 0 7 - 2 0 0 9 College Intern Recruitment/ HBE Corporation Saint Louis MO

2 0 0 7 - 2 0 0 9 Continuing Education Committee/ HBE Corporation Saint Louis MO

2 0 0 5 - 2 0 0 7 ARC/ University of Michigan

Ann Arbor MI

2 0 0 4 - 2 0 0 5 Student Body President/ Grand Rapids Community College Grand Rapids MI

m i l i t a r y e x p e r i e n c e

1 9 9 9 Survivial Training and Wartime Construction/ Various Loci. 1 9 9 9 Peace Ops. Construction Team/ Saudi Arabia & Japan 1 9 9 9 Leadership Training/ Air Force Academy

c u r r i c u l u m v i t a e

L u c a s J. H o l w e r d a

4579 Meadowlawn Dr. SW

Grand Rapids, MI

616-***-****

**************@*****.***

r e f e r e n c e s : Kathy Ball - Senior Human Resources Manager Progressive AE - Grand Rapids MI

ph: 6 1 6 . 3 6 1 . 2 6 6 4

Lon Morrisson - Senior Director, Facility Managment Services and Capital Planning Mercy Health - Muskegon MI

ph: 6 1 6 . 3 6 1 . 2 6 6 4

Jarrad Pitts - Director, Facilities and Environmental Safety Michigan Blood - Grand Rapids MI

ph: 6 1 6 . 2 6 2 . 9 8 7 6

Michel Mounayar - Associate Dean

College of Architecture & Planning - Ball State University ph: 7 6 5 . 2 8 5 . 5 8 5 9

Mahesh Daas - Dean and ACSA Distinguished Professor The University of Kansas School of Architecture, Design & Planning ph: 7 6 5 . 2 8 5 . 1 9 0 4



Contact this candidate