Objective

Seeking a position with a progressive international engineering company committed to excellence and modern state of the art technology as a Design Manager, Coordinator / Consultant / Design Group Supervisor

Profile

Motivated, personable business professional with more than 30 years’ experience in both petrochemical and offshore related projects. Talent for quickly mastering technology as well as leadership and communication with professionals and non-professionals. Participation at all levels from bid packages, estimates, 3D modeling and drawing extraction to going on site and working directly with fabricators, construction & craft personnel. Twenty years plus as design manager for small projects as well as mega jobs over 5 billion dollars, maintaining budgets, engineering cost and manhours by implementing standards and procedures and the elimination of redundant work processes

Flexible and versatile – able to maintain focus and a sense of humor under pressure. Poised and competent with demonstrated ability to easily transcend cultural differences. Thrive in deadline-driven environments. Excellent team-building skills.

Skills Summary

PDMS

PDMS DRAFT

PDS – FrameWorks Plus

CadworX

Microstation

Tekla

AutoCAD

SP Materials

Scheduling

Bentley – AutoPLANT

Revit

Estimates

Report Preparation

Document Control – idocs. Documentum

Microsoft Office

Leadership

Progress Reporting

Client liaison

Professional Experience

HOUSTON OFFSHORE ENG. 01/2014 – 05/2015

SR. PRINCIPAL DESIGNER

Design Lead for all Topsides – Responsible for the overall coordination of all 2D and 3D applications related to Topsides. Managed a group of designers delegated to projects, distribution of work, maintained master drawing index while measuring progress. Worked with client to ensure company standards, QA/QC procedures and document numbering specifications as well as providing weekly reports to project management and engineering. Coordinated work with other disciplines, piping, electrical and mechanical. Attended meetings with client, model reviews and management training.

MUSTANG ENGINEERING LP – 11/2011 TO 12/2013 – SR. STRUCTURAL DESIGN/CHECKER

Shell Deerpark-revamp project installing and fit-up of new equipment, piping and steel. FRAMEWORKS.This was a revamp project utilizing laser scanning as well as field trips to the site.

Assigned to the “INPEX ICHTHYS” LNG Project. A Mega $35 billion grassroots multinational project off the northern coast of Australia. R responsible for the Central Processing Facility which when completed will be the largest Semi-Submersible in the world. Fabricator – Samsung Heavy Industries

Responsibilities – Checking Primary Steel – Nodes and Grid Lines

Secondary Steel (Framing for all the Modules) Tertiary Steel – Equip Supports – H.R. Plating and Grtg

Mentored a small group of approximately 12 designers to ensure clients standards and procedures were met and that work was completed within an aggressive schedule

PDMS Design & DRAFT, AutoCAD, Documentum

CB&I LUMMUS, INC. – 2009 TO 11/2011 CIVIL STRUCTURAL DESIGN SUPERVISOR

Assigned to the Cartagena Refinery Expansion Project, Colombia, a multi-unit 3.5-billion-dollar project as Design Supervisor as well as Civil/Materials Manager.

3D model for project PDS – Tekla for C/S

Responsibilities include all Material Requisitions for Inquiry & Purchase and the direct input of all piecemarks, anchor bolts, structural bolts, catch basins & manholes and any other tagged items or bulks.

Direct supervision of all steel drawings to six separate fabricators as well as being part of a shop qualification team in Bogota (BOCAD Steel Detailing Package)

Lead Design Coordinator for eighty-four modules (design & shop dwgs) being fabricated by CB&I at the Island Park fab yard in Beaumont, TX.

Oversaw the daily work of up to 100 designers at peak of project, distributed work packages, weekly progress reports and manhour estimates.

Ensured the document numbering system using idocs for all documents including drawings, reports, requisitions, and all other documents related to project from inside the company as well as those from vendors

Supervised the work of nine different fabricators and was responsible for all shop drawing approvals and served as liaison both domestic and international.

EDOXX ENGINEERING – 2006 TO 2009 DESIGN MANAGER/BUISNESS DEVELOPMENT

Responsible for managing a multi discipline design group in all areas from start to finish:

Client liaisons – Assignment of work – Scheduling – Model Revues – Performance Evaluations

Launched a low cost engineering unit by employing engineers and designers primarily from Columbia with minimal overhead and lower billing rates.

Developed and implemented strategic marketing plan for business:

Created a new business model focused on the owner operators for “Life Cycle Management”.

Attended conferences dedicated towards the implementation of ISO 15926

Presented sales and marketing presentations to potential customers.

Implemented PDS for design and configured workstations and server

Microstation

CadworX and AutoCAD

PDMS

ABB LUMMUS GLOBAL INC. – 1988 TO 2006 – DESIGN COORDINATOR GROUP LEADER

Worked on many jobs in the petrochemical and offshore (Deep Water Division) sectors as a Sr. Structural Designer and Project Group Leader, utilizing the latest software of the day from 2D AutoCAD to 3D modeling. Developed new procedures for the C/S department for standardization and completion of work. As part of the Materials Management team my responsibilities were to aid, assist and train the RO’s (Requisition Originators) in the writing of all requisitions and purchase orders by using Smart Plant Materials.

Attended numerous training classes while at ABB including QMS, QA/QC, Leadership and management training, multiple cad software training for both 2D and 3D applications and material management, extensive document control for several systems

Highlighted projects at ABB:

Meraux Clean Fuels Project – Murphy Oil – (Group Leader) – PDMS and AutoCAD – after engineering completion assigned to the plant for field engineering support for one year.

Monsanto – (Group Leader) - Herbicide Plant, Camacari, Brazil – PDS/FrameWorks/Microstation SE

Coastal – Delayed Coker Plant – (Group Leader) PDS/FrameWorks Plus/Microstation

Mobil Yanpet – Grass roots Ethylene Plant – PDS/FrameWorks Plus/Microstation

Mobil – NGL – Jacket and Decks for Offshore Gas Recovery Plant – (Group Leader) Model Draft/PASCE/AutoCAD – Field Engineer during construction and installation

Coastal - Delayed Coker (joint venture with LITWIN) - Aruba - MODEL DRAFT

Hawtah – (Group Leader) - GOSP Facility for ARAMCO - Saudi Arabia

Resilin – LPE plant Venezuela – (Group Leader) - AutoCad

NL Chemicals - Titanium Dioxide Facility, Lake Charles, LA

AES Shady Point, Inc. – Power Plant Panama, OK

Professional References

Joey Lopez

Houston Offshore Engineering

Owner/ Manager of Design

+1-281-***-****

******@*******-********.***

Mark R. Fox

Conoco Phillips

Training Coordinator/Instructor

+1-281-***-****

****.*.***@**************.***

I.S. Desai

Technip - Chicago Bridge and Iron (Lummus Division)

Civil/Structural Engineering Lead – Cartagena Refinery Expansion Project

+1-281-***-****

John Donnelly

Bechtel OG&C

Sr. Piping Designer

+1-713-***-****

********@*******.***

Vastine East

Mustang Engineering

Sr. Structural Designer

832-***-****

*******.****@**********.***



Contact this candidate