Post Job Free
Sign in

Manager Project

Location:
Fernandina Beach, FL, 32034
Salary:
95K-105K
Posted:
March 31, 2017

Contact this candidate

Resume:

W. ALAN LLOYD

***** ***** ***** *****, ************, FL 32246

229-***-****

********@*****.***

OVERVIEW

Senior Engineer / Electrical Design Engineer with business acumen in various industries (power generation, underground utilities, pulp & paper, specialty chemical, consumer products), and other large industries. Notable projects include:

Design Manager for Electrical & Control Installation for Georgia Pacific, Rincon, GA, PM20 Outage

Design Manager for Electrical & Control Installation for Georgia Pacific, Rincon, GA, Pulper Outage

Technical Manager for Design / Build of Cogeneration project for Chevron Chemical, Belle Chasse, LA

Technical Manager for Design / Build of Cogeneration project for Air Products Corp., Santa Rosa, FL

Project Manager for the Design & Installation of Upgraded Power Boiler Controls, International Paper

Project Manager for the Design & Installation of Upgraded Power Boiler Controls, Rayonier Pulp & Paper

Design & Construction Superintendent to rebuild for Georgia Pacific, Prosperity, SC, Plywood Plant

Design & Construction Manager to build Georgia Pacific’s Modernized Woodyard, Madison, GA

Designed DCS & PLC “Cut-Overs” for Paper & Building Products Plants

Improved SCADA Systems for Kaolin Processing Plant

Developed Technical Operational procedures for Kaolin Processing Plant

Improved SCADA Systems for Pulp & Paper & Chemical processes

Designed SCADA Systems for Waste Water Treatment facilities, Dekalb County GA.

Specification Writer for Energy Management Systems for Steel industry EDUCATION, CERTIFICATION AND RECOGNITION

B.S., Electrical Engineering, 1982

Auburn University, Auburn, AL

E.I.T., State of Alabama

Chairman’s Award, Special Projects, Georgia Pacific, 1992

Letter of Accommodation, International Paper / Fru-Con Watkins, 2001

INPO ACAD Nuclear Engineering School, 2010

PROFESSIONAL EXPERIENCE

BILFINGER ENGINEERING, Jacksonville, FL August, 2016-Present Controls Engineer / Project Manager

Axen / Calder Project, Calvert City, KY: Power & Controls Design of the new Mother Solution Project and associated vessels, tanks, and piping equipment installation in the client’s upgraded facility. Writing bid scope documents and construction installation instructions and operating procedures. JEDSON ENGINEERING, Jacksonville, FL 2015-September 2016 Controls Engineer / Project Manager

Georgia Pacific Paper Mill / Rincon, GA: Instrument & Controls Design of the new Virgin Fiber Pulpers and associated piping equipment installation in the Pulping Module.

Georgia Pacific Paper Mill / Rincon, GA: Instrument & Controls Design of the new PM20 Winder Bypass by Valmet and Globe equipment installation for PM20 paper machine.

Procter & Gamble Paper Mill/ Albany, GA: Instrument & Controls Design for installation and operation of pre- heat steam coils for 5APM & 6AP.

R&L ENGINEERING, Albany, GA 2012-2015

Project Manager / Electrical Designer / Client Manager

Georgia Pacific, Madison, GA: Electrical Design, Construction Support, Rockwell Program Development for Globe Manufacturing Pre-Press Transfer Equipment.

Georgia Pacific, Madison, GA: Electrical Design, Construction Support, Rockwell Program Development for Complete Woodyard Upgrade installation.

Mulcoa CE-Minerals / Andersonville, GA: Kaolin Processing Facility–Electrical & Controls Upgrade for Mills 2, & 3

Oil-Dri Corpration, Thomasville, GA: Design, Construction Support, Rockwell Program Development for the Williams Mill equipment installation.

Active Minerals, Gordon, GA: Kaolin Processing Facility– Electrical & Controls Upgrade for Mills 1,2, & 3 SOUTHERN COMPANY, Farley Nuclear Plant, Columbia AL 2010-2012 Senior Engineer / Reliability & Quality Engineer

Field Investigation to Define Project Scopes as Utility Manager/Designer

Wrote Plant-wide Operational Procedures for Diesels & Substations

Validated Power Plant Maintenance Work as Utility Engineer

Provided Root Cause Analysis & Correct Actions for Plant Equipment Failures

Project Engineer for Steam Generator Maintenance projects

Project Engineer for Diesel Generator Upgrade projects RAY LLOYD REALTY & CONSTRUCTION, Leesburg, GA 2003 – 2009 Construction Superintendent

Managed Construction Activities, Directed Engineers & Architects

Negotiated Contracts and Legal Scopes, Managed Budgets & Cost Accounting

Field Superintendent & Finishing Contractor supervisor

Real Estate Broker & Rental Property Manager

WATKINS / FRU-CON ENGINEERS, Tallahassee, FL 1996 – 2003 Project Engineer

Design Manager: Green Field Industrial Facilities

Technical Leader: Build Co-Generation Plant SCADA Sys. for Chevron Chemicals

Technical Leader: Build Co-Generation Plant SCADA Sys. for Air Products Co.

Georgia Pacific, Prosperity, SC: Plywood Plant Construction Superintendent for rebuild

International Paper Co., Pineville, LA: Designed and Installed Burner Management - Boiler Controls Upgrades. Installed and Started Up Automated Lime Kiln Drive & System

Rayonier Pulp & Paper, Fernandina Beach, FL: Installed Burner Management - Bark Boiler Controls Upgrade HMI Screen Development & Metering for Steam Balance

Air Products / Pace, FL & Chevron Chemical, Belle Chasse, LA: Discipline Lead for electrical design oversight; construction mgmt., applications engineering and technical design for (3) 15 MW Co-generation units.

GEORGIA PACIFIC COMPANY, Atlanta, GA 1984 -1996

Electrical & Controls / Project Engineer

Start-up Team Leader, Green Valley, WV: Hardwood Sawmill (PLCs and Siemens Drives)

Cross City, FL: Design Leader - Southern Pine Sawmill (PLCs) Saw Log Mill Technology

Roxboro, NC: Electrical Superintendent – LVL and Wood I-Beam Plant Wood Yard & Bark Boiler

Ocala, FL: Project Engineer- Wood I-Beam Facility - Complete Plant

Prosperity, SC: Project Manager - Complete Plywood Plant Re-build

Cuba, MO: Project Engineer -Door Core Plant (Networked PLCs) Batching, Processing, Weigh Scales

Franklin, OH: Installation of Fuller Filler Heater Installation Automatic Slate Gate Control System Installation



Contact this candidate