Post Job Free

Resume

Sign in

Maintenance Technician Professional Experience

Location:
Hadley, NY
Salary:
negotiable
Posted:
March 23, 2017

Contact this candidate

Resume:

Objective

I would like to expand my career in the electrical industry, in a challenging environment at a well-established company. Also, looking to relocate, and obtain my qualifications and more.

Key Skills

Professional Experience

(continued)

1990-1997

Issue and Receiving Clerk

-Handling spare parts inventory for mill wide maintenance repairs

-Promotion to Predictive Maintenance Technician

1989-1990

Temporary Worker

-various types of labor work

-hired full time

Education

Tri-City J.A.T.C. 1999-2004

Graduated top (1st) in class as a Journeyman Wireman

-A.C. and D.C. theory

-Power generation/distribution

-National electrical code

-Grounding

-Three phase wiring

-Transformers

-Industrial motors

-Control circuits

-Electronics

-Blue prints/schematics

-Structured wiring

-Cat 5 cable installation

-Fiber optics

-Conduit bending and installation

-Wire way installation

Adirondack Community College, NY 1988

Bay Road Queensbury NY, 12804

Glens Falls, NY High School 1987

Regents Diploma

15 Quade Street Glens Falls, NY 12801

– Electrical Systems Installation

– High voltage terminations

– Conduit Installation

– Blueprints & Schematics

– Generators & Transformers

– Maintenance/Troubleshooting

– Electrical Code

– Motor Installation

– Wiring Diagrams

– Control Circuits

– Testing Instruments

– Testing Instruments

Professional Experience

– The Hour Electric Company, NY

1999-Present

Foreman

-Project layout

-Material orders

-Manpower requirements and coordination with other crafts

-Meet the customers time deadlines and project budgets while in accordance with established lockout tagout procedures and NFPA70E arc flash requirements

Electrician

-Industrial Electrical construction

-Maintenance

-Repair and troubleshooting

-High voltage switchyard construction and repair

-Motor control center installation

-Three phase power distribution

-Transformer installation/troubleshooting

-Three phase motor installation/troubleshooting

-Control circuit installation/troubleshooting including PLC’s, DC drives and AC Variable Speed Drives

-Installation of different raceways including rigid, IMC, EMT conduit and cable tray

–Finch Pruyn & Company Incorporated, NY

1997-1999

Predictive Maintenance Technician

-Tracking possible critical equipment failure through vibration analysis of rotating machinery



Contact this candidate