Post Job Free
Sign in

Engineer Process

Location:
Sugar Land, TX
Posted:
March 19, 2017

Contact this candidate

Resume:

Kazemi *

Mohammad Reza Kazemi

**** *** * ***** #*** ; Sugar Land, TX 77478

Cell: 713-***-**** Email: *.****.******@*****.*** Green Card Holder ( Permanent Resident of the United State) WORK EXPERIENCE

Chicago Bridge & Iron Company (CB&I) January 2015 – Present Senior Process Engineer- Free Port LNG Project (13.9 MTPA LNG Production and 2Bscfd Regasification) at Quintana Island, Freeport Texas, USA

Freeport LNG Project: I‘m doing the Flare Study by Aspen Flare System Analyzer Software, This study addresses the expected handle the maximum loads from the Liquefaction and pretreatment Facility for the Freeport LNG trains to the Freeport LNG Ground Flare Systems, and documents design data for the pressure relief, flare and emergency depressuring systems. The Liquefaction Facility (LQF) design includes a single dry gas flare system that serves the three liquefaction trains and the new common utilities. Global overpressure scenarios are modelled and system capacities have been reviewed with respect to hydraulics and blowdown timing and staging requirements. The purpose of this flare system evaluation is to determine the adequacy of the ground flare system at the Liquefaction and pretreatment Facility Freeport Project

Senior Process Engineer- Cameron LNG Project (1.5 BSCFD supply, LNG Terminal) for Sempra LNG at Hackberry, Louisiana, USA

This Involves:

P&ID development

Hydraulic calculations

Pressure relief contingency analyses

Simulation work

Prepare Spreadsheet for API Std. 2000 Calculation

Interdisciplinary coordination for management of change (MOC) process

Vendor data review

HAZOP Study

Central Oil Fields Company (COFC) June 2009 – September 2014 Central Oil Fields Company, established in 1999, is one of the five major production companies of NIOC. It is responsible for production of gas and oil through 68 reservoirs including 43 gas fields and 25 oilfields among which 9 oilfields and 14 gas fields are producing oil and gas and by the end of the 20 year outlook plan it will have reached 89 fields in 19 provinces.

Senior Process Engineer – Detailed Design for Sarajeh Separation Area Project -Tehran Project metrics – Operating Facility producing 10 thousand barrels per day and 9.8 million standard cubic meters per day of gas; Recovered oil transferred on to a refinery and gas sent to a Gas Sweetening and dehydration unit for injection into the Gas Transmission Pipeline.

Senior Process Engineer – Front End Engineering & Design (FEED) for Dehloran Gas Compression station-Tehran Project Metrics – Facilities for the processing of produced gas from the Dehloran field, initial separation is done in a central separation area, which is under N.I.O.C responsibility, and injection gas compression. The capacity of plant gas production is 20 MMSCMD and for gas injection is 10 MMSCMD. This Involves:

• Performed process simulation, utilizing HYSYS software to determine sizing for piping, vessels, and pumps

• Reviewed and approved line list, Instrument list and equipment list

• Prepared process flow diagram and P&ID, cause and effect diagram. Kazemi 2

• Conducted transient analysis (OLGA) and De-pressuring calculation, Hydrate formation calculation

• Developed control and operating philosophies, conducted Design reviews, and other deign/integrity assurance activities

• Performed process simulation with PRO II including De-pressuring calculations Bou Ali Sina Petrochemical Company September 2000 – June 2009 The Bou Ali Sina Petrochemical Company is the 3rd Aromatics producing complex in producing about 4.5 million tons/ year of different products. This Aromatic complex was started to construction in late Nov. 1998 and came to stream in June 2003.

Process Engineer – Checking of PDP Information for Light Naphtha Hydrotreater (LNHT) – Axens License 2008 – 2009 Mahshar

The LHDT unit capacity is 113 000 kg/h with an on stream factor of 8000 h/yr.

Conducted trouble shooting for installing a new unit on a cooling water system by performing cooling water network balancing and modeling in PIPENET software

Performed Process Simulation with PRO II including De-pressuring calculations

Line sizing in PROII, Vessel sizing, and Compressor sizing

Developed and reviewed Utility Flow Diagrams (UFDs), PFDs and P&IDs

Produced Line list, Instrument List, Cause and effect table

Developed Control and operating philosophy, and Tie-in philosophy

Led HAZOP reviews including closeout of items

Process Engineer – Basic Endorsement of KEROSENE Hydro-Treater (KHDS) – Axens License 2007 – 2008 Mahshar

The main purpose of the KHDS unit is to hydrotreat a blend of kerosene streams and/or of blended naphtha, in order to produce a kerosene stream characterized by low sulfur content (less than 50 ppm weight). The unit capacity is 31,500 BPSD with an on stream factor of 8400 hours per year. Process Engineer –Basic Endorsement of Gas-Oil Hydro-Treater (GoHDS) – Axens Licence 2006 – 2007 Mahshar

The GOHDS unit hydrotreats a blend of diesel streams and/or of blended naphtha in order to produce a diesel stream characterized by low sulfur content (less than 10 ppm weight). The design capacity of the Gas Oil Hydro Desulfurization Unit is ~53,000 BPSD with an on stream factor of 8,400 hours per year.

Checked/Performed Process Simulation with PRO II

Checked and validated various equipment datasheets

Developed and reviewed Utility Flow Diagrams (UFDs), PFDs and P&IDs

Produced Line list, Instrument List, Cause and effect table Process Engineer – Corrosion Study & Remediation for Naphtha Fractionation Unit 2005 – 2006 Mahshar

Checked feed composition and performed scale analysis for Naphtha fractionation unit experiencing corrosion and scaling problems

Recommended installation of Liquid/ Liquid Coalescer to remove water from naphtha and injection filming inhibitor on top of tower

Process Engineer – Study for Expansion & Revamping of Pyrolysis Gasoline Unit 2004 – 2005 Mahshar

Tasked with finding bottle neck in equipment and making recommendations for modifications to Pyrolysis Gasoline Unit

Checked process simulation for new feed composition and condition using PRO II software

Checked PFDs,P&IDs, UFDs, checked compressor and vessel sizings and other process engineering activities Kazemi 3

Operation Engineer – Pre-Commissioning and Commissioning of Petrochemical Facility 2000 – 2004 Mahshar

Involved Monitoring of equipment installation during construction, pre-commissioning, commissioning, pre startup and startup of Refinery and Petrochemical plant (Example: Gas Condensate Pre Fractionation, Naphtha Hydro treater and Pyrolysis Gasoline Hydrogenation Unit)

Pre-Commissioning Activities

Checked P&IDs including isometrics of pipelines

Supervised installation of trays in distillation columns & Heater, Reactor, Vertical Plate type HX internals

Witnessed Site Acceptance Test (SAT) of instruments

Prepared Standard Operating Procedures (SOPs) for safe plant activities

Performed Logic checking (trips/interlocks/ESDs) of whole Aromatics unit from DCS (Yokogawa)

Final checking before final box up of natural draft heaters;

Alignment checking of U-tubes (radiation zone) and burners

Pigging in U tubes, checking of convection zone-piping etc.

Involved in Project Management including providing and maintaining daily status records of pre-commissioning activities.

Commissioning Activities

Conducted Equipment specific commissioning including Heaters (balanced & natural draft)-Burner Management System (BMS) for startup/shutdown and Compressors (centrifugal and reciprocating ) startup/shutdown sequence checking

Performed Pre-Startup Safety Review (PSSR) of Aromatics unit.

Involved in Heater-Reactor dryout process including load trials of pumps and compressors. PROFESSIONAL COURSES & CERTIFICATION

Transportation Worker Identification Credential (TWIC)

ProMax Training-Oil and Gas Processing- Bryan Research & Engineering Inc.

EXCEL VBA- LANTEC Inc.

Process Modeling Using Unisim Design & Unisim Flare-Honeywell

Flow Assurance with OLGA – SPT GROUP

EFQM Excellence Model in Action Training Course – MKP

International Gas Processing Seminar – Shell Global Solutions

Theoretical Training and the Plant Operation Training – Uhde

Process Technology Course – Axens

Energy Conservation in Process Industries – Inst. Of Technical Researchers EDUCATION

Master of Science in Chemical Engineering Gas Processing & Transmission Emphasis Petroleum University of Ahwaz Ahwaz, Iran September 2002 – June 2005 Bachelor of Science in Chemical Engineering – Petrochemical Emphasis Azad University of Arak Arak, Iran September 1995 – September 1999 OTHER SKILLS

Computer/Software Proficiency

Proficient in HYSYS, PRO II, ASPEN PLUS, OLGA, PVT SIM, PIPENET, PIPSIM, & HTRI Process Engineering Software

Microsoft Office Applications in including Word, Excel, Power Point, Outlook and Access Kazemi 4

Language Proficiency

English

Farsi – Native

PUBLICATIONS

M.R.Kazemi, M.Jamialahmadi. Pressure drop and Bed Expansion in turbulent Bed Contactor, Farayandno Magazine, 2006; 2.

M.R.Kazemi, M.Jamialahmadi. Pressure Drop and Bed Expansion in Turbulent Bed Contactor, 10th congress of Chemical Engineering Siystan and Baluchestan University, 2005. M.R.Kazemi, M.Moshfeghian. Correlation of Critical Temperature and Pressure of Light Hydrocarbon Mixture, 17th international congress of chemical and process engineering, Prague, 2006. REFERENCES

Available on Request



Contact this candidate