Post Job Free

Resume

Sign in

Manager Project

Location:
Tomball, TX
Salary:
125,000
Posted:
May 10, 2017

Contact this candidate

Resume:

VICTOR N. GOMEZ

***** ***** *** **. *******, TEXAS 77070

281-***-****

Summary

Production centered individual with a background in all aspects of plant fabrication and design engineering with all oilfield equipment and supervision experience in both fields.

Managing and controlling all phases of project management, production, engineering, sales and expense budgets, processing, expediting, quality control, shipping, receiving, inventory control, personnel, sales, marketing, purchasing, customer relations.

Hands on experience with complete knowledge of oilfield equipment design, fabrication and assembly, machine shop equipment (CNC and manual equipment), welding fabrication (MIG, TIG and ARC welders and plasma cutting equipment), as well as sheet metal fabrication equipment.

Trained in Lean Manufacturing and completed several lean projects.

Bi-lingual professional fluent in English and Spanish.

Highlights

Engineering/project management experience

Full P&L Responsibilities

Capital Project Management

Lean Manufacturing

Initiative to work independently

Organizational skills

Experience

Project Manager

March 26, 2015 to December 2, 2016

National Service Alliance

6410 A Langfield, Houston, Texas 77092 - 713-***-****

Project Manager on $3 MM project building a stimulation high pressure pump test facility. Worked on the mechanical aspect of the facility including all of the structural skids and support systems, high and low pressure water loop for testing, oil and hydraulic cooling systems and all of the required structure, quick dis-connect water and hydraulic systems as well as consulting for with the customer for training on setting up and testing stimulation pumps. Worked with contractors and subs on all aspects of design, permits, procurement, reporting, and commissioning in a cradle to the grave situation.

Consultant and supervisor over all mechanical aspects related to electronics integration managing all aspects of engineering related to component and material specification and fabrication including creating and maintaining bills of materials, design drawings, layouts and assembly.

Consulting on electronic enclosure and component heat exchangers and heat pipe technology.

Interaction during contract reviews to determine scheduling, client requirements and specifying product requirements.

Package Design Supervisor

Feb. 28, 2012 to Feb. 9, 2015

Weatherford Intl., Pump & Fluid Systems

339 Magnolia Business Park Dr., Magnolia, Texas 77354 - 281-***-****

Supervisor over all Industrial and Mud Pump packaging managing all aspects of engineering related to all fabrication including creating and maintaining bills of materials, design drawings and operation manuals.

Managed projects totaling up to $25 million within a 6-month period.

Interaction during contract reviews to determine scheduling, client requirements and specifying product requirements.

Follow through all packaging projects from initiation with customer requirements through to completion including testing and preparation for shipping for customer acceptance.

Sr. Project Engineer

October 8, 2007 to Feb. 28, 2012

Weatherford Intl., Artificial Lift Systems

1105 Grandview., Odessa, Texas 79761 - 432-***-****

Sustaining engineer supporting all aspects of industrial pumps and packaging.

In charge of other major projects such as overseeing addition and design of new $3MM test facility and control center for growth of business as well as overseeing all prototype and production product testing.

Oversaw prototype fracturing pump assembly, testing and reporting findings for production approval.

Designed and implemented all pump testing equipment and processes.

(Experience continued on 2nd page)

Manager of Production

April 14, 2004 to September 2007

Gardner Denver, Fluid Transfer Division

2121 W. 44th, Odessa, Texas 79764 - 432-***-****

Managed all P&L for the well servicing pump manufacturing facility.

Supervised all departments including machine shop and welding fabrication, assembly, accounting, purchasing, customer service, human resources, quality assurance as well as safety and environmental.

Maintained all production schedules, oversaw all aspects of employment and training and established budgets for all departments.

Determined and implemented any Lean & Capital Projects required to ensure productivity and efficiency.

Worked closely with engineering both done in house and at main engineering department located at our divisional headquarters.

Managed all sales and expense budgets for all departments.

Increased sales from a sales budget set @ $3 million in 2004 to an estimated $22 million by the end of 2007.

Design Engineer

March 22, 1999 to April 11, 2004

ECKEL MANUFACTURING CO. INC.,

8035 W.C.R., Odessa, Texas 79764 - 432-***-****

Designed and detailed hydraulic tongs and power units and their separate components as per management's specifications.

Created illustrations needed to publish service and operations manuals.

Headed drafting department and controlled all aspects of drawing procedures, maintenance and revisions.

Worked with production to design any jigs needed for manufacturing components.

Operated and trained on ESAB cutting equipment as well as maintained and operated nesting software and files.

Instrumental in implementing ISO 9001:2001 Compliance certifications.

Engineering Manager

October 18, 1997 to February 26, 1999

B & W INSPECTION EQUIPMENT

300 W. 61st Street, Odessa, Texas 79764 - 432-***-****

(Has been acquired by NOV Tuboscope)

Supervised and managed engineering department.

Designed any new products needed in the industry of Non Destructive Testing while working with electronic technicians and pipe inspectors.

Evaluated, estimated, and quoted on material needed for new and modified products.

Managed all of the part numbering system (new numbers, revisions and cross-reference between divisions).

Managed all of the required computer data entry, engineering deviation requests, system backups and all documentation records.

Fabrication Manager

January 16, 1995 to October 15, 1997

INDUSTRIAL INSULATION & SHEET METAL

3339 Kermit Hwy, Odessa, Texas 79764 - 432-***-****

Design Engineer

September 22, 1989 to August 9, 1994

PARKER TECHNOLOGY, INC.

4501 South County Rd., 13 1 0, Odessa, Texas 79765-432-***-****

(Has been moved to Houston, TX and New Iberia, LA)

Production Manager

November 21, 1981 to May 12, 1989

SEAL PRO, INC.

8331 Andrews Hwy, Odessa, Texas 79765-432-***-****

(Acquired and moved to Houston, TX)

EDUCATION

1979

Graduate of Ector High School with Salutatorian status with a 94.10 GPA

1991

Associates in Science Degree from Odessa College with a 3.2 GPA while majoring in Engineering.

Training and Certifications:

AutoCAD 2011 and Inventor 8 • JD Edwards • Lean Manufacturing

Mechanical Desktop • Microsoft Office



Contact this candidate