Post Job Free

Resume

Sign in

Electrical Engineering

Location:
Manor, TX, 78653
Posted:
May 09, 2017

Contact this candidate

Resume:

Corey Mason

***** *. ***** ***** *****

Houston, Texas 77449

713-***-****

acz73b@r.postjobfree.com

Objective

To acquire a position utilizing more than 10-years of combined information technology, and quality assurance experience.

Professional Experience

MANAGED PRESSURE OPERATIONS, Houston, TX (2014 to Present) SENIOR ELECTRICAL / INSTRUMENTATION & CONTROLS DESIGNER

Design custom electrical, P&ID and hydraulic control system drawings.

Direct contributor to key design and on-site commissioning of Subsea projects.

Assist with the specification, design and development of PLC based SCADA systems which involve hardware design and specification, coordination of hardware manufacturer, software development and IECEx and Atex required documentation.

Sizing of low to high voltage supply distribution systems for Factory Acceptance Testing (FAT) and Hardware In Loop (HIL) testing.

Develop electrical, P&ID and hydraulic design and drafting standards for the Controls department.

CATERPILLAR, Milwaukee, WI (2010 to 2014)

SENIOR ELECTRICAL DESIGNER

Designed drawings from customer spec, spec summary and engineering instructions, using Autocad Electrical software. Prepare drawings of electrical/electronic schematics showing parts and components in compliance with the National Electric Code (NEC).

Designed complex layout drawings from sketches showing fittings and arrangement of electrical components. Show dimensions, connections, and other information to demonstrate suitability of design. Prepare electrical enclosure fabrication drawings.

Compiled bills of material. Identify and list: Name, type, size, quantity and catalog number of each part.

Revised electrical and mechanical drawings and bills of material, and write Engineering Change Orders, as instructed.

Provided training to software training to staff members on a needed basis.

Coordinated the integration and implementation of new software for engineering department.

SENTRY EQUIPMENT, Oconomowoc, Wisconsin (2007 to 2010) ELECTRICAL CAD DESIGNER

Design drawings from customer spec, spec summary and engineering instructions, using Autocad Electrical software. Prepare drawings of electrical/electronic schematics showing parts and components in compliance with the National Electric Code (NEC).

Design complex layout drawings from sketches showing fittings and arrangement of electrical components. Show dimensions, connections, and other information to demonstrate suitability of design. Prepare electrical enclosure fabrication drawings.

Compiled bills of material. Identify and list: Name, type, size, quantity and catalog number of each part.

Revised electrical and mechanical drawings and bills of material, and write Engineering Change Orders, as instructed.

Prepared fabrication drawings for monitor panels.

Performed installation, start-up and servicing of Sentry systems and products as well as competitor’s products.

Reviewed customer operation procedures to confirm proper design parameters are being observed.

Verified correct and complete customer installation; check for completed interface from plant to equipment; start up and operate system; troubleshoot problems; perform instrument calibrations and fluid adjustment.

Provided training for customers regarding operation of system. EARTH TECH, Sheboygan, Wisconsin (2004 to 2007)

I&C/ELECTRICAL CAD DESIGNER

Designed Instrumentation and Control schematics and piping diagrams for wastewater treatment facilities.

Designed PLC panel layouts, electrical schematics, one line diagrams, and electrical wiring diagrams.

Created custom toolbar menus for Autocad software to streamline design process. KEY ENGINEERING, Cedarburg, Wisconsin (2000 to 2004) CAD TECHNICIAN

Developed Environmental and Geotechnical CAD drawings.

Responsible for the management of PECFA claims department that has successfully submitted over 350 claims and achieved over 9 million dollars in reimbursements.

Responsible for the performance of the Phase I Environmental Site Assessment due diligence studies performed to ASTM 1527-00 standards. GILES ENGINEERING, Waukesha, Wisconsin (1996 to 2000) CAD TECHNICIAN-MANAGER

Developed site plans for commercial construction.

Imported and modified scanned aerial photos using CAD Overlay software.

Provided computer technical support and CAD management.

Modified architectural plans for building elevations and floor plans.

Created and modified CAD site plans, cross-sections, groundwater-soil plans and detail drawings.

Developed Environmental and Geotechnical CAD drawings. HYDRO-SEARCH, Brookfield, Wisconsin (1995-1996)

CAD TECHNICIAN

Imported and modified scanned aerial photos using CAD Overlay software.

Land base piping design, facilities and conduit, highway and roadway design.

Developed Environmental and Geotechnical CAD drawings.

Designed PLC panel layouts, electrical schematics, one line diagrams, and electrical wiring diagrams.

Additional Experience and Certifications

IEC Ex and ATEX Awareness Certificate 2014

Autodesk AutoCAD Electrical 2015

Autodesk Inventor 3D 2015

Rebis Autoplant P&ID

Microsoft Excel/Word/Office/Outlook

ERP Systems: SAP, Matrix, Global Shop



Contact this candidate