Larry Ruddell, Jr – Lead Supervising Inspector

Mr. Ruddell has over 19 years of extensive experience in the engineering and construction industry. He has worked for a water district starting in operations and maintenance and then transitioning to Senior Engi- neering Inspector. He has extensive experience in inspecting and man- aging the construction of facilities in the area of water, sewer and recycled water which includes Pipelines, Sewer lift Stations, Reservoirs, and PRV Stations and Booster stations. He has planned and executed system shut downs to upgrade, repair or replace overtaxed or failing water or sewer appurtenances. He has inspected and certified conform- ance of completed work including all backflow devices that are installed on new district and developer projects; a water filtration plant expan- sion (1O MGD to 20 MGD) supervising up to 30 sub-contract employ- ees throughout the duration of the 3 Xi year contract; various sewer treatment plant upgrades, sewer pipelines, sewer lift stations, sewer force mains, rehabilitation of existing sewer pipelines, laterals, man- holes, wet wells, which also includes related items; inspection of coat- ings, painting, mechanical, structural, electrical, concrete, asphalt, fencing, irrigation, landscaping & construction of three solar plant sites. He is able to resolve field and operational issues related to the construction of infrastructure projects through a very detailed knowledge of the systems' operational requirements, construction con- tractors means and methods, and by developing and maintaining good working relations with contractors, agency staff and other local agen- cies to effectively complete projects.

Project Experience

Anza Reservoir No. 2, Temecula, CA Feb 2016- Oct 2016 Mr. Ruddell served as Sr. Inspector for a $2.SM new 2MG DYK tank reservoir. Project features included piping, site work, landscaping fencing, AC roadway, Cathodic protection, and coatings. Duties include coordination with developer contractors, preparation of daily reports, photographic records, construction contract administration, contract compliance, and oversight of materials testing consultant.

Senior Construction Inspector, Various Developments, Rancho California Water District, Temecula, CA 2007- 2016 Mr. Ruddell completed work as a Sr. Inspector for multiple housing tract developments ranging from 2,000 Linear feet to 7,000 If of sewer and water line construction, fire hydrant and appurtenances, multiple sewer force main jobs, lift stations and collection systems. Duties include coordination with Education

N/A

Registrations/Licenses

N/A

Certifications

NACE Coating Inspector Level 1-CIP

Number 23302

NASSCO-CIPP-514-*******

Public Works Inspection, Palomar

College

NEC Bonding & Grounding

Cal-OSHA 10 Hour

CA D.O.H.S. Grade D1 Water

Distribution

American Concrete Institute Field

Testing Technician – Grade 1 (ACI)

Affiliations

N/A

Years of Experience

MWHC: 1 month

Total: 19

Wallace & Assoc. Senior Construction

Inspector 2016-Present

Rancho CA Water District 2007-2016

EMWD, Construction Inspector II 2001-

2007

EMWD, Engineering Resources

Construction Inspector 1999-2001

EMWD, Tri-Lakes Consultants,

Construction Inspector 1998-1999

City of Gardena, Lawndale & Hawthorn,

Construction Inspector 1997-1998

Ruddell, Larry Jr.

MASTER NOV2016

developer contractors, preparation of daily reports, photographic records, construction contract administration, contract compliance, and oversight of materials testing consultant. Pressure Reducing Station Project, Temecula, CA

Mr. Ruddell provided services as a Sr. Inspector for this $750K project for new pressure reducing stations for at multiple housing tract developments Bear Creek, Vista Del Mar and El Camaron developments. Duties include coordination with developer contractors, preparation of daily reports, photographic records, construction contract administration, contract compliance, and oversight of materials testing consultant. Perris Water Filtration Plant Expansion, Perris, CA Sr. Inspector for this $5M treatment plant upgrade from 10 to 20 MGD. Project features included ultraviolet light treatment system, chlorine contact tank, Zenon cassette filters, piping, Cast-in-place pre-treatment basin, buildings, concrete pads, $CADA, electrical and mechanical room upgrades. Duties include coordination with developer contractors, preparation of daily reports, photographic records, construction contract administration, contract compliance, and oversight of materials testing consultant. New Recycled Water Main, Murrieta, Wildomar and Lake Elsinore, CA Sr. Inspector for this $10M recycled feeder system. Project features included transmission booster pump stations

(6 Pumps) and 11 miles of 48" CMLC pipe, roadwork, paving and utility relocations. Duties include coordination with city and county staff, preparation of daily reports, photographic records, construction contract administration, contract compliance, and oversight of materials testing consultant. Redhawk Development Sewer Project, Temecula, CA

Sr. Inspector for 3,000 linear feet of 8" SDR35 DIP for Home Depot and another 20,000 If of sewer line for other commercial developments within the Redhawk development. Duties include coordination with developer contractors, preparation of daily reports, photographic records, construction contract administration, contract compliance, and oversight of materials testing consultant. Hillside Trail Sewer Relocation @ Bear Creek Development, Murrieta, CA Supervising Construction Inspector for a 300 ft. relocation of Sewer Pipe and construction of 2 new manholes. Duties included oversight of inspection activities which included daily reports with photographic records, detailing the workers, equipment, activities and material incorporated into the project each day. Duties also include utility coordination, coordination of materials testing, geotechnical and other specialty inspection consultants. Vail Lake Transmission Main and Pump Station, Rancho California Water District (RCWD), Temecula, CA Inspection supervisor for the installation of 14,000 lineal feet of 48-inch CML & C pipeline and construction of a booster station capable of pumping 80 cfm of raw water to the District Vail Lake facilities for a cost of approximately

$6 million. Duties included oversight of inspection staff, review daily reports, manage materials testing consultant, review project submittals, RFl's, correspondence, change orders, and monthly progress payments. District Headquarters and Senga Doherty Pump Station Solar Power Project, RCWD, Temecula, CA Inspection supervisor for this installation of a 1.0 Mega Watt Photovoltaic (PV) system at Senga Doherty Booster Station and a 0.5 PV system at the District Headquarter facility. Duties included oversight of inspection staff, review daily reports, manage materials testing consultant, review project submittals, RFl's, correspondence, change or- ders, and monthly progress payments.

Tucalota Reservoir and Inlet/Outlet Pipeline, RCWD, Temecula, CA Project Inspector for the Reservoir and Pipeline. The reservoir is a 3.5 million gallon concrete pre-stressed (DYK Tank) which if fed through a 24-inch CML&C inlet outlet pipeline approximately 3,500 lineal feet including (1) bore Ruddell, Larry Jr.

MASTER NOV2016

and jack. Duties as an inspector were to ensure contractor compliance with plans and specs, coordinate material testing, and disinfection, and pavement.

Inspector, Promenade Mall Sewer Project, Rancho California Water District, Temecula, CA 1998-2000 Sr. Inspector for approx. 9,000 If of 8" SOR 35 sewer pipe for ring road and 2,000 If of 8" VCP. Duties include coor- dination with developer contractors, preparation of daily reports, photographic records, construction contract ad- ministration, contract compliance, and oversight of materials testing consultant.