B.Tech Civil Engineer with 4+ years of related experience in India & Gulf with a leading construction company in Hospitality construction, implementation of work control and has held responsible position in various technical activities of leading Construction Company. PROFESSIONAL EXPERIENCE
DUBAI :
Site Engineer (Facade ) July 2015 – Ti l l now
Projects I :
Project Name : Nikki Beach Hotels, resorts & Meeras Residences ( Pearl Jumeriah Dubai) Client : MEERAS
Consultant : DSA Architects & Consultants
The Nikki Beach Resort & Spa is constructed on total cost of 550 million dollars. The resort has 52,000 square meter resort and include 400 meters of white sandy beachfront, 61 branded residences, 132 units including 117 rooms and suites, 14 beach villas, one 1,350 sqm 3-bedroom ultimate villa, three restaurants, a VIP lounge, Projects II :
Project Name : Blue waters Hospitality ( Bluewater’s Island) Client : MEERAS
Project Management : MIRAGE
Consultant : ATKINS
Page 2
The Blue waters project is a man-made island that will essentially be a mixed use development located in Dubai. Blue waters will carry retail, residential, hospitality and entertainment zones . The project consists of a luxury hotel, a large family hotel and 2 serviced apartment buildings with a beach club and conference center as part of the hotel development raised at a cost of 1.6 Billion dollars. Roles :
Responsible for the construction of the all facades in this projects which includes all the glazing work, Aluminum cladding, Tile & stone cladding,EIFS(External Insulation Finishing System ) Resysta louvers & ceilings, Cement board ceilings & walls & Mechanical Louvers. Project is completely wrapped with insulation.
Details of Experience
Supervising project activities and handling the complete project management cycle entailing requirement gathering and final execution of the project.
Reviewing method of statements & risk assessments before proceeding up with an activity.
Raising Site Clarification Requests regarding various site related issues and getting approval for the same from the consultants to ensure works are not delayed at site.
Trouble shooting when problem occurs in the site. Through innovative ideas.
Deputation of Manpower.
Preparation of daily, weekly, monthly, reports on work progress & evaluating as per the planned schedules
Reviewing variations claimed by the sub-contractor.
Coordination with Sub contractors in response to the Site Instruction given by the consultant and coordinate meeting and working out a process to resolve the various inter-related issues.
Scrutinizing the consultant comments to establish the changes in the scope of works and raising the request for the issuing of the variation instruction if it is required
Co-ordination with sub-contractor in establishing installation sequences
Project inspections, snagging and handover and completion process. Site Engineer February 2015 – June 2015
ARM CONTRACTING W.L.L -BAHRAIN
Projects worked
Project Name : Euro Motors Land Rover Showroom, ( Sitra Bahrain Client : Euro Motors
Consultant : Gulf House Engineering
Euro Motors the exclusive dealer and distributor for luxury automotive manufacturer Jaguar Land Rover in Bahrain .The project constructed at a cost of 30 million dollars .It is first & biggest showroom for Landover in MENA Region.
Page 3
Details of experience in quantity surveying, finishing & documentation
Interface with Customer / Consultant, Subcontractors and Vendors, as required during the project execution period.
Subcontractor work progress monitoring.
Updating progress reports in Weekly and Monthly.
Analyze deviations or changes of scope in coordination with the Quality Surveyor, discuss and review with the Project Managers.
Liaise with the QC inspector to ensure that all inception and test activities are completed as required by the QC procedure / QC plan and prepared pertinent reports. INDIAN EXPEREINCE:
Jr Engineer September 2012 – November 2014
Company : RBK foundations Chennai,Tamil Nadu India Project Name: Thulasi nivas Anna nagar Chennai.
This project consists of G+3 floors with 6 flats on total . Each floor has 2 flats with large spacious living rooms consists of 2350sqft. The added advantage is attracting elevation. Roles :
Preparing Bar bending schedule for each slab
Arranging structural inspections
Allocating manpower
Checking sub-contractor bills
Setting out for block work
Setting out for tile flooring to get perfect finishing on the edges
Interiors finishing as per customers’ requirements
Final snagging & handover
I hereby declare that the information furnished above is true to the best of my knowledge and belief.
Place: DUBAI,UAE Yours Faithfully,
Date: (Rupesh Chandrasekhar)
Page 4
PORTFOLIO
Projects :
Present Project Name: Blue waters Hospitality Project, Blue water’s Island, Dubai, UAE Project client: MERAAS
Project Value: $1.6 billion
Highlight: World Tallest Ferris wheel, 210-Metre (689 ft.) Areas Handled : External completely.( Eifs, Stone cladding,Glazing, Acp claddings & copings,Woven screens & louvers )
Project II : Nikki Beach Hotels & Resorts
Project client : MERAAS
Project Value : 750 Million $
Areas Handled: External completely. (Eifs, Tile cladding, Glazing,Acp claddings & copings, Knauf ceilings & walls, Mechanical louvers.