PERSONAL RESUME
Name in full : ULKEN SARPHAN
Present position : MEP PROJECT MANAGER
Specialized : ELECTRO-MECHANICAL WORKS FOR INDUSTRIAL, POWER, CHEMICAL, PETRO-CHEMICAL, WATER TREATMENT PLANTS, HOUSING COMPLEX, HIGH RISE TOWER BUILDINGS, HOSPITALS & AVIATION.
( DESIGN, INSTALLATION AND PROJECT MANAGEMENT )
Profession : M. Sc. ELECTRICAL ENGINEER
Education : 1974 – THE TECHNICAL UNIVERSITY OF ISTANBUL FACULTY OF ELECTRICAL ENGINEERING, IST – TURKEY
Degree : MASTER OF SCIENCE ON ELECTRONICS & TELECOMMUNICATION 1974 – SAME UNIVERSITY
Foreign language : ENGLISH PROFESSIONAL
Nationality : TURKISH CYPRIOT
Religion : ISLAM
Marital status : MARIED WITH TWO CHILDREN
Membership : a) MEMBER OF ISTANBUL ELECTRICAL ENGINEERS CHAMBER b) MEMBER OF CYPRUS ELECTRICAL ENGINEERS CHAMBER
c) MEMBER OF INSTRUMENT SOCIETY OF AMERICA ( I S A ) – U.S.A Present address : Ethem Efendı Cad., Degerbılır Sok. No: 18/D.14 Erenkoy-Istanbul-Turkey.
Tel & Fax(Home) : 00-90-216-***-** 04
Mobile : 00-90-533-***-** 99
E – mail : ************@*****.***
Page : 1/ 3
WORK EXPERIENCE
EXPERIENCE COMPANY NAME POSITION & SUMMARY OF WORK DONE 2010-present MAU(Al-Mashariq, MEP PROJECT MANAGER
Azmeel&UTC ) Construction of Airport, SBQ & 5 Schools Package Projects. CONSORTIUM Fully responsible of Electro-Mechanical Works as Turn-Key basis. AL-KHAFJI/ KSA New build terminals, associated infrastructure and the full integration and commissioning of special airport systems. Works cover; Engineering Design, Site Installation, Sub-contractor Contracts and Final handover.
2006-2010 Bin Belaila BAYTUR ELEC. PROJECT MANAGER L.L.C-DUBAI-UAE. GOLD & SILVER TOWERS PROJECT-Jumeirah Lake Towers Proj. Managed Electrical Works as turn-key basis for the 40 stories two luxories High Rise Commercial Towers.
2004-2006 VİNSAN Veziroglu PROJECTS COORDINATOR
Group of Companies Executive management of the International projects inland and abroad
. Cankya-Ank. mainly in Golf Area.
2000-2003 ZORLU ENERGY PROJECT MANAGER
Ambarlı ISTANBUL Managed Cogeneration Power Plants as Turn Key basis, including Engineering design, site installation, Sub-contractor contracts and Final Handover.
1997-1999 ENERSIS PROJECT MANAGER
Energy Systems Inc. Managed all Electrical works activities for the project of T. IŞ BANK Levend –ISTANBUL HEADQUORTERS COMPLEX-Levend-Ist. as Turn Key basis. The project covers 3 Cleaver High Rise Tower blds. which one of them ıs the Highest bld.(52 st) in Turkey. Fully responsible of Elec.
( acc. to American Standards), Submittals approval, Site installation, Payment Certificates, Sub-contractor contracts, Test & Comm. and Final Handover under supervision of an American Consultant firm. 1994-1997 SAAD TRADING MEP PROJECT MANAGER
& CONTR. CO. Managed all Electrical & Mechanical Works activities as Turn Key AL-KHOBAR, basis for the following completed International Projects. SAUDI ARABIA a) SAAD MEDICAL CENTRE : Includes 210 beds Hospital with 15 Dental Clinics.
b) AL-SANEA COMPOUND : Includes 124 no. full furnished Luxury Villas with all facilities ( Recreation Center, Ice Scatting Bld., Swimming Pools, Tennis Courts ). Managed 386 Technical Staff under the projects.
1986-1994 M. BINLADIN MEP PROJECT MANAGER
CONTR. CO. Managed all Electrical & Mechanical Works activities for the project JEDDAH, of KING ABDULAZIZ UNIVERSITY-MEN’S MEDICAL CAMPUS SAUDI ARABIA This International Project covers 16 Faculty blds. on a 300000 sqm area with full furnished Medical Hospital (400 beds) & Clinics, Chiller Plant as Turn Key basis. Fully responsible of Engineering design acc. to America Standards, Submittal approvals, Procurement, Site, installation, Payment Certificates, Sub-contractor contracts, and Final Handover Under the consultancy of FLOUR DANIEL INT. CO.USA Managed 466 Technical staff under the project.
Page : 2/3
1982-1986 ENKA CONSTR. MEP SITE MANAGER
& INDUST.INC. Managed Electromechanical works installations for the project of KIRKUK-IRAQ IRAQ-TURKEY(Kirkük-Yumurtalık) PIPELINE 1&2 EXPANSION PROJECTS at Iraq side. Responsible of 3 different Sites for the Installation of Crude Oil Pipeline with 3 Remote Control Pumping Stations and fully Computerized Main Control Room. Managed 216 Technical staff under the sites.
1980-1982 ALSIM-ALARKO ENGINEERING MANAGER OF ELEC.&INST.DEPTS. IND&CONT.DIV. Responsible of Eng. Design for Refineries and Industrial Plants. ISTANBUL.
1977-1980 FOSTER WHEELER CHIEF DESIGN ENGINEER OF ELEC. DEPT. INT.USA-ISTANBUL Responsible of Electrical & Instrumention Engineering design for the project of AFSIN-ELBISTAN POWER PLANT-TURKEY
.
1974-1977 UNIVERSITY RESEARCH ENGINEER- DEPT.OF COMPUTER SCIENCE COLLAGE OF Design and Testing of Special Purpose Computer interfaces. LONDON-ENGLAND
Page: 3/ 3