CURRICULUM VITAE

Personal Information

Name : Mufid Wicaksono

Address : Jl. Dr. Semeru Gg. Kelor No. 34 Bogor 16111, West Java, Indonesia Place & Date of Birth : Tasikmalaya, 31 January 1983 ID Card No. : 327***********

Sex : Male

Weight / Height : 55 kg / 155 cm

Marital Status : Married, no child

Nationality : Indonesian

Mobile Phone No. : +628**********

Email : acywpl@r.postjobfree.com

Summary Experience

More than seven (7) years experience in Engineering Construction, Commissioning and Inspection expertise to oil & gas industry. One year experience in Testing Engineer on Daily Milk Industry. Experience working for both the client and contractor. Witness and performing testing. Routine instrument calibration checks (workshop & field). Produce document such as works procedure, pre-commissioning & commissioning check list, and testing paper.

Experienced in field instruments, testing and commissioning. Familiar with process control system and ESD system test. Assist package commissioning unit leader to prepare and execute commissioning activities follow up as per Client methodology.

Education

2005 – 2007 : Bachelor of Physic Instrumentation, Faculty of Science and Mathematics, University of Indonesia.

2001 – 2005 : Diploma of Industrial Instrumentation, Faculty of Science and Mathematics, University of Indonesia.

1999 – 2001 : SMUN 2 Bogor, West Java, Indonesia.

Mufid Wicaksono 2 of 4

Familiar with commissioning tool

- 375 & 475 Field communicator - Volt/mA calibrator - H2S and Methane test

- Drug pressure injector /hand pump - Insulation resistance meter - Multi meter

- Smoke detector tester - Heat detector tester - RS Logix 5000

- IR3 flame detector tester/ fire simulator - Temperature simulator Others

1. Familiar with MS Word package. 5. Safety Leader Training. 2. Familiar with Allen-Bradly package. 6. Hydrogen Sulfide ( H2S ) Level 2 Training. 3. Work Management System Level 7. Working at High Training. 4. Confined Space Training.

Professional Experience

1. November 2016 – December 2016 PT. Tracon Industri Electrical and Instrument Commissioning Engineer

Project Name : Commissioning Steam Turbin and Boiler. End User : PTPN V Palm Oil Factory – Pekanbaru, Riau, Indonesia. Job Description :

1. Monitoring process boiler and steam turbine.

2. Measure field instrument like rpm, temperature, pressure and flow out from boiler system. 3. Participate start-up Boiler 60 Tons/Hour (Advance BE Series) with Steam Turbine 1500kw and 2150kw

(Dresser Rand 703WB).

2. December 2015 – June 2016 Orion Indonesia Group Instrument Commissioning Engineer

Project Name : Banyu Urip EPC 1.

End User : Exxon Mobil Ltd.

Working under Tripatra-Samsung Consortium at Banyu Urip EPC 1 Mobil Cepu Ltd. Jobs description :

1. IO Test, Loop Test and Cause-effect test.

2. Actual Calibration all field device appropriate with design engineering. 3. The work area covering Gas Turbine Generator (Taurus 65 Series - Solar Turbine Package) with Heat Recovery Steam Generator (HRSG), Separator Area and Thermal Oxidizer. 4. Supporting for Start-Up activity with Exxon Mobil team. Mufid Wicaksono 3 of 4

3. Oktober 2014 – November 2015 Depriwangga Engineering Instrument and Control Engineer

Project Name : Upgrading Gas Turbin Compressor Project – SP Subang. End User : Pertamina EP.

Work for Pertamina EP Asset 3 on SF (Surface Facility) division. Jobs Description :

1. Provide technical input between Vendors - Pertamina EP in review document such as installation drawing, schematic diagram, P&ID, and loop test.

2. FAT, I/O Test, cause effect matrix test for supporting system start from separator area, fuel & seal gas system for gas engine generator package and air instrument package. 3. Commissioning and Start-Up for Gas Turbine Compressor (Centaur 50 Series - Solar Turbine Package). 4. June 2013 – June 2014 Urawa Rekayasa Mandiri

Electrical and Instrument Engineer

Project Name : Wayang Windu Geothermal Project.

End User : Star Energy Geothermal.

Jobs Description:

1. Supervision when construction.

2. Produce document such as activities with progress, MTO (Material Take Off), technical & specification report, works procedure, pre-commissioning & commissioning, and testing plant. 3. Coordination with material control and purchase dept. to monitoring arrival material on site to be match with work schedule.

4. IO test, loop check and re-calibration field device. 5. Commissioning and Star-up.

5. March 2013 – May 2013 Punj Lloyd Indonesia

Instrument Engineer

Project Name : Sumpal Expansion Project.

End User : ConocoPhillips.

Job Description :

1. Review technical document from vendor.

2. Make sure the equipment appropriate with end-users specification. 3. IO Test, Loop check, re-calibration field device and supporting on process and emergency system test and writing reports with documentation.

Mufid Wicaksono 4 of 4

6. April 2012 – Feb 2013 Indolakto

Automation Test Engineer

Job Description :

1. Identifying problems and shortcomings with existing systems. 2. Ensuring the safe testing and commissioning of completed installations to achieve the necessary plant performance in accordance with project programme requirements. 3. Integration test between other discipline such as boiler or Nitrogen system with process system. Project Achieved :

- UHT (Ultra High Temperature) Project - Cicurug 1 Plant.

- Upgrading and Automatic Filling Sachet SCM (Sweet Condensed Milk) Project - Cicurug 1 Plant.

- SCM (Sweeten Condensed Milk) and UHT (Ultra High Temperature) Project – New East Plant. 7. April 2008 – March 2012 Somit Karsa Trinergi

Automation and Instrument Engineer

Job Description :

1. Design automation and integration system.

2. Programming Programmable Logic Control for Shut down system, Safety Alarm System, Monitoring System and Fire and Gas System.

3. Troubleshoot and Modification service PLC System. 4. Testing and commissioning system.

Project Achieved :

- Upgrading Stacker and Reclaim System – Krakatau Steel, Cilegon, Indonesia.

(Engineering, Programming PLC Control Logix&Compact Logix with DC Drive and Commissioning).

- Replacement Control Panel – Camar Resource Canada Inc, Bawean, Indonesia.

(Engineering).

- Modification Compressor System – Northern Explorer, Biak Island, Papua, Indonesia.

(Modification on SLC-500).

- Instrument Air Dryer – Medco E&P, Palembang, Indonesia.

(Modification, Installation and Testing)

- Fire Detection System – Tunu 11S Total E&P, Kalimantan, Indonesia.

(Installation and Commissioning).