E-mail: *************@*****.***; ****************@*****.***; *********@*****.**.**
Tel: +234***-***-****; +234***-***-****; +234***-***-****.
PERSONAL DATA:
Date of Birth: 30TH, October, 1968.
State of Origin: Abia.
Local Govt. Area: Bende.
Marital Status: Married.
Nationality: Nigerian.
PROFFESSIONAL BODIES:
Member/Student of the Institute of Electrical Engineers London, (IEE). In View.
Ramat Polytechnic Maiduguri (RPM), Borno State.
Nana College Warri, Delta State. WAEC 1986,
Igbudu Primary School Warri Delta State. FSLC 1980.
QUALIFICATION;
Higher National Diploma HND, Electrical Engineering 1993.
OTHER TRAINING QUALIFICATION OBTAINED;
Basic Offshore Safety Induction Emergency Training Course. {BOSIET}.
Survival Swimming Certification with PFD and PPE.
Personal Survival Techniques.
Sea Survival Training Course.
Individual Responsibility for HSE/HES.
First Aid Training Course.
Manual Handling Course.
Fire Fighting Training Course.
Helicopter Underwater Escape Training and Aquatic Habitat Training Course. (HUET).
Safety Induction Training Course.
4Hrs Incident and Injury Free Orientation Training Course. (IIF)
EGTL Cultural Training Program.
Fire Prevention and Control Course.
OBJECTIVES;
Ready to face organisational challenges and work in accordance with other directives thereby increasing the level of their output effectively for the actualisation of organisational goals.
SKILLS/RESPONSIBILITIES;
Trouble shooting maintenance reliability test performance in the onshore, offshore and land rig locations.
Easy Adaptation to any working environment.
Strong initiation and ability to work with minimal supervision.
Computer Literate.
Security and safety Experience.
Result-Oriented and keen on working according to high performance standards.
Always try to meet up to Operational Excellence (OE), of the organisation.
Always ready to face new personal professional challenges.
Always put safety first for a good quality and efficient job results.
WORKING EXPERIENCE;
CLIENT: CONOIL (NIG) LTD/MSI AFRICA DEVELOPMENT LTD.
SUB-CONTRACTOR: ENIKKOM CONSTRUCTION LTD.
PROJECT: MSI/CONOIL HDD PROJECT PHASE 2, DRILLING OF PIPE STOPPER AT KULUAMA-2, BAYELSA STATE. 2010 Till Date
POSITION: RIG ELECTRICIAN.
JOB SCOPE
PROJECT ON;
Horizontal Directional Drilling, (HDD).
Drilling of 6’ pipe stopper.
Aungo Ajunite Julie Pipeline project
Installations of drilling equipments at the dredger control room and Trouble shooting on MPR-6000 mod vibrator unit.
Installation of communication systems, VHS, Motor Roller systems etc.
Installation of industrial electrical panels and industrial sockets and controls.
Preparation of all the electrical outlets ready for drilling projects.
Fabrication and construction of panel frames.
Installation and termination of generator one and two on changeover switch.
Installation of power packs A & B for the drilling rig and as well as drilling control cabin
Servicing of power pack A & B.
CLIENT: CHEVRON (NIGERIA) LTD.
SUB-CONTRACTOR: IDMON ENGINEERING & CONSTRUCTION (NIG) LTD. 2015.
PROJECT: EGP3B, MEREN-1PP/GGCP PROJECTS ESCRAVOS.
POSITION: INSTRUMENT TECHNICIAN. (WORK TEAM LEADER).
JOB SCOPE:
PROJECT ON;
Installation and hook-up of all EGP3B I & E devices.
Fabrication, Construction and laying of cable trays, ladders and supports etc.
Install LCP-220, FQI-220, PT-220 and PCV-220 A&B to the existing MR-1 PP Instrument air, ESD/TSE and MCP shutdown systems.
Installation and termination of navigation aid lights, explosive proof lighting features etc.
CLIENT: ADDAX-SINOPEC PETROLEUM (NIG) LTD/KAZTEC ENGINEERING CO. (NIG) LTD.
SUB-CONTRACTOR: OCTOPUS TECHNOLOGIES & SERVICES LTD. 2014 -2015.
PROJECT: ANTAN FIELD DEVELOPMENT PROJECT, SNAKE ISLAND, LAGOS STATE.
POSITION: ELECT./ INST. TECHNOLOGIST.
JOB SCOPE:
PROJECT ON;
Fabrication and construction of cable trays on the Antan main deck.
Cutting, setting and fitting of Oglaend FRP multi grid supports.
Fabrication of earth mat system for the earthing of the platform, etc.
CLIENT: ADDAX-SINOPEC PETROLEUM (NIG) LTD.
SUB-CONTRACTOR: KAZTEC ENGINEERING CO. (NIG) LTD/ T & A (NIG) LTD. 2014.
PEOJECT: EBPP, EBUGHU BOOSTERCOMPRESSOR INSTALLATION, BC-2.
POSITION: FIELD SERVICE TECHNICIAN.
JOB SCOPE:
Electrical and Instrumentations works.
Fabrication and laying of cable trays
Fabrication of supports and mounting of pole lighting fittings.
CLIENT: CHEVRON (NIGERIA) LIMITED.
SUB-CONTRACTOR: COMPACT MANIFOLD AND ENERGY SERVICES (NIG) LTD. (CMES)/ T & A (NIG) LTD. 2013- 2014.
PROJECT: EGP3B-ESCRAVOS GAS PROJECT-PHASE 3B.
DELTA PRODUCTION PLATFORM-(DPP), HOOK-UP MODIFICATIONS.
POSITION: FIELD SERVICE TECHNICIAN.
JOB SCOPE:
PROJECT ON:
Installation of flow computer FQI-220.
Fabrication of frame/Cable support for the stanchion pole lights.
Laying of cable trays to the flow computer FQI-220.
Re-location of stanchion mounted light fittings.
Routing of cable to the flow computer.
Installation and positioning of the flow transmitter FT-220 and pressure transmitter PT-220.
Fabrication and Installation of cable supports and tagging.
Re-location of stanchion lighting fittings,SL-012 and SL-040.
Cable Installation and termination of lighting junction Boxes.
Power source to stanchion lighting fittings at the Mcc switch room.
Installation of stanchion light at the main deck extension.
Installed and terminate flow transmitter FT-220/PT-220,at the new cellar deck extension.
Installed and terminate FQI-220 flow computer.
CLIENT: ADDAX-SINOPEC PETROLEUM (NIG) LTD.
SUB-CONTRACTOR: KAZTEC ENGINEERING CO. (NIG) LTD/ T & A (NIG) LTD. 2013.
PROJECT: PHASE 3 ADPP, ADANGA BOOSTER COMPRESSOR INSTALLATION, BC-1.
POSITION: ELECTRICAL FIELD SUPERVISOR.
JOB SCOPE:
PROJECT ON:
Installations of electrical solar marine navigation lights and connections.
Fabrication and Installations of cable trays.
Electrical lightings and mounting of pole lights.
Fabrication of pole lights base and supports.
Installation of junction boxes and wiring.
Installation of Ultrasonic flow meter and mounting panels.
Installation of tripod junction boxes and connections.
Cable glanding, Earthing systems and Terminations.
Pre-Commissioning checks and Commissioning.
CLIENT: CHEVRON NIGERIA LIMITED.
SUB-CONTRACTOR: COMPACT MANIFOLD AND ENERGY SERVICES (NIG) LTD. (CMES)/ T & A (NIG) LTD 2012-2013.
PROJECT: EGP3B-ESCRAVOS GAS PROJECT-PHASE 3B.
EWAN PRODUCTION PLATFORM HOOK-UP MODIFICATIONS;
POSITION: FIELD SERVICE TECHNICIAN. JOB SCOPE:
PROJECTS ON;
Mounting of cable trays at the cellar deck area.
Running of instrument cables from the mcc control room to the PT-pressure transmitter and the FT-flow transmitter FT-220 at the main deck.
Arrangement of terminal blocks.
Cable grounding at the pig launcher area.
Cable installation and termination at the limit switch zs-530.
Fabrication of cable support to flow computer FQI-220
Cable termination at master plc panel.
Running of power cable from the mcc control roomto the flow transmitter and pressure transmitter.
Running of instrument and power cables at the main deck.
Installation of two ways junction box.
Re-positioning and connection of platform communication system at the cellar deck.
CLIENT: CHEVRON NIGERIA LIMITED.
SUB-CONTRACTOR: SGC/TCM-SUKUNU HYDRA BASE CONCEPT (NIG) LTD. 2011- 2012.
PROJECT: EGTL-1, ESCRAVOS GAS TO LIQUID PROJECT, DELTA STATE.
POSITION: ELECTRICAL FIELD INSPECTOR.
JOB SCOPE:
PROJECTS ON;
Fabrication and Installations of Cable Trays and Cable Ladders.
Installations of Electrical Instrumentations.
Laying and dressing of Power cable and Instrument cables.
Installation of Cathodic panels, controls and terminations.
Pre-Commissioning and Commissioning of Process Boiler Plant, Package Boiler Plant and Steam Plant, etc.
Cable Glanding, Earth Grounding and Terminations.
Worked on Punch list Check-ups.
CLIENT: ADDAX PETROLEUM NIGERIA LIMITED.
SUB-CONTRACTOR: COMPACT MANIFOLD & ENERGY SERVICES (NIG) LTD. (CMES)/ T & A (NIG) LTD. 2011.
PROJECT: PHASE 2, PROJECT ON HOOK-UP SHORT DOWN AT ADDAX PETROLEUM PRODUCTION PLATFORM AT DEEP SEA WATER, CALABAR.
POSITION: ELECTRICAL FIELD SUPERVISOR.
JOB SCOPE:
INDUSTRIAL INSTALLATION.
Worked on Adanga Re-development ADPP, Phase 2 electrical work scope.
Termination of soft starters for Pax Pumps 210 and 220 Export Pumps.
Hook-Up and termination of cables to Pax Pumps 210 and 220 and Associated Controls.
Installation of gas alarm, pressurisation failure alarm for Mcc Control room, (including Installations of lights/Audible alarm plus panels).
Installation of new cables plus J.B’s for flare Ignition system and connections/
Pre- Commissioning checks on above systems.
CLIENT: CHEVRON NIGERIA LIMITED.
SUB-CONTRACTOR: BENTINI-JOLOMI NIGITRADE- JV (NIG) LTD. 2009-2010.
PROJECT: ESCRAVOS GAS TO LIQUID, (EGTL)/SOUTHERN GAS CONSTRUCTORS (SGC) LTD,
EGTL PROJECTS, DELTA STATE.
POSITION: CONTRACTOR.
JOB SCOPE:
MAINTENANCE REPAIRS.
Maintenance repairs on 750KVA caterpillar generator at the tank farm.
Routine check and repairs on the electrical accessories .
Check and repair the automatic Lincoln welding machines.
Check and replace bad circuit breakers on the extension electrical box.
Replace and fix up cable connectors on welding cables at the welding skilled.
Install safety emergency fire alarm system.
Repair and replace burnt control relays and rpm pick-up system at the 750KVA, caterpillar engine generator.
Replace bad speed sensor system on the 750KVA, caterpillar engine generator.
CLIENT: ADDAX PETROLEUM NIGERIA LIMITED.
SUB-CONTRACTOR: WEST AFRICA OIL SERVICES (NIG) LTD-(WAOS)/ T & A (NIG) LTD. 2008-2009.
PROJECT: PHASE 1, PROJECT ON HOOK-UP SHORT DOWN AT ADDAX PETROLEUM PRODUCTION PLAT FORM AT DEEP SEA WATER, CALABAR.
POSITION: ELECTRICAL SUPERVISOR.
JOB SCOPE:
INDUSTRIAL INSTALLATION.
Projects on ADPP-Phase1, On Adanga Production Platform on Re-Development Project.
Electrical Instrumentation on Adanga Production Platform, at Addax Field.
ADPP Electrical Up Grade-OML123,Integrated Field Development Project.
Installation of Control Panels and Modification of Electrical Equipments at the MCC Control Room.
Installation of Gas Detector Monitor and Ignition of fire flare Detector Panel.
Maintenance and Installation of Automatic Emergency Lights at the Adanga Production Platform.
Installation of Central Unit Pressurise A/c System, with Purge System Device.
BJ SERVICES COMPANY (NIG) LTD:- 2004-2008.
PROCESS AND PIPELINE SERVICES (PPS).
POSITION: ELECTRICAL SUPERVISOR.
JOB SCOPE:
INSTALLATION, MAINTENANCE AND REPAIRS.
Maintenance of Flow Meter on Pipelines.
Installations and Maintenance of Vacuum Pumps Unit and Dryers.
Installations and Maintenance of Heavy Duty Retro-jetting Pumps Units.
Expert on PIP 107,Fig80,Dead weight.
Maintenance and Vacuum drying of Pipeline at NLNG/TSKJ (NIG) Ltd, at Bonny Island.
Modifications and Distribution of Electrical Panels.
Industrial Installations of Mercury Vapour Sodium Lamps of Automatic security Lighting systems etc.
Specialist on Industrial Electrical Instrumentation Panels etc.
Vacuum drying of life Gas Pipe line at NLNG-DBN Train 3 & 4 Gas Tank Pipe line Projects, at Bonny Island.
WILLBROS OFFSHORE (NIG) LTD/ T & A (NIG) LTD. 2003-2004.
POSITION: GENERAL FOREMAN.
JOB SCOPE:
CONSTRUCTION AND MAINTENANCE.
Installation of Batching plant and Repairs.
Maintenance of Miller Welding Machines, Diesel Lincoln Welding Machines etc.
Erha and Addax Projects on Water and Gas Injection Manifolds, Walkways, Bridges etc.
Exxon Mobil Projects on Boat landing, Fire flairs Walkways Projects.
Marine and Industrial Modifications of Electrical Panel Units.
Maintenance of Anchor Winch Controls etc.
Repair of Radar Units Control at the Tidex Vessel.
Work on DB-318, Derrick Badge plat form at Soku Gas plant/Pipe line.
Work at Oso-Rig, Chevron Plat form.
GLOBESTAR-STOLT OFFSHORE ENG.CO.(NIG) LTD:- 1992-2003.
POSITION: ELECTRICAL FOREMAN.
JOB SCOPE:
FABRICATION, CONSTRUCTION AND INSTALLATIONS.
Equipments Plant Operator/Maintenance of all kinds of Cummins, Perkins, Caterpillar Engines Electrically such as D399, D696 Models of about-450KVA, 600KVA, 750KVA, 1000KVA etc.
Maintenance/Repairs of Lincoln Electric DC 400,600 and 1000 etc.
Maintenance/Repairs of Miller, Lincoln Diesel welding Machines.
Installation of Ideal-Arc Lincoln /Automatic Welding Machines.
Pile-Rack Specialist on Electrical Installation and Maintenance etc.
Equipment Operator in Analytic Stress Relieving (ASR) or Post Weld Heat Treatment-(PWHT), unit machine and also pre- heat sizes of pipes ranging from 10”-36” etc,in some major projects in most of the oil servicing companies, e.g. Mobil Inanga Wellhead Platform and Pipeline Projects, Oso Project, SPDC OGGS Project, Amenam Kpomo Project and finally Elf Amenam Projects.
Generator Installations both Domestic and Industrial Types etc.
HOBBIES: Table Tennis Player, Long Distance travelling, Swimming, Reading of Novels and Interpersonal Skills etc.
REFEREES:
* Chief T. Yusuf. * Engr. Kayode Gbenga.
MD/ CEO, Project Engineer.
T & A (Nig) Ltd, BJ Services Co.(Nig) Ltd,
Port Harcourt. PPS-Division, Phc.
Tel:-080*-***-****. Tel:-080*-***-****.