Post Job Free

Resume

Sign in

Machinist auto & motorcycle mechnic.airgunsmith painter locksmith

Location:
Vancouver, WA
Posted:
February 15, 2017

Contact this candidate

Resume:

Manuel Luis M. Javier

Home number: 360-***-****

**** ** **** *

Ave., Vancouver, WA, 98683

Email: acyt2r@r.postjobfree.com

Employment:

**** – 2015: Self Employed, Machine Shop Business, Dumaguete City, Phil. 2010 – 2015: Freelance Technical Consultant

SL Teves Inc., Dumaguete City, Phil.

1979 – Jan. 1980: Collins System International Inc. 1337 Pahlavi Ave., Vanak Circle at Kushyar St.

Tehran, Iran.

1977 – 1979: Emillar Construction Co., Ltd., Tehran, Iran 1974 – 1977: Philippine Aerospace Development Corp. National Aero Manufacturing Corp.

Rotor craft Philippines, Inc.

Manila Domestic Airport, Pasay City, Phil.

Employment Description:

1984 – 2015 : M achine Shop (Self Employed) Dumaguete City

• General Machining, fabrication of hard to find parts, fabrication of special tools to conform with customer's specifications

• Design and make high quality PCP (Precharge Pneumatic) and CO2 air rifles.

• Design and fabricate three piece triggers for air rifles.

• Air rifle tuning.

• CO2 bulk tank refilling.

2010 – 2015: T echnical Consultant, (Freelance) SL Teves Inc.

• Evaluate and recommend proper maintenance procedures, troubleshoot farm equipments:

Farm tractors, Pay loaders, Cargo

trucks

• Evaluate proper usage of lubricants, paints.

• Recommends alternative parts.

• Modification of parts that are not available.

• Procurement officer for purchasing ten wheeler surplus Japanese dump trucks, Japanese surplus engines, lathe machine, hard to find spare parts.

• Oversee inspection of engine compression, transmission, radiators, power take off. Differential and winch.

• Administer company vehicle registrations

1981 – 1984: A uto and Motor shop (self employed) Dumaguete City, Phil. Contract work on:

• Body repair: jeeps, cars

• painting jobs

• troubleshooting, tune ups, and other minor repair.

• Overhaul/modification of different brand of motor cycles.

• electrical wiring.

1978 – 1980: C ollins System International, Inc – Tehran, Iran.

• Installation of communication equipment for the Imperial Iranian Navy in various locations. Installation of the ff:

U HF, VHF, HF transmitters.

U HF, VHF, HF receivers. R F tubing

I nter-site cable layout, Power line layout and connection.

C limb 350 feet tower to troubleshoot rotatable antennae, other corrective measures.

I nstall communication system equipments at King PAHLAVI Palace. Asses proper tower and antennae installation with regards to safety.

• All work are carried out basing in technical drawing, diagrams, instructions, installation layouts, but not limited to alteration due to site situation arises.

• Auto mechanic for vehicles used in the project.

19 June 1977 – 11 Jan. 1978: E MILLAR Construction Inc. , Tehran Iran Electro mechanical technician.

• Install heating system and cooling system for trade school building, lavatories, windows, doors, emergency sprinkler piping,

• make cost estimate for contract painting jobs of industrial petroleum storage tanks, storage building, and commercial buildings.

• Teaches the local work force welding, pipe bending threading, hand drills, and basic hand tools.

• Interpret technical drawings to local workers (translating work procedures from Italian – English – Farsi)

• Submit work progress to primary contractor.

• Prepare billing report to primary contractor basing on man hours rendered and number of contract worker.

• Submit progress report to primary contractor project manager.

• Prepare payroll for our local contract workers.

• Act as safety officer for the entire contract.

1974 – 1977: R otorcraft Philippines, Inc. (Philippine aerospace Development Corp) Aircraft Mechanic I

BO-105 Helicopter Final Assembly

• Installation and assembly of main transmission gearbox, swash plates, drive shafts, pitch links, control rods, two stage hydraulic flight control system, oil cooler, oil cooler fan.

• Install twin Allison 250-C20 turbine engine, auxiliary tanks

• install and assembly of landing gear.

• Install intermediate gear box, tail rotor gear box, tail rotor drive shaft to tail boom.

• Install main rotor head and main rotor blades.

• Install and assemble minor component parts such as windshield instrument panels, communication system, UHF, VHF and other air craft parts.

• Cowl fitting and installation.

• Wiring and insulation test.

• Install rescue hoist assembly and wiring controls. - Installation of high security work.

• Installation of rocket launcher pads, sighting system

• perform sight adjustment in accordance with manufacturers test and procedures.

• Install radar system, wiring, and controls

Education:

Primary: C athedral School, Dumaguete City, Graduated: 1962 Intermediate: C athedral School, Dumaguete City, Graduated: 1964 High School: C athedral School, Dumaguete City, Graduated: 1968 College: C ebu Aeronautical Technical School, Lahug, Cebu City, 1971 – 1974



Contact this candidate