Post Job Free

Resume

Sign in

Electrical Quality Assurance

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Salary:
50000
Posted:
February 15, 2017

Contact this candidate

Resume:

Muhammad Yaseen

Objective: Having ability of seeking challenge and grooming new ideas can do Assigned mental work.

Personal Information:

Father’ Name: Muhammad Yousaf

N.I.C No. 35201-5099877-9

Date of Birth: 01-09-1984

Nationality Pakistani

Marital Status Married

Religion Islam

Residential Address:

Permanent:

H # P-76, Abid Shaheed Road near Police Choky

Ward # 13, Tandilanwala Distt. Faisalabad.

Phone # 033*-*******

032*-*******

E-Mail Address:-

acyt02@r.postjobfree.com

Ericsson Pakistan (PVT) Limited:

July 2013 March 2015

Worked with ERICSSON PAKISTAN (Pvt) LIMITED as Electrical Supervisor ON MOBILINK SAWAP . I am responsible for the following duties:-

Major Responsibilities;

Genset installation of Warid BTS sites Genset testing and commissioning

Troubleshooting of Genset

Commissioning and testing of ATS and AMF panels Installation of Earthing system

Installation of BTS Room Testing of Line Conditioner Testing of AVR

Commissioning ant testing of Air conditioning system Testing and checking of external Alarm

Supervision of Air craft Light Electrical and Earthing Works.

Supervision of Gen set installation & delivery

Commissioning of Fire panel

HVAC system and fire fighting system including FM 200 systems.

Commissioning and testing of ATS and AMF panels Working at MSC/BTS sites

Installation commissioning and testing of POWER ZONE Gen set and Air-conditioning system

To check and control the quality and workmanship of Electrical and Mechanical works according to approved electrical drawings, technical specifications/codes, quality assurance manuals and method statements/work procedures.

Liaising with consultants/customer and/or sub-contractors engaged in the project. Monitor rectification and expansion works on previously build sites.

RFI done an agreed program of deadlines. As Built electrical & Earthing drawings

PAT done without OIL FAT done without OIL

Working with the Client (MOBILINK SAWAP) for preparation of Acceptance procedure of Cell Sites and preparation of Progress Monitoring Performa’s.

Professional Experience:

Engineering design Bureau

Jan 2009 to Jun 2013

Working with Engineering Design Bureau as Site Engineer (Civil & Electrical) on different projects. I am responsible for the following duties:-

Site survey (Civil & Electrical) of difference MSC,s BSCs & BTS sites Review civil, electrical design & supervision of electrical works at sites Commissioning and testing of ATS and AMF panels

Troubleshooting of Genset, ATS,AMF & main panels in MSCs, BSCs & BTS sites

Supervision of Gen set installation, HVAC, electrical wiring, all types of panels Supervision of Solar Panels installation of ZONG, WARID, & Telenor

Genset testing and commissioning

Commissioning and testing of ATS and AMF panels Installation of Earthing system

Installation of BTS Room Testing of Line Conditioner Testing of AVR

Commissioning ant testing of Air conditioning system Testing and checking of external Alarm

Supervision of Air craft Light Electrical and Earthing Works.

Supervision of Gen set installation & delivery

Commissioning of Fire panel

HVAC system and firefighting system including FM 200 systems.

Commissioning and testing of ATS and AMF panels Working at MSC/BTS sites

Installation commissioning and testing of PERKINS Gen set and Air-conditioning system

To check and control the quality and workmanship of Electrical and Mechanical works according to approved electrical drawings, technical specifications/codes, quality assurance manuals and method statements/work procedures.

Liaising with consultants/customer and/or sub-contractors engaged in the project. Monitor rectification and expansion works on previously build sites

Ericsson Pakistan (PVT) Limited:

Nov 2007 to Dec 2008

Worked with ERICSSON PAKISTAN (Pvt) LIMITED as Electrical Supervisor ON WARID TELECOM FOR PHASE-6.1 & 6.2. I am responsible for the following duties:-

Major Responsibilities;

Genset installation of Warid BTS sites Genset testing and commissioning

Troubleshooting of Genset

Commissioning and testing of ATS and AMF panels Installation of Earthing system

Installation of BTS Room Testing of Line Conditioner Testing of AVR

Commissioning ant testing of Air conditioning system Testing and checking of external Alarm

Supervision of Air craft Light Electrical and Earthing Works.

Supervision of Gen set installation & delivery

Commissioning of Fire panel

HVAC system and fire fighting system including FM 200 systems.

Commissioning and testing of ATS and AMF panels Working at MSC/BTS sites

Installation commissioning and testing of PERKINS Gen set and Air-conditioning system

To check and control the quality and workmanship of Electrical and Mechanical works according to approved electrical drawings, technical specifications/codes, quality assurance manuals and method statements/work procedures.

Liaising with consultants/customer and/or sub-contractors engaged in the project. Monitor rectification and expansion works on previously build sites.

RFI done an agreed program of deadlines. As Built electrical & Earthing drawings

PAT done without OIL FAT done without OIL

Working with the Client (M/S WARID TELECOM) for preparation of Acceptance procedure of Cell Sites and preparation of Progress Monitoring Performa’s.

Fire Tech (PVT) Limited:

December 05, 2005 to November 2007

Working with Fire Tech (Pvt) LIMITED as Electrical Supervisor ON WARID TELECOM FOR PHASE-2, 4 & 5. I am responsible for the following duties:-

Major Responsibilities;

Genset installation of Warid BTS sites Genset testing and commissioning

Troubleshooting of Genset

Commissioning and testing of ATS and AMF panels Installation of Earthing system

Installation of BTS Room Testing of Line Conditioner Testing of AVR

Commissioning ant testing of Air conditioning system

Installation on fire alaram system (BTS Sites, MSC, PTCL Buildings) Testing and checking of external Alarm

Electrical and Earthing Works.

Installation of battery banks in PTCL Buildings Supervision of Gen set installation & delivery

Commissioning of Fire panel

HVAC system and fire fighting system including FM 200 systems.

Commissioning and testing of ATS and AMF panels Working at MSC/BTS sites

Installation commissioning and testing of PERKINS Gen set and Air-conditioning system

To check and control the quality and workmanship of Electrical and Mechanical works according to approved electrical drawings, technical specifications/codes, quality assurance manuals and method statements/work procedures.

As Built electrical & Earthing drawings

Education:

Matric

Board of Intermediate and Secondary Education Faisalabad.

Diploma of Associates Engineer

In Electrical Engineering from Punjab Board of technical

Education Lahore.

Computer Skills:

Data Entry Operator

Launched by Government of Pakistan, Ministry of Science & Information

technology & Telecommunication Division, Islamabad.

Languages:Fluent in English & Urdu



Contact this candidate