SAJID MAHMOOD
PROFESSIONAL CARRIER OBJECTIVES
House#173/75 AwamiColony Bahawal Pur
Ph No-033*-*******
************.**@*****.***
Career development in the field based on strenuous efforts and true
organizational satisfaction by serving any National or Multinational
Organization Keeping organization interest paramount and striving for
achievement of its long term Objectives. .I can employ my capabilities and
skills to improve and learn future in very short time. Get affiliated with
knowledge seeking organization to use my skills and Innovation to
contribute for new advancement and gain to develop further skills essential
for career growth.
GENERAL INFORMATION:
Name Sajid Mahmood
Father's Name Khalid Mahmood
Religion Islam
Nationality Pakistani
Domicile Bahawal Pur (Punjab)
Marital Status Single
Date of Birth 03.01.1993
NIC # 31202-4898093-3
ACADEMIC QUALIFICATION
DIPLOMA Diploma of Associate Engineer (Civil)
Matriculation Board of Intermediate & Secondary Education
Bahawalpur
COMPUTER KNOWLEDGE:
Word Processing Microsoft
Word
Worksheets
Microsoft Excel
Skill
Auto CAD
Total EXPERINCE
Having 6 Years of experience
EMPLOYMENT HISTORY
Organization: BAK CONSULTING ENGINEERS (BAK)
Position: QUANTITY SURVEYOR (Q.S)
Location: 108 MW Golen Gol Hydropower Project
Chitral
Duration: Jun 17, 2016 to Till Date.
Description of Duties: I am dealing complete project which is divided
in five Lots (2, 3.1, 3.2, 4.1, 4.2). My
responsibilities are: Checking of IPC's, Escalation,
Rate analysis, VO, Extension of time (EOT).
Including Hydraulic structures, tunnel, road,
bridges, Powerhouse, grid station, Switchyard,
transmission line (132 & 220 kV), electrical and
mechanical work. Project is funded by three donors
OPEF Fund for International Development (OFID) Saudi
Fund Development (SFD) & Kuwait Fund Development (
KFD . The scheme designed for the generation of 108
MW consisting of three units in one phase trough
Pelton Turbines.
EMPLOYMENT HISTORY
Organization: HABIB RAFIQUE PRIVATE LIMITED (HRL)
Position: "QUANTITY SURVEYOR (Q.S)
Location: 2 x 660MW Coal Fired Power Plant
Sahiwal
Duration: Aug 24, 2015 to Jun 15, 2016
Description of Duties: Preparation of Interim Payment Certificate (
IPC) for the complete residency, offices for Chines
and Pakistani staff i/c roads and other work.
Switchyard, mechanical store room, and also
calculate the some Quantity for Cooling tower,
access road, turbine foundation and mega frame
structure. Prepare Bar Bending Schedules (BBS).
Calculate the Quantity of mechanical and electrical
work. . Monthly progress report submitted to the
Owner Company. There was three chines company like
Sepco1, Hinan and TEPC. The owner Huaneng Shandong
Ruyi (Pakistan) Energy (pvt) limited.
EMPLOYMENT HISTORY:
Organization: ABDUL KARIM AND SONS. (AKS)
Position: "QUANTITY SURVEYOR (Q.S)
Location: "JHAMPIR WIND POWER PROJECT PAKISTAN
(HEI)
Duration: Dec 24, 2014 to Aug 20, 2015
Description of Duties: Preparation of Interim Payment Certificate (IPC)
for Residence area (only for chines), inside
residency roads and also calculate the outside all
roads. and Batching Plant. Prepare Bar Bending
Schedules etc. Monthly progress
report submitted to the harbin electric international
( HEI)
EMPLOYMENT HISTORY:
Organization: GHULAM RASOOL & COMPANY (GRC)
Position: "QUANTITY SURVEYOR (Q.S)"
Location: Kachhi Canal Project (KC-05) Section
"B" Rujhan
Duration: Aug 20, 2014 to Dec 21, 2014
Description of Duties: Preparation of IPA's for Bridges, super passage
structures Type 1&3 with canal lining both side &
bed between this RD (666+100
~714+000) Rate Analysis, Variation orders (VO)
Prepare Bar Bending Schedules. Cross section and
also prepared Monthly progress report submitted to
the national engineering services Pakistan
(NESPAK) and water and power development authority
(WAPDA) too.
EMPLOYMENT HISTORY:
Organization: MYCO Engineer
Position: "QUANTITY SURVEYOR" (Q.S)
Location: Polish Oil & Gas Company (POGC)
EWT Rehman-1 and Halil well
Location DADU (Sindh) Pakistan.
Duration: Dec 25, 2012 to July 28, 2014.
Description This facility is handling 15 MMscfd of
Raw Gas, about 10 BPD of condensate and 200 BPD of
produced water on EPCC basis according to
specifications of Sui Southern Gas Company Limited
(SSGCL). MYCO
Engineers was Sub-Contractor with PSS Asia. I was
responsible for preparation of IPC, rate analysis,
shop drawings, B.B.S and weakly & monthly work
schedules. Calculate the Quantities like as pad
strip foundations, evaporation pond, condensate
storage, firefighting system, gathering manifold,
metering skid, air compressors, inlet and discharge
piping, cutting & Filling of plot areas, brick work
Infrastructure included MEP work. Project completed
under the short term.
EMPLOYMENT HISTORY:
Organization: SHAH Construction Company (SCC)
Position: "Asst QUANTITY SURVEYOR" Location:
(MES) Road Bahawal Pur
Duration: Aug 21, 2012 to Dec 16, 2012.
Description of Duties: Prepared IPA, bar bending Schedule, rate
analysis and also checked the
PC bills.
MY ATTRIBUTION
The preparation of Bills and/or Schedules of Quantities of materials,
labor and services required in the construction and equipment of
building, or engineering works.
. Survey work.
. Water Bound Macadam (WBM)
. Asphaltic Base Course and wearing course.
. Triple Surface Treatment (TST)
. Inspection of concrete works.
. Preparing the IPC, Escalation, VOs and bar bending schedules