Paul J. Selman, P.E., MBA

***** **** ******

Oak Forest, IL 60452

708-***-****

***********@*******.***

Thybar Corporation – Addison IL (April 2006 – Present)

Professional Engineering Department Head – Registered PE in all 50 states

Manage, organize and coordinate multiple projects simultaneously in a manufacturing environment.

Prepare, publish and communicate project status through Requests For Information (RFI), Engineering Change Notice (ECN) and project team schedule reviews.

Review design and manufacture of products to ensure compliance with seismic and wind load requirements of the International Building Code and Minimum Design Loads for Buildings and Other Structures (IBC and ASCE7).

Design and analyze a variety of non-structural equipment including liquid storage tanks, utility scale solar power plants and louvers.

Interface with departments for customer care, invoicing, sales, marketing and drafting.

Provided technical analysis that helped established products become more profitable.

Teng & Associates - Chicago, IL (February 2005 – April 2006)

Project Manager

Oversee general contractor’s compliance with construction documents and interact with the client directly to ensure the success of multi-million dollar telecommunication construction projects.

Design Heating, Ventilation and Air Conditioning (HVAC) systems for telecommunications facilities including central station boiler replacement/upgrades, chiller system installation and large air handlers.

Tetra Tech EMI - Chicago, IL (March 2004 – February 2005)

Project Manager

Work with the City of Chicago Department of Buildings and Department of Construction and Permits (DCAP) to implement the Chicago Energy Conservation Code.

oDeveloped and implemented training program for building inspectors and permit reviewers.

oResponded in a technically accurate and timely manner to questions posted to CityOfChicago.org regarding code applicability.

oPrepared invoices and communicated financial project status to Program Manager.

Performed Property Condition Assessment (PCA) on apartment complexes to evaluate code compliance and estimate renovation costs.

oConducted walk-through surveys to identify a property’s material physical deficiencies.

oUsed historic financial data and current industry trends to prepare opinions of probable costs to remedy physical deficiencies.

oPrepared Property Condition Report (PCR) to outline the observations, opinions as to the property condition, and opinions of probable costs to remedy any material physical deficiencies observed.

o

Sargent & Lundy LLC - Chicago, IL (March 2001 – March 2004)

Associate (Mechanical Engineer)

Wrote specifications and prepared technical evaluations of vendor submittals to ensure that power plant components were in compliance with client needs and industry standards.

Utilized tools and methods such as MICROSTATION CAD, ORACLE Database Management, ASME Power Piping Calculations, Thermodynamics, Fluids and Heat Transfer.

Procurement of multi-million dollar machinery to support the construction and design of cogeneration, combined cycle and coal fired electric power plants.

Parsons Transportation Group - Chicago, IL (September 1998 – March 2001)

Project Engineer

Mechanical design engineer for the successfully completed $30 Million renovation of 17 CTA train stations.

Specified, reviewed and supervised the installation of HVAC systems, hydronic heating and ventilation equipment.

Scientific Atlanta - Norcross, GA (April 1998 – September 1998)

Manufacturing Engineer

Developed and refined methods of manufacturing electronic products in a medium volume production environment.

Georgia Institute of Technology - Atlanta, GA (February 1996 – March 1998)

Research Assistant

Utilized computers and research materials, including data acquisition hardware and software, for analysis and visualization of complex datasets based on stress and temperature data taken during the manufacture and testing of electronic components.

United States Navy - Various Locations (November 1987 – November 1993)

Petty Officer First Class

Primary responsibilities included scheduling and performing preventative and corrective maintenance on shipboard gas turbine propulsion and power generation systems.

Supervised 11 people as Work Center Supervisor and reported directly to the Chief Engineer.

Honorably discharged after advancing to rank of Petty Officer First Class with Surface Warfare (SW) designation in six years of active duty service.

Education

MBA – Lake Forest Graduate School of Business – Chicago, IL (June 2002)

BSME – Georgia Institute of Technology – Atlanta, GA (March 1998)

Professional Associations/Certifications

Licensed Professional Engineer (PE) in 50 states.

American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) - Technical Committee 2.7 Secretary 2016

Vibration Isolation and Seismic Control Manufacturers Association (VISCMA) - Secretary/Treasurer 2017