Bablu Kumar Mahato
At-Palani, P.o.-Palani
Distt-Dhanbad, PS-Baliapur, Jharkhand, 828201
Contact: +91-985******* E-mail: **.********@*****.***
Objective
Seeking a position to utilize my skills and abilities in the telecom Industry,. I look forward for a working environment that provides opportunity to enhance my skills and make significant contribution to the Industry.”
Presently working on Aircel BSS FLM ENGINEER (KALIMPONG) THRUGH ADECCO,
11-11-2015 to Till Date.
Professional Skills
6.0 Year experience in GSM BTS Engineer, Additional experience of Commissioning and Integration of NOKIA (Ultra Edge and Flexi Edge) BTS & FHY IDU.
PTID CERTIFIED IN NSN
NSN CERTIFIED in 2G & 3G, PTID NO-AIRON/T/TL4/048037
Company: Nokia Siemens Network through Spectrum infratech Ltd from March-2013 to June..2013
Designation: BSS Engineer
Location: MOTIHARI (BIHAR) & July 2013 to 31 Sept 2013 in Dhanbad Jharkhand.
Indus Towers Ltd. Through IKYA.
JAN-2015 TO MAY-2015 NSN FLM ENGINEER IN AICEL PROJECT JALPAIGURI (SILIGURI). AS A BSS ENGINEER
30 JUNE2016 TO 30 OCT 2016 NSN (VODAFONE OPERATOR) AS A BSS ENGINEER (W.B) AS A BSS ENGINEER
Carrying out maintenance and operation of Nokia Ultra, Flexi, MR,BTS .
Fault Management, Configuration Management, Performance Management and Alarm Monitoring:
BTS Have an extensive knowledge in alarm handling,, TRX Creation and EDAP Extension
2nd Level troubleshooting for critical alarms, taking generic system backup of BSC e
RF Parameters implementation as per the requirement..
Accountable for scanning of 16 BSC under Cluster Associated with installation and commissioning of Flexi Audio, M/W Antenna
Concerned with maintenances of Battery Bank and Power Plant
Involvement in complete planning to close the spur sites into ring to bring every site into ring
Concerned with E 1 adding, dropping as per requirement on Transport equipments
Responsible for resolving E1 capacity constraints with the help of planning team
Involvement in Call testing, TRX Loop testing & Alarm Termination, Trx power Measurement
Associated with fault rectification & troubleshooting of BTS, MW link, PDH and SDH
Relinquishing PDH and SDH Site after Performing Site Acceptance test
Concerned with FIU NMS Visibility, PM of SITE, FHY JOJY
Carrying out the Activity in BSC with Support
Involvement in Call testing, TRX Loop testing & Alarm Termination, Trx power Measurement
Associated with fault rectification & troubleshooting of BTS, MW link, PDH and SDH
Relinquishing PDH and SDH Site after Performing Site Acceptance test
FHY idu comm. Alarm rectification.
Carried out Installation, Commissioning & Integration of Ultra & Metro sites BTS
Accountable for the maintenance of Nokia BTS, M/W & power instrument, preventive Maintenance of Nokia site
Involved in the implementation of M/W links (FXC-RRI, FIU-19, and FXC E1-T1) for connectivity of B
Previous Employee
Airon Switch’s P.v.t. Ltd. As a Project Engineer in Bihar From 10th Oct 2008 to Feb 2013.
Leading a team of Indoor & outdoor installation works
Makeover of site.
Completely responsible for all indoor and outdoor activities under Nokia (Ultra & Flexi Edge) BTS sites as per quality standards..
Indoor and Outdoor Nokia (Ultra and Flexi Edge) BTS installation as per Quality Standards.
Completely Hand on Experience on Nokia (Ultra & Flexi Edge) BTS.
I am responsible to make all type of connectors, proper routing of jumpers, feeders, cable trays etc.
Installation of BTS, Power Plants, Battery Banks and all indoor & outdoor accessories.
Commissioning and Integration of Nokia (Ultra Edge and Flexi Edge) BTS.
VSWR measurement.
Performing AT of sites.
Responsible for the commissioning & integration of new Nokia (Ultra &Flexi Edge) BTS sites.
Interacting the Customer regarding various quality issues for the existing network.
Responsible for TRX expansion and BTS re-configuration.
Responsible for bringing new sites on air and responsible for acceptances tests of new cell sites, testing calls, handovers and verifying all external alarms reporting to the OMC
Responsible for all Technical issues/fault diagnosis at BTS sites.
VSWR measurement using site Master
Monitoring the Quality Control during the installation time
Supervision of installation team. Segmentation, cabex, swapping & TRx addition
BSC alarm monitoring...
NODE_ B Sites Installations And Commissioning
Trx addition deletation..
Responsible for the commissioning & integration of new Nokia (Ultra &Flexi Edge) BTS sites.
Interacting the Customer regarding various quality issues for the existing network.
Responsible for TRX expansion and BTS re-configuration.
Responsible for bringing new sites on air and responsible for acceptances tests of new cell sites.
Responsible for all Technical issues/fault diagnosis at BTS sites.
VSWR measurement using site Master
Monitoring the Quality Control during the installation time.
Supervision of installation team. Segmentation, Cabex, swapping & TRx addition (Nokia Ultra &Flexi Edge BTS sites)
NODE_ B Sites Installations and Commissioning
NODE_ B (3G) commissioning.
Installation of Classical Node (FSMD with FRGP).
Installation of Classical Node_B (FSMC with FRGP)
Installation of Distributed Indoor (FSIA with FRGP)
Installation of Distributed Outdoor (FSMC with FRGP)
E1 patching for NOD_B
Making E1 cable for NOD_B
Installation of Transmission card (FTFB, FTIB).
MR BTS Coom & Installation.
FHY IDU COM & Installation
RTN
FPH
MR-10 BTS
Education
Diploma(C.A.E) Mining Institute Koderma 2007 75.00 %
Class X High School Baliapur 2002 59.82 %
Computer Skill
Operating System Windows XP/2000
Programming Languages C programming.
Applications/Packages MS-Office, Ms Excel.
Web Concepts HTML.
Interests
Painting, Listening music
Personal Information
Date of Birth : 21,th Oct 1987
Marital status : Unmarried
Nationality : Indian
Languages Known : Hindi, English
Declaration
I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above particular mentioned.
Place: KALIMPONG (DARJILING)
Date: 12-DEC- 2016 (Bablu Kumar Mahato)
ROB(WB)