RESUME

C.JEGATHESH E-mail: acym5x@r.postjobfree.com

BE (Electrical & Electronics Engg.) Phone No: +968-********

: 914***-******(India)

Career Profile:

Having 15+ years of Industrial Experience in Oil& Gas related Project, Strong Supervisory, co-ordination, monitoring & overseeing the daily execution of construction activities, seeking for role in Project Management & Development. Academic Chronicle:

B.E in Electrical and Electronics Engineering from Noorul Islam College of Engineering, Kanyakumari (Dist) under Manonmaniam Sundaranar University, Thirunelveli in the year 2001

Undergone 26 Weeks course on “Operation and Maintenance of Transmission and Distribution Systems” from National Power Training Institute/Power Systems Training Institute, Under the Ministry of Power, Government of India, Bangalore, Karnataka.

Other Qualifications:

Certificate in Industrial Wiring & Re-winding of Motor, Transformer from Government Polytechnic, Nagercoil.

Certificate in Computer Maintenance from Hard-Net, Nagercoil Summary of Skills:

Over 15+Yrs. Experience in the field of Electrical engineer, Which also include 10 Years in Oil & Gas company, Career highlights Includes

Worked as Electrical Project Group Leader,

Preparation of project schedule, reviews engineering plans and specifications

Prepare projects material submittals, method statements and documents to get approval from main contractor, consultant and Client

Well conversant with Industry codes, Hazardous area classification and selection of electrical equipment’s accordingly.

Maintained effective working relationship with contractors, consultants, client, vendors, outside agencies and other staffs

Prepare coordination drawing as per site condition Provide engineering solutions for relocation, upgrades, modifications, and new acquisitions of Electrical infrastructure needed to support construction projects.

Erection/Maintenance of Electrical Equipments like Transformers, Circuit Breakers, LT/HT Switchgear, HV Capacitors, Cable & Capable of trouble shooting of Electrical Equipment.

Installation & Maintenance of HV & LV switch gears ranging from 132kv, 33KV & 11KV ACB's, VCB's & GIS,

Erection, Operation & Maintenance of 132 kV Grid Substation & Transmission Lines and all Allied Electrical Equipment for Substations and Transmission Lines

Installation & Maintenance of 440V motor control centers comprising of MCCB, Power contactor, control relay, thermal overload relay, earth leakage relay, motor protection relay and push button station with ammeter.

Installation-, & Maintenance of Motors (of various voltages) ranging from fractional horse power to 5 MW used in hazardous Location.

Installation & Maintenance of UPS systems up to 120KVA and Battery chargers up to 125 Amps with battery backup GUTOR / AEG .

Cathodic Protection (CP) system, Solar Power Systems, Hazardous Area Classification Layouts, Selection of equipment for hazardous areas.

Prepare BOQ and to procure material as per site condition and coordinate with supplier.

Maintained effective working relationship with contractors, consultants, client, vendors, outside agencies and other staffs

Prepare co ordination drawing as per site condition Provide engineering solutions for relocation, upgrades, modifications, and new acquisitions of Electrical infrastructure needed to support construction projects.

Trained at Despatcher Training Simulator Lab in NPTI, Bangalore.

Trained at Hot Line Training Centre NPTI, Bangalore.

Trained in Relay Testing at NPTI, Bangalore.

Hands on experience in Mi-Power software package for Load Flow Studies, Short Circuit and Transient Analysis, System Planning.

Software skills: Languages like Fortran, C, C++ and operating system like WindowsXP/98,MS-office:Ms-word,Ms-powerpoint,Ms-Excel, Ms-Word Safety skills:

Job Hazardous Analysis Training – National Training Institute, Nimr.

H2S Awareness Training - National Training Institute, Nimr, Oman.

Permit to Work System- signatory- National Training Institute, Fahud, Oman.

HSE Tools & Skills-HSE Occupational Training Institute.

SL for Managers- HSE Occupational Training Institute.

IFR- HSE Occupational Training Institute.

CMC-HSE Occupational Training institute.

Authorization In PDO :

Competent Electrical Person ( CEP)

PTW signatory

Experience Details:

Sl.No Designation Name of Organization Project Handled Period of Employment From To

1 Lead- Engineer

Electrical

Al-Hassan Engineering

Co S.A.O.G Oman

Ghaba North Re-

Development Project

PDO Oman

10/7/2014 Till date

2 Lead- Engineer

Electrical

Al-Hassan Engineering

Co S.A.O.G Oman

Export Pipe Line Project

Oman Oil Company

Exploration & Production

7/12/2012 10/62014

3 Lead -Engineer

Electrical

Al-Hassan Engineering

Co S.A.O.G Oman

Saih Nihayda Depletion

Compression Phase-1

PDO Oman

5/6/2010 5/12/2012

4 Senior-Electrical

Engineer

Al-Hassan Engineering

Co S.A.O.G Oman

Nimr-C Full Field Water

Injection Project

PDO Oman

20/5/08 18/4/10

5 Electrical

Engineer

Al-Hassan Engineering

Co S.A.O.G Oman

Mukhizna Power Plant

Project PDO Oman

18/4/06 15/5/08

6 Electrical

Engineer

NEPC Wind farm,

Coimbatore

8/7/04 20/3/06

7 Assistant

Engineer

Lekshmi Electricals,

Nagercoil, Tamil nadu

5/7/02 2/7/04

8 Junior Engineer Smiles Engineers,

Nagercoil, Tamilnadu

1/12/01 03/6/02

Job Profile & project handled:

1, July 2014 to Till Date:

As a Lead Engineer Electrical for Ghaba North Redevelopment Project Contract No C311281

Responsible for Construction & commissioning of New 33kv GIS station with Two

(Incomer) one Bus coupler & seven outgoing Feeder, Incomer for GIS is Via Loop – in –Loop arrangement of 33kv OHL Line from existing Stations. Sub- Station scope includes as

8/10MVA, 33/6.9kv Transformer ( 2 No’s) with ONAN/ONAF and OCTC includes Installation commissioning assistance, to feed Power supply requirement for Gas Lift /injection compressors & Export Pumps

2MVA, 6.6/0.433KV Auxiliary transformer Installation

33kv,15MV Air detuned capacitor Bank Installation

6.6kv Switch Gear with 2 Incomer, 1 Bus section & out Going feeders

6.6kv Neutral Earthing resistor

36 LV Variable Speed Drive system

415V LV switch Board with 2 Incomer, bus section Including Out Going feeders

415v AC UPS, 240V AC UPS & 110V DC UPS Installation & commissioning under Vendor assistance

Field & Off – Plot facilities scope

Fuel Gas Heater control Panel

Electrical Heat Tracing work

Thyristor control panel for Nitrogen package

33kv OHL construction with Loop In Loop arrangement for Power Interconnection with existing Station.

Lighting & Small Power DB’s, Area lighting DB

Complete HV,LV, control, Protection & signal cables for the project including Laying & Termination activities supervision

outdoor Sockets, RCU for motors, junction boxes, cable Glands required for the entire Power distribution system

Plant area Lighting, Emergency Lighting,escape route lighting & small Power

Complete Earthing & Bonding, Lightning System

Installation of Cathodic Protection for 3 No’s re-routed Pipe Line, Flow line, Storage Tank & drain vessel

Gas Injection Wells ( 4 No’s) Power up by Adjacent OHL Tap Off & feeder Pillar arrangement

OP wells ( 18 No’s) electrical activities Including Solar Panel Installation 2, Dec 2012 to Jul 2014

As a Lead Engineer Electrical for EXPORT PIPE LINE PROJECT: OOCEP Contract No AB/2012-027

Responsible for Construction & commissioning of New 33KV OHL in Concrete pole app ( 6km length) at Barik Area,Testing & commissioning of 1N0’s of Nulec Make PMR, Installation & alignment of GEVEA Make 33kV Disconnector.

Construction Phase of 33kv OHL Includes Conductor Stringing Under Existing 3 No’s PDO 132kV OHL Line & Completed Successfully within the Stipulated time Period.

Fiscal Metering Station Includes 200KVA Transformer, 220KVA DG Set, PDO Metering Panel,415V PDB,240V UPS System, HVAC System. Installation & Commissioned successfully

Block Valve Station -1 & 2 Includes Passive Cooler Shelter & Solar array.

FOC – cable Laying around 184 Km

Cathodic Protection work for around 184 km (8’’ & 16’’ pipe line)

Earthing work, Lighting & small Power distribution work, cabling 3, April 2010 to Dec 2012:

As a Lead Engineer Electrical for SAIH NIHAYDA DEPLETION COMPRESSION PHASE-1 Project : PDO Contract No C310995,

Responsible for Construction & commissioning of New 132kv Substation at SNDC which Includes Installation, Testing & commissioning of 5N0’s of Power transformer ( 3 No’s 25MVA for Feeding the Compressor motor & 2 No’s 20MVA station Transformer)

132kv substation Outdoor consisting of 7 bay’s with all allied substation Equipment.

Construction of New 132kv OHL on steel Tower / Double Circuit including LILO Provision and Ties-in from the existing systems ( LILO from SR2PP(AIS) – SNH 132kv OHL and the 132kv OHL to SNGP substation.

Modification work for the Existing SNH and SR2 PP (AIS) 132kv Substation including the Scada signal Modification & Updates work.

Installation of 33kv GIS (ABB Make –Under Vendor supervision) Including Testing & commissioning.

Earthing, bonding and lightning protection system.

The Electrical Power Distribution systems for Auxiliary loads as well as building services like Lightning, HVAC, etc Including HV & LV switch gear, EAT – transformers & other system components.

4, May 2008 to April 2010:

As a Senior Engineer Electrical for Full Field Water Injection Project Nimr-C : PDO Contract No C31/0913,

Responsible for Modification/Refurbishment work at Nimr-E 132 KV Substation which includes Replacement of Existing 14/15MVA Transformer- 2No’s with new 40/50 MVA Transformer,EAT –( Zig -Zag Transformer Installation -2 No’s) HMX-36 (33KV) Breaker Existing CT Replacement with new CT’s & 132Kv CRP 33Kv CRP Existing panel replacement with new Panels in control Building.

The activities in Nimr-E involves major Shutdown job & this shutdown job has been carried out successfully with in the stipulated time for Bay-2 (A210) & Bay-1

(A110).

Construction of New 33Kv Twin ELM OHL from Nimr-E 132Kv Substation to New 33Kv GIS control Building ( Nimr-C) & HV cable Laying from Riser pole has been executed successfully & line ready for energization.

Erection of Transformer like 40/50 MVA, 4MVA, 630KVA, 2 MVA Including Oil filtration & testing.

Installation of 33Kv GIS ( Areva Make -Under Vendor Supervision), 415V LV Switch Board Installation, Other LV switch gear Like HVAC Panels, Outdoor/Indoor Lighting Distribution board installation, Hv & LV cable Laying & Termination has been executed presently.

5, April 2006 to May 2008;

As an Electrical Engineer for Mukhizna Power plant Project For PDO

Construction of New 132Kv Switchyard having a 1 1 2 Breaker Scheme

(consisting of 5 Bays) & with all allied substation Equipment

6.6. KV/ 11KV/ 33 KV Switchgear installations, testing and commissioning.

Installation of Station Auxiliary Transformer, 415v LV Switch Board, 132KV Control & relay Panels, Battery Installation

Modification/ refurbishment work in (RIMA, HUBARA, NIMR WEST) 132kv Substations

Executed 132KV Bus Bar Extension & 132Kv Bay extension with all allied substation equipment in (RIMA, HUBARA, NIMR WEST) 132kv Substations

Construction of New 132KV OHL as an 132KV Over head line Interconnection between ( Mukhizna, Rima, Nimr west & Hubara ) 132Kv stations. 6, July 2004 to March 2006 :

Electrical Engineer for 240KW Wind power Generator, M/S NEPC wind form Coimbatore Tamil Nadu

Installation of 240KW wind Power Generator in Both 20Mtr’s Lattice & Tubular Tower.

Erection & commissioning of 240KW wind power generator

Transmission, Distribution of 11 kV, 400V & 220 VT

Erection, Commissioning and Installations of 11kv Substations 7, July 2002 to July2004:

Assistant Engineer Electrical for M/s Lakshmi Electrical, Nagercoil, Tamil Nadu

Installation of Distribution Transformers of 500 KVA, 300 KVA, 200KVA 100 KVA and 63 KVA capacities, Circuit Breakers & all allied Electrical Equipment required for Industrial Commercial and Domestic Consumers.

Construction of 11Kv & 33Kv overhead line & Distribution of Power supply on 11Kv, 400V & 220V for commercial & industrial consumers. 8, December 2001 to June 2002:

Junior Engineer Electrical for M/s Smile Engineers, Nagercoil

Trained in HV & MV Electrical Equipments installation including Termination

Trained /Executed in industrial/domestic electrical wiring.

Trained to prepare estimation & drawing preparation.

Work on Conventional Fire Alarm system

Installation of cable tray works, LVAC/HVAC panel’s terminations, and cable joints up to 3 core 250 sq. mm cables etc.

Trained for LV/Control cable panel termination.

Installation & testing of LV motors.

PERSONAL PROFILE:

Name : C.JEGATHESH

Date of Birth : 09.09.1977

Father’s name : M. Chinnappa

Gender : Male

Marital status : Married

Nationality : Indian

Passport No : P3115887

Languages Known : Tamil, English, Hindi and Malayalam Permanent Address : No-4, Deep street,

Vadiveeswaram,

Nagercoil-629 002

Present Address : Al-Hassan Engineering CO.S.A.O.G P.O.Box : 1948, P.C112 Ruwi

Sultan of Oman

Declaration:-

I hereby declare that the above furnished statements are true to the best of my knowledge and I hereby pledge that I will be adherently loyal to any organization that I am working in.

Yours Truly,

(Jegathesh.C)



Contact this candidate