Post Job Free
Sign in

Machine Operator High School

Location:
San Antonio, TX
Posted:
February 01, 2017

Contact this candidate

Resume:

Montez Wherry

Phone: 210-***-****

**************@*****.***

OBJECTIVE

To obtain a challenging position in engineering, electronics, maintenance which would allow me to utilize my skills and give me an opportunity for advancement.

EMPLOYMENT HISTORY

Maintenance Technician

Supadoors

January, 2016 July, 2016 (6 months)

Maintain and repair production equipment in a dedicated machine area

Responsible for preventative maintenance, machine repair, project work, and other work as assigned

Work individually or with team members and maintain a positive work environment

Install, maintain, and repair machinery, equipment, and electrical systems

Follow specifications, blueprints, manuals, and schematic drawings using hand tools, power tools, hoist, and measuring and testing instruments

Test malfunctioning machinery, using test equipment, and discusses malfunction with other maintenance workers

Complete 5S checklist and follow all safety policies and procedures at all times

Participate in daily production team meeting.

Repairman

Home Elevators of Texas

April, 2015 January, 2016 (9 months)

Install and repair Elevators, wheelchair lifts and stair lifts in residential homes and commercial facilities, in and San Antonio, Houston, Austin, Texas.

Machine operator

Toyotetsu Texas Inc

July, 2013 March, 2015 (1 year 8 months)

Production Maintenance

Stamping and welding

Machine operator

Machine and quality check

Fabricated parts

Clean Machines and machines parts, using solvents or other necessary equipment

Inspect or test damaged machine parts

Install, replace, or change machine parts

According to production specification

Reassemble machines after maintenance repair

Wire limit switches

Welding, operating various welding equipment

Polish, grind, and finish as needed

Interpret customer prints, engineering specifications and layout

Lift dies using host or crane.

Kevlar Installer

S.F.I

September, 2009 July, 2010 (11 months)

Wet layup

Prep layout

Metal-to-Metal Bonding/Hot Bond

Advanced techniques

Prime parts

Event Services Lead Houseman

Marriott Hotel

June, 2003 June, 2009 (6 years 1 month)

Supervise and direct staff of approximately 5-10 members

Setup all functions to diagram or verbal instructions provided which will include all tables, chairs, staging, dance floor, special props, skirting and dressing of all buffet tables and special materials tables

Coordinated parties, conference rooms, ballrooms and meetings.

EDUCATION

ITT Technical Institute

AAS Computer Electronics Engineering,

Alamo Heights High School

High School Diploma



Contact this candidate