OBJECTIVE

Position as a Mechanical General Superintendent or Mechanical Superintendent.

PROFILE

* 26 Years in Piping/HVAC/Process Piping/Industrial systems and construction supervision, managerial operations, estimation, and extensive field experience, to Piping Apprentice, to Journeyman, Foreman, Gen Foreman, Superintendent, Gen Superintendent, Estimator, Project Manager, and Director of Operations.

* Knowledgeable, Engaged, Focused, Tenacious, and Highly Professional.

* Experienced not only in all facets of Mechanical, but have working knowledge of Civil, Architectural, Structural, Plumbing, and Electrical.

* Ability to direct complex projects from conception to fully operational status.

* Goal-oriented individual with strong leadership and motivational capabilities.

* Proven ability to work in unison with staff, Subcontractors, General Contractors, and Owners on the most costly and complex projects.

* Knowledge includes Nuclear Power Generation and Petrochemical construction and repair.

* 10 Years of Project Development/Project Management, Piping/HVAC Estimation.

* Trained in Metasys usage by Johnson Controls, Engineering, Programming, and Installation.

* Well versed in MS Office, MS Project, ESMS, Quick Pen, Job Tracker, SAP, and extremely computer literate.

* Have estimated and managed over $ 100 million dollars in HVAC/Industrial projects.

* Directed manpower and budget for GM World Headquarters, resulting in positive profit margin project variance.

* Designed service development plans and conducted operation assessments for service contracts.

* Counseled workers on defining career and work related goals and objectives.

* Estimated over $ 46 Million dollars in Change Orders and negotiated successful payment of same.

* Directed recruitment and retention of supervisors and staff of two companies.

* Trained, supervised and evaluated staff, coached improvement in management skills.

EMPLOYMENT

WORK HISTORY SINCE 1990

2016-Jan 2017t- Project Superintendent; Erickson and Lindstrom, Flint Michigan. Oversaw Civil, Structural, Architectural, Mechanical, and Electrical installation at KAMAX facility. Job completed Jan 2017.

2015- Construction Manager- General Superintendent/ Construction Manager; Cherne Contracting Co. (Hired 11/23/2014). Contract completed due to project termination at the owner level. (3/10/15). PCS Nitrogen Lima, Ohio. Performed turnaround at FHR 9/29/15 through 11/1/15 through Union Hall.

2014- Independent Contractor- Superintendent; FHR (Koch Brothers soot blower replacement upgrade), Prairie Island Nuclear Generating Station Instrument Air upgrade, Xcel Energy.

2013 Independent Contractor - Superintendent ;Monticello Outage, NTP QC, Flint Hills QC, PI STEAM GEN (Replacement of two B&W Steam Generators, Controls, and Instrumentation) Project cost $120 million.

2012- Independent Contractor – Superintendent; Prairie Island Nuclear Generating Station Siemens, turbines FHR Turnaround (Unit 35), Prairie Island Nuclear Generating Station D&Z Power upgrades.

2011- Independent Contractor –Superintendent; JW Turk, coal scrubbers, Monticello pump vaults, Prairie Island Nuclear Generating Station Siemens (turbine upgrades)

2010- Independent Contractor refuel, (Foreman) Monticello Nuclear Generating Station (Day and Zimmermann), Prairie Island Nuclear Generating Station, DC Cook NPS, Palisades NPS power upgrades.

2009- Independent Contractor Superintendent; Heavy Rigging Crew, Bechtel- Elm Road Coal power plant, Unit 2.

2007-2009 Independent Contractor General Foreman/Superintendent; Horwitz Mech. Sears Midtown Condo Conversion project. HVAC skyscraper gutted and replaced all heating/AC/plumbing.

2006-2007 LSS Project Manager Johnson Controls MPLS Branch: IGH school system (5 schools combined controls, WBL school system (6 schools combined controls). Projects were all HVAC systems.

2003-2005-Director of Operations Lovegreen Mechanical– Boiler Installation projects and WIRSBO production lines.

2002--General Foreman Refuel outages for:, Prairie Island Nuclear Generating Station, Monticello Nuclear Generating Station (Day and Zimmermann), FHR (Koch Brothers)

1998-2001.Project Manager/Estimator John E Green Co...Renaissance Center, Detroit Michigan GM renovation (HVAC upgraded from original design), Detroit Marriott (Plumbing and controls) and Auto Alliance, Flat Rock MI (paint booths)

1997 Design Consultant NRG Energy Conservation projects for DOD….

CCAD, Corpus Christi, TX ( million square foot building for helicopter repair), Wightman AFB...Boiler replacements for existing coal fired boiler, and flight simulators (Simulators used for B-2 bomber training required advanced A/C to avoid overheating and burnout).

1996 Foreman- 3M A5 LISM line R&D (Beta design Videotape production). Was chosen due to ability to understand written and spoken German, and translate Bavarian instruction. Machine was a DuPont design that was made in Bavaria by Brueckner, dismantled, and brought stateside. I led the American team that put it back together.

1992-1996 UA Apprentice New Mech; Apple Valley schools: Eastview High School (HVAC with Kewaunee Boilers) & Falcon Ridge Middle School (HVAC with package Cleaver-Brooks boilers).

1990-1992 UA Apprentice Koch Oil Refinery, Process piping on Units 24 and 25

SKILLS

Computer Literate. Includes Quick Pen Estimating software, Microsoft Office, MS Project.

CPR trained 1981, 1988, 1992, 2005

Speak three languages; German, Italian, English (both Queens and American)

Excellent public speaker and speech presenter

EDUCATION

MASTERS OF SCIENCE IN MANAGEMENT DEGREE JUNE 1997 CARDINAL STRITCH UNIVERSITY

Major: Corporate Management

Cumulative GPA 3.87

ASSOCIATES IN LIBERAL ARTS DEGREE JUNE 1990 UNIVERSITY OF MINNESOTA

Major: Liberal Arts

Focus disciplines: Biology, Psychology, Anatomy and Physiology

Dean’s List 1985-1990

ASSOCIATES PIPE SCIENCES DEGREE [JUNE 1995] ST Paul TECHNICAL COLLEGE

Professional and Personal references upon request.