Rizki Rahmadi Putra - Curriculum Vitae, Jan **th, 2017 1 of 4
Name : Rizki Rahmadi Putra
PHOTO
Nationality : Indonesian
Position : Sr. Well Service Engineer at Petronas Carigali Indonesia
Contacts : (Mobile) +62-811*-******
Email :*****.************@*****.***
Qualification :
Diploma III State Polytechnic of Jakarta (Poltek UI) majoring Mechanical Engineering
Bachelor Degree University of Indonesia majoring Mechanical Engineering Experience :
May 2015 - Present Sr. Well Service Engineer at Petronas Carigali Indonesia
The scope include well integrity and well intervention activity
Ensure all parts of the well operating envelope are maintained as per the company's Well Integrity Management System, (WIMS)
Management of the tree and wellhead maintenance contractor to ensure delivery of the planned maintenance routines
Management of the well integrity status tool, (WIST)
Update the well data result of CDFT to IWIT
Create well file through Well View program
Create simulation well intervention through Cerberus program
Planning and delivery of yearly well examination routines
Identify efficiencies to reduce company costs and increase production
Assist with the Tender process and contract award
Create purchase requisitions in work order, check and approve invoices for payment
Create well intervention program regarding well integrity and well interventions operation
Prepare and review intervention programmes and work instructions (logging job, gas lift change out, zone change, unloading job, stimulation job)
Supervise well intervention and well integrity job execution
Keep up to date with changing regulations and legislation regarding wells and well integrity. Inform the wells team of any changes which are imminent or already in place to ensure company compliance
Communicate with industry peers and work together where possible to share information on industry standards and efficiencies Acting Night Drilling SPV Man at Petronas Carigali Indonesia
Monitor and control drilling operation
Update the report through Open Well progarm
Update the Drilling Cost day by day
Make coordination with service company provider
Rizki Rahmadi Putra - Curriculum Vitae, Jan 19th, 2017 2 of 4 Oct 2012 – Apr 2015
Completion and Workover Engineer for Wellhead Systems at TOTAL E&P Indonesie
Arrangement working contract (Expenditure, Contract Validity and Term n Condition)
Arrngement BOP, Riser and wellhead stack up configuration as per rig and platform required
Ensure and maintain minimum stock inventory based on the system and actual
Technical vocal point and advisor related wellhead system
Managing of preparation for tender (scope of work, budgetary, wellhead consumption and drilling program for wellhead architecture)
Arrange wellhead design and re-design as per well required Feb 2012 – Sept 2012
Application Engineer and Bussiness Unit Coordinator at Weatherford Asia pacific
Technical vocal point for customer related pressure control and drilling rental tool equipment
Supporting field hands job on site area
Solve field issued regarding equipment installation and equipment uitilized on site area
Contract holder for pressure control equipment
Assist contract preparation and bugedtary ralated pressure control equipment March 2010 – Jan
2012
Field Service Coordinator and Desk Engineer for PHE ONWJ Operation at PT FMC Technologies Indonesia
Field engineer arrangement as per customer call out
Field engineer competency skill development
Field engineer training and competency skill matrix development
Solve field issued coordination with technical engineering and after market manager
Wellfile arrangement and development
Sept 2009 – March
2010
Desk Engineer for PHE ONWJ Operation at PT FMC Technologies Indonesia
Responsible for Wellhead and X-mas tree Contract Arrangement Projects:
Well Integrity
Wellhead Maintenance (arrange that related with spare part, personnel and regulation w/ custommer required)
Drilling
Drilling new well (arrange that related with spare part, personnel and regulation w/ custommer required)
Work Over
Recompletion well (arrange that related with spare part, personnel and regulation w/ custommer required)
2007 – Sept 2009 Technical Service Personnel with PT FMC Technologies Indonesia, Jakarta, Indonesia
- Wellhead and X-mas tree installation
- Wellhead and X-Mas Tree Valve Maintenance
- Wellhead and X-mas Tree Spare Part Inventory Management
- Well recording for wellhead equipment
- Reporting
Rizki Rahmadi Putra - Curriculum Vitae, Jan 19th, 2017 3 of 4 Main Projects:
BP Tangguh - HPHT Wellhead System
Split Unihed & Tree System, 30 X 18 5/8 X 13 3/8 X 10 3 4 (9 7/8) OD Casings X 7 OD Tubing, 30 BW X 20 3/4-3K Speedloc II Clamp Hub X 13 5/8-10K Flg X 13 5/8-10K Speedloc II Clamp Hub X 7 1/16-10K Flg Connection.
PDO (Petroleum Development of Oman) - HPHT Wellhead System Support FMC Oman to complete the contract job with PDO: Install Unihead system 18 5/8 x 13 3/8 x 4 1 2 OD Tubing with speedloc II clamp and with RCMS connector 15 K Psi working Pressure.
HESS Ujung Pangkah Ltd.
Support Hess drilling exploration with Installation 30” Landing Ring, 20 3/4”- 3K Casing Head, 18 5/8” x 13 3/8” Mandrel Hanger, 18 5/8” Pack Off, 13 5/8”-5K Unihead, 13 5/8” x 9 5/8” Mandrel Hanger, 9 5/8” Pack Off and 4 1/16”-5K X-Mas tree.
Vico Indonesia
Support Vico drilling exploration with Installation Conventional wellhead w/ dual string
Bunga Mas International Company (BMIC)
INSTALLATION SURFACE - UNIHEADS, 11- 5K UH-2 SYSTEM W/ LATCH- TYPE PACKOFFS, W/ 9 5/8 SOL X 11-5K FLAMP UNIHEAD, 9 5/8 X 7 PRODUCTION CASING X 2 7/8 TUBING
APEC (BMIC)
INSTALLATION 30 X 20 X 13 3/8 X 9 5/8 OD CSG X 4 1/2 OD TBG, WELLHEAD SYSTEM 30 BW X 20 3/4- 3K CLP HUB X 13 5/8-10K FLAMP X 4 1/16-10K STDD CONN. W/ ABANDONMENT VALVE
EMP Group (Kondur and Kalila)
INSTALLATION SURFACE 13-5/8 SOL Bottom x 11 Top flange Casing head and complete with X-Mas Tree 3-1/8 3K
2004 - 2007 Toyota Motor Manufacturing Indonesia as a Production Foreman and TPS (Toyota Production System) Trainer
Computer Skills :
MS. Office
Auto Cad
Visio
Catia
Personal :
With my educational and experiences background, I feel capable of handling any tasks that your company may assign to me. I am accustoming to work hard definite goal in with limited time, able to analyze problem and its solving. And I have a good relationship to people, good communication, good responsibility, creative thinking and dynamic. Beside that, I am eager to learn new things in new fields. Course Attended :
2015 E-Line Operation
2015 Slick line Operation
Rizki Rahmadi Putra - Curriculum Vitae, Jan 19th, 2017 4 of 4 2015 Coil Tubing Operation
2016 Basic Completion Design and Practices
2016 Completion Equipment
2016 Wellhead Flow Control Equipment and Flowlines 2016 Wireline Production Operation
2016 Overview of Rigless Well Intervention
2011 Cold Casing Cutting Competent
2011 On Line Training CBT Casing Spool Installation 2011 On Line Training CBT Tubing Head Installation 2011 On Line Training CBT Casing Slip Hanger Installation 2011 On Line Training CBT UWD-15 Installation
2011 On Line Training CBT Working Safely With Power Tools 2012 Drilling Tools Technology – Introduction to Pressure Control Equipment 2012 Introduction to Petroleum – Rigs and Installation 2012 Introduction to Petroleum – Drilling
2012 Introduction to Petroleum – Evaluation
2012 Introduction to Petroleum – Completion
2012 Introduction to Petroleum – Production
2012 Introduction to Petroleum – Advance Technology 2012 Introduction to Well Control – Well Control Equipment 2012 OHSAS 18001
2012 Safe Start
2011 On Line Training CBT Fire Saftey
2011 On Line Training CBT Hands Protection
2011 On Line Training CBT Job Safety Analys
2007 T-BOSIET (Tropical Basic Offshore Safety Induction Evacuation Training & Boat Transfer)
2007 Service Skill Training (support knowledge as wellhead engineer & approach to customer)
2008 Cold Cutting Casing