Curriculum Vitae
Abdul samad
Address: Bright international Jubail
Phone No: +966*********
Email: *************@*****.***.
Career Objective
I am seeking challenging and creative position in a progressive, stimulating and challenging working environment where my skills can be fully utilized while sharing and gaining new experiences and knowledge
Personal Details
Iqama 240-***-**** (TRANSFERABLE)
Father Name: Abaidullah
Driving license Valid 2019
N.I.C 35404-9409399-1
Passport # AA5273992
Nationality: Pakistan
Date of Birth: 23-08-1986
Religion: Islam
Trade Electrical & Instrumentation
Educational Qualifications:
B.E. (Electrical Electronic)
D.A.E (Electronic)
Metric
P.E.C Registration No. ELECT/38965
Internship
Organization and Experience .more then 8 year
Organization: Saudi kayan limited (Harisco Saudi ltd)
Duration: Nov.16 to Ongoing
Designation: E&I Site Engineer
Job Description: Installation of analyzer shelter
Organization: ARAMCO GOSP & CPF (Harisco Saudi ltd).
Duration: Feb.16 to Oct.16
Designation: Electrical & Instrumentation Project Engineer.
Job Description: Here I was responsible for E&I execution testing, pre commissioning work, fully coordination with the execution crew regarding site issues and daily meeting with the client representative regarding work plan and work progress.
Worked on underground Transmission lines and switch gears and terminations of Ht cables and panels installations.
Organization: Expert Arabia Ghazlan power plant Dammam
Duration: July.15 to Jan. 2015
Designation: Electrical &Instrument Engineer.
Job Description: up gradations of ABB DCS system and grid station.
Organization: Descon Engineering Limited (ICI Coal Fire 15MV Power plant)
Duration: Nov.14 to June.15
Designation: E&I Site Engineer
Job Description: Installation of LV & MV panels, installation cable tray and grounding system, Erection and fabrication of cable tray and conduit, Pre commissioning, and commissioning.
Organization: ICI Polyester Pakistan
Duration: Feb 2014 to Aug 2014
Designation: Assistant E&I Engineer
Job Description: Extension of Coal Fire Dow Heater.
Organization: Descon Engineering Limited (MOL Oil & Gas field CFP2)
Duration: Dec 2012 to Nov 2013
Designation: Assistant Engineer of Execution Testing and Commissioning
Job Description: Site Engineer
Organization: Albario Engineering Limited (Saphire power plant)
Duration: Nov 2008 to Aug 2009
Designation: Lead Man
Job Description: Steam Boiler and Arrangement of LV, MV, and DCS Room.
Organization: Al Jabir Engineering limited (UAE)
Duration: Aug.2007 to Nov.2007
Designation: Instrument Technician
Job Description: Calibration Technician.
Organization: Saba Power Plant Sheikhupura, Pakistan.
Duration: June.2006 to July.2007
Designation: Instrument Technician
Job Description: Execution and Commissioning.
Electrical works
Supervision the team of Gladding Termination and continuity of the high and low voltage cables.
Arrangement and planning for installation of DCS, MV and MCC panels.
Monitor the all activity of HT kit gladding termination and (high pot) test between cables core and bus bars.
Works on Cable laying activity, like confirm the route and write the perfect cable tag on cable.
Monitor the all kind of termination like HT LV motors, street light internal light panel to panel.
Installation of Bus tie Duct from power transformer to MCC panel.
Fabrication of Cable tray as drawing or as suitable route.
Cable laying for Earthling system and Plant Electrical Grounding.
Specified, installed, configured and repaired various types of industrial machine with AC and DC drives, VFD,s and vector drives like (Mitsubishi Hitachi. control techniques, Siemens, Emerson…etc
Design, built high speed application (cut to length, seal, press feeder, counter) using encoder, PLC and HMIs.
Troubleshooting and service of invertors and convertor.
Maintenance and inspection of AC and DC motors.
Check and service fire & gas and smoke detectors, etc.
Maintenance of proximately and foot switch.
Maintenance and service of grid station like transformer switch gear and all kind of auxiliary component.
HT, LT Transformers, Siemens
AC, DC Motors All types including HT, MV, LT (Siemens, GE, Dresser)
Switch gear, breakers, MCC's, UPS system.
Plant lighting, building lighting, Street lighting, Emergency lighting system.
Instrument works
Calibration of the LT,PT,FT,TT, Level Gauges, Pressure Gauges, Level Switch, Pressure Switch, Temperature Switch, Thermocouple, RTD
All E&I Cable pulling, cable ladders/conduit JB installations and terminations, tubing/air supply piping installations,
Identify the location of Junction Boxes (JB) as layout drawing for primary and secondary cable installations for nearest instrument
Coordinate with the mechanical team for identify the FT.PT.LT.TT. and Gauges points on required pipe line
SS and PVC Tubing for all the LT PT FT MOV Control Positioner and for pressure Gauges as per their hook drawing
Configuring and faults diagnosis of DCS, PLC, Profibus Communication, Analyzers and Control Loops.
Maintenance and calibration of the control valves (Pneumatic, MOV, NRV)
Familiar with engineering standards IEEE, ASTM, ANSI, NEMA, IEC.
Maintenance and calibration of transmitters PT, LT, TT, DPT (Emerson Rosemount, Endress&ABB) and Monitoring vibration transducers.
Burner Management System: Pneumatic and PLC based burner management system for boilers and Furness.
Fire & Gas and Smoke detection System: General Monitors, Detronics.
Communication System: CCTV, Intercom system, PABX.
PLC based control loops troubleshooting of relay logic.
Responsibility
Responsible for E& I execution QA/QC, testing, pre commissioning work, fully coordination with the execution crew regarding site issues and daily meeting.
To ensure all work, tests and inspections undertaken by Sub-Contractor is in accordance with the specifications/Contract Requirements and signs the relevant Test Certificates.
To ensure implementation, monitoring of QA/QC procedures and take corrective measures where required.
Installation Inspection of Substation Equipment, Switchgear, Motor Control centers, cubicles, small Power DB's, Bus duct, HT Panels etc.
Inspection of breaker testing during pre-commissioning and commissioning activities.
Inspection of installation and testing of grounding system on.
Training and course
I got multiple HSE and H2Sawareness trainings in ICI Polyester Pakistan and MOL, Petroleum Development
HSE Training course in Pakistan
Computer skill
AutoCad 2012, Auto cad 2006 Electrical, MS Window, Office.
Software
SAP (System Application Product)
Step7 Wincc, directSoft 4, CX Programmer, LOGO soft 5
WINCC Flex, Fluke View Forms
PLC Programming Ladder Diagram