RANDY GLENN G. VELORIA
e-mail: *****.*******@*****.***
MOBILE NO. +974-******** (QATAR)
RG Veloria Page 1 of 9
HEAVY LIFT RIGGING AND TRANSPORT ENGINEER
AREAS OF PARTICULAR EXPERTISE
Planning of all Critical, Heavy and medium lifts including production of lifting studies, drawings, calculations, method statements and safe job analysis.
Providing onsite planning and coordination of all heavy lifts and transport during projects and shutdown operations.
Overseeing and coordinating for receiving of heavy equipment from heavy lift vessels, load outs & load in from barge, and transport operations.
Arrange lifting planning, calculations and installation for Compressor, Turbines and Generators using Hydraulic Gantry.
Planning of Installation drawings and procedures for Heavy lift items using jacking and skidding system.
Responsible for preparations of engineering drawings, calculations and procedures related to the systems selected for the execution of project work
Responsible for reviews and approvals of all sub-contract lifting and rigging plans including verifications of rigging certifications, ground bearing calculations, crane lifting capabilities and clearances.
Completing feasibility studies, checking crane capacities, locations, and elevations for clashes and transport route clearances.
Provide field supervision and execution of the heavy haul and heavy lift operations.
Ensure compliance with company Rigging Standard Work Process Procedures at the jobsite.
Coordinate and supervise subcontractor work at the job site. PROFESSIONAL EXPERIENCE:
MEDGULF CONSTRUCTION CO. (WLL)
Position: Rigging Engineer
June 2015 – Present
Project : Commercial Development for Nozul Real Estate/ Commercial Building (2B+G+M+F) Responsibilities: Planning and prepares engineering drawings, method statement and calculation for selecting suitable crane, monitoring lifting gears and riggers third party certificates.
QATAR ENGINEERING AND CONSTRUCTION (QCON-QATAR)
Position: Rigging Engineer
RANDY GLENN G. VELORIA
HEAVY LIFT RIGGING & TRANSPORT ENGINEER
RGV Page 2 of 9
April 2014 – April 2015
Project: Shell GTL, Qatar
QSGTL Turn Around Main Mechanical Services (Shutdown) Responsibilities: Planning and prepares engineering drawings, method statement and calculation for selecting suitable crane, lifting tackles and trailers for Turnaround Main Mechanical Services.
QATAR ENGINEERING AND CONSTRUCTION (QCON-UAE)
Position: Rigging Specialist
January 2013 – January 2014
Project: ADGAS (Abu Dhabi Gas Liquefaction Company Ltd.) Train 3 Turnaround 2013 Project
Responsibilities: Planning and prepares engineering drawings, method statement and calculation for selecting suitable crane and lifting tackles for live plant shutdown project. QATAR ENGINEERING AND CONSTRUCTION (QCON)
Position: Rigging Engineer
Project: JBOG (Jetty Boil-off Gas)
April 2011 – January 2013
Client: Fluor / Qatargas
Responsibilities: Prepares engineering drawings, method statement and calculation for selecting suitable crane and lifting tackles for installation of 4 Km. Pipes & pipe loops from 6” to 60” diameter nearby existing Gas pipeline and live plant area. Project: NGL 3 Shutdown
Period: April 2010
Client: Qatar Petroleum (QP)
Responsibilities: Prepares engineering drawings, method statement and calculation for selecting suitable crane for removal, lifting and installation of various columns, exchangers and others.
Project: Oryx GTL Shutdown
Period: March 2010
Client: ORYX GTL
Responsibilities: Prepares engineering drawings, method statement and calculation for selecting suitable crane for removal, lifting and installation of various equipments. RANDY GLENN G. VELORIA
HEAVY LIFT RIGGING & TRANSPORT ENGINEER
RGV Page 3 of 9
Project: Qatar Chemical
Period: Dec. 2009
Client: QCHEM
Responsibilities:
- Prepare engineering lifting plan, calculation and Method for existing plant.
- Installation and Removal part item of Dehexaminer Column (130.0 Tons crane). Project: VOC Project
Period: January 2010
Client: Dolphin Energy
Responsibilities:
- Prepare engineering lifting plan, calculation and Method for existing plant.
- Installation of ATR Gas and Nozzle using 200.0 Tons crane. Project: Tank Farm Area
Period: May 2009
Client: Dolphin Energy
Responsibilities:
- Prepare engineering lifting plan, calculation and Method Statement for shutdown and project. (70.0 – 250.0 Tons cranes)
- Installation of new Motorized Operated Valve.
- Installation of Roof Water Tank frame.
- Installation of Loop pipes.
Project: Ammonia & Urea
Period: January 2009
Client: QAFCO
Responsibilities:
- Prepares engineering lifting plan, calculation and Method Statement for shutdown project. (70.0 to 400.0 Tons cranes)
- Removal and Installation of new Waste Heat Boiler
- Removal and replacement of Ammonia Converter cover.
- Removal and Installation of New Reformer Tubes.
- Installation of new Fan Assembly.
- Modification of support for Bubble cap tray 45.0m high.
- Replacement of First Stage Separator.
- Prepare engineering lifting plan, calculation and Method Statement for Melamine project.
- Lifting and tailing operation for the installation of Carabamate solution surge drum.
- Installation of 3 nos. SILO Tank (Melamine storage bins) ALE (ABNORMAL LOAD ENGINEERING) - UAE/Qatar
Position: Rigging & Transport Engineer
RANDY GLENN G. VELORIA
HEAVY LIFT RIGGING & TRANSPORT ENGINEER
RGV Page 4 of 9
Project: QATAR PEARL GTL
Period: 2007-2008
Client: SHELL GTL
Responsibilities:
- Responsible for all technical/engineering documentation in relation to the projects:
- In charge for making a transport drawings (AutoCAD).
- Prepare transport study and trailer configuration for various projects and on tenders.
- Prepare engineering transport design and calculation as required to the projects.
- Prepare lifting plan and trailer arrangement drawings.
- Prepare Method Statement procedures for heavy lift items. Conduct route plan survey and direct the trailer to the designated laydown area.
- Attend site coordination meeting and advise necessary procedure for lifting and transport heavy of heavy lift items.
- Report directly to the Operation Manager.
Position: Project Engineer
Project: Messaeeid Power Plant
Period: Sept. 2009
Client: QATALUM
Responsibilities:
- In charge for making a transport drawings (AutoCAD).
- Prepare transport study and trailer configuration for various projects and on tenders.
- Prepare engineering transport design and calculation as required to the projects.
- Prepare lifting plan and trailer arrangement drawings.
- Prepare Method Statement procedures for heavy lift items.
- Conduct route plan survey and direct the trailer to the designated laydown area.
- Attend site coordination meeting and advise necessary procedure for lifting and transport heavy of heavy lift items.
- Report directly to the Operation Manager.
Position: Project Engineer
Project: Shell Pearl GTL Project
Period: April 2007 to Sept. 2009
Client: TTJV
Responsibilities:
- Transport and Installation of Heavy lift Items below 500 metric tons.
- Site move of heavy lift items from laydown area near to the foundation.
- Jacking and sliding operation for installation of heavy lift items.
- Installation of Hex box (217.0Te) using heavy crane LR 1750 RANDY GLENN G. VELORIA
HEAVY LIFT RIGGING & TRANSPORT ENGINEER
RGV Page 5 of 9
- Installation of Cold Box (460.0 Te)
- Transport and Installation of Desalination Skid (20.0m wide x 25.0m
- Length x 17.0m high)
Position: Transport Engineer
Project: Qatar Vynil Corporation
Period: May 2007
Client: QVC
Responsibilities:
- Jacking /sliding and installation of Boiler block (180.0 Metric Tons) Position: Transport Engineer
Project: (AGD-II) Project Abu Dhabi UAE
Period: May 2007
Client: ASAB
Responsibilities:
- Receiving of heavy lift and oversized items from heavy lift ship, land and marine transportation from port area to laydown area
MAMMOET MIDDLE EAST
Position: Staff Engineer
Project: Dubai Metro Train
Dubai UAE
Period: 2007
Client: Kamigumi UAE
Responsibilities:
Responsible for all technical/engineering documentation in relation to the projects:
- Prepare transport study and trailer configuration.
- Transport of concrete segments (Pier Cap & Viaduct) using hydraulic trailer.
- Transport and Installation of Tunnel Boring machine (TBM) using hydraulic trailer and Demag CC-2400-1 Crawler Crane (SSL) 400.0 Te. Capacity
- Prepare lifting plan and trailer arrangement drawings.
- Prepare Method Statement procedures for heavy lift items.
- Report directly to the Engineering Manager.
RANDY GLENN G. VELORIA
HEAVY LIFT RIGGING & TRANSPORT ENGINEER
RGV Page 6 of 9
Position: Staff Engineer
Project: Aweer Gas Turbine Phase II,
Dubai UAE
Period: 2005
Client: BEMCO
Responsibilities:
Responsible for all technical/engineering documentation in relation to the projects:
- Prepare transport study and trailer configuration.
- Prepare engineering design and calculation as required to the projects.
- Prepare lifting plan and trailer arrangement drawings.
- Prepare Method Statement procedures for heavy lift items.
- Conduct route plan survey and guide the trailer to the designated laydown area.
- Report directly to the Engineering Manager.
Position: Transport Engineer
Project: Aweer Gas Turbine Phase II,
Dubai, UAE
Period: 2006
Client:
Responsibilities:
- Transport and Installation of 230.0 Te Gas Turbine and Generator using the Hydraulic Lift & Lock System
Position: Transport Engineer
Project: Dhaid Power Station
UAE
Period: 2005
Client:
Responsibilities:
- Transportation of 2nos. of Transformers 232.0 and 130.0 Te (300MVA & 500MVA) respectively using the Hydraulic Trailer
Position: Rigging Engineer
Project: TRAIN-5 RAS LAFFAN ONSHORE EXPANSION PROJECT CMS&A Period: 2005
Client: RASGAS
Responsibilities:
RANDY GLENN G. VELORIA
HEAVY LIFT RIGGING & TRANSPORT ENGINEER
RGV Page 7 of 9
- Transport and site moved of Vent Stacks 46.0 Te, 33.0 Te, 37.0 Te & 45.0 Te.
- Transport and site moved of 108.0 Te Boilers
- Transport of TEG Contractor Inlet Separator 168.0 Te
- Transport of Feed K/O Drum 367.0 Te.
- Transport of LLP/LP C3 Suction Drum159.30 Te
- Transport of Absorber 551.0 Te
- Transport of Scrub Column 234.0 Te
AL JABER HEAVY LIFT
UAE/ QATAR
Position: Transport & Rigging Engineer
Project:
Period: 2001 - 2005
Responsibilities:
- Responsible for all technical/engineering documentation in relation to the projects:
- Prepare transport study and trailer configuration for various projects and on tenders.
- Prepare engineering design and calculation as required to the projects.
- Prepare lifting plan and trailer arrangement drawings.
- Prepare Method Statement procedures for heavy lift items.
- Conduct route plan survey and guide the trailer to the designated laydown area.
- Attend site coordination meeting and advise necessary procedure for lifting and transport heavy of heavy lift items.
- Report directly to the Engineering Manager.
Project: Oryx GTL Project
Client: ORYX
Responsibilities:
Transport 450.0Te Cold Box using SPMT with bolsters and installed onto the foundation using Demag CC8800.
Installation of AX skid compressor (207.0Te) using LR1500 SDB Project: QATAR PETROLEUM LAB PROJECT
Client:
Responsibilities:
Lifting of Heavy lift Vessels (Weights ranging to 700mTons) Preparation of Engineering calculation, Transport and Rigging study RANDY GLENN G. VELORIA
HEAVY LIFT RIGGING & TRANSPORT ENGINEER
RGV Page 8 of 9
Project: KHALIFA STADIUM (2006 DOHA ASEAN GAMES STADIUM) Client:
Responsibilities:
- Installation of Suspended beam support for the Stadium using AK912 as main crane and tailing crane of 600 tons capacity
- Transport of suspended beam from laydown area to the installation are using spmt trailer
Q-TECH/QATAR PETROLEUM HALUL ISLAND- State of Qatar Transport and Installation of Boiler
DOHA PETROLEUM (DOPET)- OPQL ISND Phase II Expansion PS-1K Project, State of Qatar
DUEGRO MIDDLE EAST- Transport and installation of Absorber, DOLPHIN PROJECT, State of Qatar
FAGIOLI-Boiler Transport and installation, State of Qatar AIR PRODUCTS-Oryx GTL Plant, State of Qatar
ALAN DICK MIDDLE EAST – Installation of Flare Stack, MESSAIEED, State of Qatar
SNAMPROGETTI – Nadco Refinery Expansion Project, State of Qatar Educational Background:
1983 –1988 Central Colleges of the Philippines Philippines Bachelor of Science in Mechanical Engineering
1995 Crescent Technologies Inc. Philippines
Computer Aided Design and Drafting with Autodesk Certification
- Light Vehicle driving (with Philippines, Qatar and UAE driving license)
Place of Birth : Urdaneta, Pangasinan
Date of Birth : August 31, 1966
Nationality : Filipino
RANDY GLENN G. VELORIA
HEAVY LIFT RIGGING & TRANSPORT ENGINEER
RGV Page 9 of 9
Civil Status : Married
Spouse : Marissa M. Veloria
Height : 163 cm
Weight : 65 kgs
Passport No. : EC0336181