I was work for oil and gas more than 10 years, with individual or team .Cooperative and hard working including under pressure Jobs. Good attitude and honest.
Qualification
Electrical engineer, E and I commisioning engineer, Maintenance Hydraulic, pneumatic including PCS ( Pneumatic control system) . Subsea Technical support Personnel for SRT ( Site Receiving Test), EFAT, FAT for client approval. Inspection and Hydro Test and Gas test Up to 20 K psi meet with Safety Regulation International Standard. Specialist on HPU, WHCP.Test and Re- calibration for instrumentation during S/D period or production with P&ID diagram.
Experiences
Subsea Technical Support Personnel FMC Subsea Indonesia
Year 2016
Subsea Technical Support Personnel FMC Subsea Indonesia
July 24- July 31 2016
SRT XT # 10 JKK Project and TH # 11, POSB, Customer ENI.
May 05- May 10
SRT XT # 9 JKK Project Balikpapan POSB, Costumer ENI.
April 22- April 25
SRT XT # 8 JKK project Balikpapan POSB,Costumer ENI .
Year 2015
December 10 – 13
SRT XT # 5 JKK project Balikpapan POSB, Customer ENI
November 9 - 17
MPS SRT Inspection in Bintan Singatac . Customer ENI
June 15 - July 15
Assembly and FAT, EFAT,Hydrostatics test, Gas Test, PSM, Jangkrik Project, Prelude Project, Gumusut Project at NJ-7 Nusa Jaya Client ENI/Shell
May 29- June 10
EFAT Umbilical Disconnect Frame (UDF) and SCM with test stump at Nusa Jaya Malaysia, Client ENI Jangkrik Project
ENI Jangkrik EFAT at FMC Nusa Jaya Johor Bahru-Malaysia
Year 2014
Berkyut Platform Exxon Neftegas Limited For HPU modification and Test for fuction.
MANNORA project, Mubadala as Flushing advisor for tubing line from output of WHCP to field location Thailand
Audit and investigation for 3 Nos Platform Piltun A, Piltun B and Lun- A Island Russia prior to modification on WHCP Owner ( Sakhalin Energy Investment Company ) Shell
Commisioning and X-mas Tree test from WHCP to X-mas tree Mubadala Petroleum Thailand. Location Mannora Offshore.
Halliburton Indonesia for Oil and Gas Sampling Cylinder T6, testing till 22.500 Psi Location Proserv Workshop test Bay .
Years 2012-2013
PT. PROSERV Indonesia Kepulauan Riau Batam Island.
As OFFSHORE AND ONSHORE SERVICE COORDINATOR COMMISSIONING ENGINEER
Project Completed:
Exxon 35 single panel Cepu facility.
Modification for WHCP and HPU Exxon Neftegas Russia Federation.
HPU modification and Wellhead Control Panel Arkatun –Dagi Project 45 wells Upgrading panel Sakhalin Phase 1, Exxon Naftegas Limited (ENL) South Korea .
HUC, BLB platform, Carigali Hess
HUC BLA Platform, CUEL – Carigali Hess
Chevron Phase 45 – WHCP CUEL .
Champion Project, Brunei Shell Petroleum.
Schlumberger Pressure Test Bay Inspection to upgrading with PLC system (Russia)
2010 – 2013
PT. Proserv (Formerly PT. Petrotech Batam )
As Commissioning Engineer
Project Completed :
BG India, Hydra Project, PK & SWP Wellhead Control Panel
BG India, Hydra Project, PK & SWP Chemical Injection Metering Panel
Cuulong Vietnam, Su Tu Den Project, Wellhead Control Panel
PTT EP Thailand, Northern Arthit Project, Wellhead Control Panel
Chevron Thailand Project, Phase-36, Wellhead Control Panel (6 )
Chevron Thailand Project, Phase-37, Wellhead Control Panel
Years 2006 – 2010
PT. Petrotech Batam
As Service Engineer
Project Completed :
Cuulong Vietnam, Su Tu Vang Project, Wellhead Control Panel
PCSB, BK-C Instrument Control Panel
PCSB, J4 Development Project, Wellhead Control Panel
PTT EP, Bongkot Phase 3F Field Project, Wellhead Control Panel
Chevron Thailand Project, Phase-29 Wellhead Control Panels
Nucoastal Thailand, Wellhead Control Panel
Chevron Thailand Project, Phase-30 Wellhead Control Panels
Pearl Thailand, Jasmine-D Project, Wellhead Control Panel
Pearl Thailand, Ban Yen-A Project, Wellhead Control Panel
PCSB, PC4 Gas Field Proj, Wellhead Control Panel
Chevron Thailand Project, Phase-31, Wellhead Control Panel (4)
Total Indonesie, Sisi Nubi Project, Chemical Injection Skid
PCSB, Bunga Tulip-A, Wellhead Control Panel
PCSB, Duyung Proj. Wellhead Control Panel
Chevron Thailand Project, Phase-33 Wellhead Control Panel (4)
Murphy Malaysia, GOPA, GOPB, SEPA & MEPA, Wellhead Control Panel
Aramco Saudi Arabia, ESD Conversion Skid
PCSB, PC4 Project, Wellhead Control Panel
PTT EP Thailand, Bongkot Proj, WPS1,WPS2, WPS3, WPS4, WPS5, WPS6, WP23, WP24 & WP25 Wellhead Control Panel (9)
Chevron Thailand Project, Phase-35, Wellhead Control Panel (4 )
Years 2004 - 2005
PT. Petrotech Batam
As Senior Electrical Technician / tubing technicians
Project Completed :
Unocal Thailand, Phase 26 Proj. Wellhead Control Panel
Lundin, BRB (32 Well Slot) Project Wellhead Control Panel
Total Indonesia, Sisi Nubi Project, Wellhead Control Panel, Hyd. Power Unit
Pearl Thailand, Pearl-C Project, Wellhead Control Panel
Exxon Mobil, Tapis-F Gas Project, Hydraulic Power Unit
Aramco Saudi Arabia, ESD Conversion Skid
Unocal Thailand Project, Phase-27 Wellhead Control Panels
Years 2003 - 2004
PT. Petrotech Batam
As Electrical Technician/Tubing Helper
Project Completed :
Conoco Philips, Belanak FPSO, Electrical, Installation & Hook Up
PTT EP Thailand, WP-13 Bongkot Project,Wellhead Control Panel
Unocal Thailand, Phase 23 Proj. Wellhead Control Panel (12Well)
Conoco Philips, Belida Fab. Work (B), Electrical, Installation & Hook Up
Conoco Philips, Belida Fab. Work (B), Chemical Injection Panel
Total Indonesia, Peciko Phase 3 SWPG, Wellhead Control Panel & hydraulic
System ( 12 Well Module )
Petro China, Tanjung Jabung, Instrument Electrical & Hook-up
Course/Training Attended
No
Date Training
Description
Location
1
03 February 2003
Basic Pneumatic / Hydraulic Instrument Training
Batam,Indonesia
2
19 - 21 Sept 2005
Safety Training at Construction and Industry Safety
Training Centre SDN BHD, KL,Malaysia
Cert. No : B/5511/16045
3
12 -14 Nov 2008
Basic Offshore Safety Induction and Emergency Training Including additional OLF Modules (OPITO Approved)
Johor Port MSTS Asia, Malaysia
Cert no : 036343
4
09 October 2009
Basic Hydrogen Sulphide Training
Johor Port MSTS Asia, Malaysia
Cert. No : 047920
5
23 September 2013
ISO 140001 awareness Completed
Proserv Batam Cert.no :
PROV/HR/TRC/13/09/380
6
March 2013
OPITO BOSIET training
Johor Port MSTS Asia, Malaysia
7
12 .04.2013 -16.04.2017
OPITO trainning HUET
Johor Port MSTS Asia, Malaysia Log Cert. No :
00645700170413627007
8
5 August 2013
Internal Auditor for Integrated Management System (9001, 18001, 14001)
Proserv Batam, Reference No : QHSE/IMS I A /01/2013
Cert. No : PROV/QHSE/TRC/2013/07
9
12 Dec 2013
IOSH trainning
KBA singapore
Cert. No : 149250
10
21 March 2015
Pressure Testing Level 1 - Completed
FMCTI CBT Cresent E-learning
11
23 March 2015
Pressure Testing Level 2 - Completed
FMCTI CBT Cresent E-learning
12
28 February 2015
Back Safety Training HSE -Completed
FMCTI - CBT
13
22 February 2015
Foreign Corrupt Practices Act With UK Bribery summary –Completed
FMCTI - CBT
14
04 Oct 2013
Spillage Handling and Demonstration to use Oil asorbent – 3M
Indonesia, Cert No : PROV/HR/TRC/13/10/392
15
02 Oct 2013
ISO awarness 17020
Indonesia, Cert. No : PROV/HR/TRC/13/10/385
16
25 Sept 2013
Safety Commitee for Fisrt Aid Kit
Indonesia, Ref No: 0173EBK-LAT/IX/2013
17
31 May 2013
Attended Lean Basic Training
Indonesia, Cert. No :
PROV/HR/TRC/13/07/199
Personal
1.Familiar with Pneumatic and Hydraulic ( HPU and WHCP)
2.Good english skill.
3.Team Player .
4.Computer excel,word Outlook, draft sight
Data Information:
Passport Expiry Date : 04 Oct 2018
HUET OPITO offshore Expired Date : 16 April 2017
Medical Due Date with Oil and Gas UK Pin No : OGUK/2010/1598 : 22 Oct 2015 – 22 Oct 2017