Post Job Free
Sign in

finishing mason

Location:
Philippines
Posted:
March 12, 2017

Contact this candidate

Resume:

RESUME

Position applied: Finishing Mason

(Tiles Setter, Block Layer, Plasterring, Painter, Carpenter, Structural welder and Pipefitter.

Duties and Responsibilities:

•Responsible for smoothing out, leveling and finishing freshly poured concrete at the job or construction site.

•Smooth out concrete in segment to ensure the concrete poured is level.

•Fill roadways, driveway, sidewalks, bridges, homes and parking lots.

•Arrange the concrete forms.

•Spread concrete

•Prepare with hammer and chose.

•Rub cement in with sponge-rubber float burlap

•Level it using special blades, making sure all lumps and bubbles are smoothed over

•Use wood or plastic forms to shape the concrete and hold it until it is set

•Smooth high spots and fill depressions

•Make concrete beams, columns and panels

•Wash away excess concrete

•Finish corner by hand

•Apply latex and epoxy to floors

•Use machine that vibrate concrete to fill air pockets

•Use groovers and hand towels to spread concrete

•Halt concrete pouring if weather looks bad

•Prepare the base

•Cut pavers

•Install masonry according to specifications

•Pour sand is as filter

•Use chemical additives to speed up drying process if necessary

EMPLOYMENT RECORD

Kingdom of Saudi Arabia

Al Takamol And Al Hadith Cont. Co.

Projects Involved:

Project : Plastic Factory (GCAT Geomembrane Plastic Line)

Position : Mason

Client : GCAT

Owner : GCAT

Dammam, 2nd Industrial City, Kingdom Of Saudi Arabia

Covered date: November 10, 2014 to July 8, 2016

Kingdom of Saudi Arabia

Mohammad Al-Mojil Group

P.O Box 11, Dammam – 31411 KSA

Projects Involved:

Project : RABEC 2X660MW Independent Plant Project

Position : Mason

Company : Mohammad Al-Mojil Group

Client : SEPCO Electric Power Corporation

Owner : Rabigh 21911 K.S.A

Covered date: January 11, 2011 to December 29, 2012

Project : JAPAN GAS CORPORATION

Position : Mason

Company : Mohammad Al-Mojil Group

Client : JAPAN GAS CORPORATION

Owner : Worley Parsons

Jubail Industrial City, K.S.A

Covered date: April 15, 2010 to June 1, 2011

Project : SASRIEF GAS PLANT

Position : Mason

Company : Mohammad Al-Mojil Group

Client : CBI

Owner : SASREIF

Jubail Industrial City, K.S.A

Covered date: November 6, 2009 to April 10, 2010

Project : ARAMCO GAS PLANT

Position : Mason

Client : SAIPEM

Owner : SAIPEM

Aindar, Kingdom of Saudi Arabia

Covered date: July 10, 2008 to November 4, 2009

Project : SHARK GAS PLANT

Position : Mason

Client : Mohammad Al-Mojil Group

Owner : Samsung Engineering

Jubail, Industrial City, Kingdom Of Saudi Arabia

Covered date: June 20, 2006 to April 3, 2008

EDUCATIONAL ATTAINMENT:

College : Central Luzon Institute of Technology

San Fernando, Pampanga

Course : Master Cutter

Secondary ; Jose Abad Santos High School

San Fenando, Pampanga

Elementary : Bacolor Elementary School

Pampanga

REFERENCES:

•References will be provided upon request

Personal data:

Date of birth : April 15, 1970

Birth place : San Vicente Bacolor, Pampanga

Age : 46 Years old

Religion : Roman Catholic

Height : 5’9”

Weight : 130lbs.

This is to certify that the information above is true and correct upon my knowledge and belief.

ROBERTO S. PAGCU Applicant



Contact this candidate