AVINASH KUMAR SINGH +91-943*******
Male ** *****************@*****.***
CAREER OBJECTIVE
To succeed in an environment of growth and excellence and earn a job which provides me satisfaction, Self-development and helps me to achieve personal as well as organizational goals. Working Experience: 2 Yr 6 Months
1. Designated as Shift In-charge (Hot Rolling Mill Utility Operation & Maintenance) with Ion Exchange India Ltd at Tata Steel Ltd Kalinganagar Jajpur, Odisha 2. Worked in M/S UNITECH -an Authorized Dealer and Service Partner of Mather and Platt Pumps Ltd as a Site Engineer in TATA KPO Odisha from July’2014 to Oct’2015. Job Profile:
WORK PROFILE:-
1. Handling Shift.
2. Instant attending to break down maintenance during shift duty. 3. Preventive maintenance as per Preventive Maintenance Schedule. 4. Attend to the schedule of shutdown maintenance and rectify the problems in consultation with Sr. Staff. 5. Identification and preparation of spare assemblies and maintain min. stock 6. Maintain all drawings and tools etc.
7. To get advice from Sr. Staff when required.
8. To keep the stand by equipment in healthy condition. OPERATION & MAINTENANCE:-
1. Evaluation of root cause of break downs in order to avoid reoccurrence increase MTBF (Mean Time between Failures), reduction in MTTR (Mean Time to Repair), and reduction in maintenance cost. 2. Taking Care of preventive maintenance 0f all Pumps, Cooling Tower, Thickener, HRF Filters, Air Compressor or Blower, Oil Skimmer, Scrapper, Grab Bucket Crane, Gear Box Valves etc...Control room operations using HMI.
3. Coordination with various departments for smooth working. 4. Core experiences gained are managerial skills, Skill enhancement capability of local contractors and workers. Effective spares management, Method improvements, set up time reduction Involved in site execution of pump erection, alignment, fitment and maintenance of MATHER & PLATT LTD pumps. 5. Trouble shooting, monitoring checklist, Preventive maintenance, overhauling and alignment of all types of pumps.
6. Trouble shooting, monitoring checklist, general checking & oil replacement, Preventive maintenance and maintenance of suction & discharge valve, silencer, suction filter etc of Blower. 7. Nozzle replacement, General checking fan gear, Nozzle & Plate replacement of Cooling Tower. 8. Seal replacement, Gland packing and all total Servicing of Valves (Butterfly, Gate, Globe, Diaphragm, Ball valves).
9. Changing Backlash checking Gear boxes of Gear Box ( Worm reduction gear boxes, Bevel gear boxes, spur gear Box)
PROJECT WORK:-
1. Carried out erection and commissioning job of Centrifugal pumps of capacity ranging from 10m3/hr- 4300m3/hr including both split casing and vertical pumps. 2. Preparation of As-built drawings for pipe lines. 3. Hydro testing of pipeline & station piping.
4. Inspecting material before erecting the line in initial stage. 5. Loop identification from P&ID and instrument loop diagram. 6. Hand over procedure to client team up to their satisfaction level. 7. Coordination with various departments for smooth working. 8. Core experiences gained are managerial skills, Skill enhancement capability. Method improvements set up time reduction.
9. Condition Based Monitoring of equipment.
10. Mechanical seal installation and repair of centrifugal pumps. 11. Daily and monthly report generation.
12. Look into spare requirements of client and make arrangements to get them delivered at site. EDUCATION:
ACADEMIC PROJECTS:
SUMMER TRAINING
TRAINING CENTRE TRAINING DURATION
NTPC, KAHALGAON VOCATIONAL TRAINING 01 July 2013 to 28 July 2013 I_CAD CAM Software Solutions,
Kanpur
Summer Training on
“Pro-E Wild Fire 5.0”
20june 2012 to 20july 2012
KIT,KANPUR Summer training on making of
“TRAFFIC BARRIER”
20June2012 to20 July 2012
SAE –KIT AUTOMOBILE & VEHICLE
DYNAMICS Two Days
YEAR DEGREE INSTITUTE/SCHOOL PERCENTAGE BOARD/UNIVERSITY 2014 B.Tech Kanpur institute of technology, Kanpur 70.88 UPTU, Lucknow
2009 Class XII T.N.B College, Bhagalpur 66.66
BIHAR BOARD
2007 Class X Ganpat Singh high school, Kahalgaon 80.20 BIHAR BOARD
PROJECT OBJECTIVE Apparatus used
AIR LIFT PUMP
1. Air lift pump is a fluid machine which is used to rise the head of fluid due to density difference between pure fluid and air-fluid mixture.
2. No moving part and less maintenance.
3. Mostly used for archeological research in the sea. 4. Used in petroleum field and some hazardous liquid field
Arc welding
Air compressor
Nozzle
Non return valve
Power cut saw
PRESENTATION:
Presentation on Thermal Power Plant during 6th semester ACHIEVEMENTS:
1. School Topper in the year 2007 in 10th examination. 2. Got Merit Scholarship by Govt. of Bihar for duration for the year 2007-2009 POSITION OF RESPONSIBILITY
POSITION DESCRIPTION
Technical Member in ”Yantrikians”12 Conceptualized and Organized Robotics, Junkyard
& achieved huge participation.
PERSONAL:
Father’s Name : Mr. Bal Mukund Singh
Date of Birth : December 03, 1992
Residential Address : Village+ Post-Kalgiganj
Dist.-Bhagalpur (BIHAR), Pin:-813203
Hobbies : Net surfing, Playing Cricket, Watching Movie Languages Known : Hindi and English
Nationality : Indian
DECLARATION
I hereby declare that the above information and particulars are true and correct to the best of my personal knowledge and belief.
Date: 16/1/2016
Place: (Avinash Kr. Singh)