Post Job Free

Resume

Sign in

Mechanical Engineer

Location:
Salem, OR
Salary:
60,000
Posted:
March 03, 2017

Contact this candidate

Resume:

Jordan H. Walrath, E.I.T.

Engineer (Mechanical)

Jordan Walrath is seeking a position as a mechanical engineer. Jordan’s past role with previous employers has not only exposed him to mechanical design but also provided him with the invaluable experience needed to be successful. Jordan is a proven successful high-energy individual that will create an environment of customer satisfaction while performing with the highest of integrity.

Contact Information

acy3y2@r.postjobfree.com

253-***-****

www.linkedin.com/in/jordanwalrathEI

Key Expertise

CAD and FEA in SolidWorks

Piping Design

Mechanical design

Bid Specifications & Drawings

Field Engineering

Project Coordination

Procuring Specifications, SDRs, RFPs, bid reviews, and other technical documents

Hydro Energy Feasibility Analysis, Energy Modeling

Gates & Water Control Design

References

Michael Parker, PE

Mechanical Engineer for Kleinschmidt

Portland, OR

503-***-****

Nuria Claudio

Regulatory Specialist for Kleinschmidt

Portland, OR

1-503-***-****

Kim Hansen, PE

Senior Civil Engineer for Kleinschmidt

Fitchburg, WI

608-***-****

Matt Dunlap, PE

Mechanical Engineer for Kleinschmidt

Strasburg, PA

717-***-****

Bret Hoffman, PE

Mechanical Engineer for Kleinschmidt

Lexington, SC

803-***-****

Rob Rich

V.P. of Marine Services for Shaver Transportaion and President of the Columbia Towboat Association

503-***-****

Dave Bender

CEO of Arrowhead Products

Los Alamitos, CA

253-***-****

EDUCATION

B.S. in Mechanical Engineering, University of Washington, 2015

PROFESSIONAL REGISTRATION

Engineering in Training, OR 2016

WORK EXPERIENCE AND PROJECT EXPERIENCE

Kleinschmidt Associates – Staff Engineer September 2015-January 2017

Portland, OR

Downstream Fish Passage, Tobique Narrows Generating Station

New Brunswick Power Corporation, Fredericton, NB

Developed base conceptual designs for a fish crowder (fish sorting) system

Performed chain drive and motor power calculations to determine gearmotor sizing necessary to translate and rotate crowder machinery

Designed the crowder gate to operate through five distinct motions of translation and rotation within an oval shaped holding tank

Accomplished project goal to move fish to an adjacent tank safely, efficiently, and effectively

Roof Feasibility Study, Robert H. Saunders Generating Station-Robert Moses Power Dam, Ontario Power Generation and New York Power Authority, Cornwall, ON

Determined cost estimates based on labor and material costs using RS Means to install ducting and ventilation components

Developed base conceptual designs for a new roof covering the entire span of the dam

Performed HVAC calculations and determined the quantity and sizing of ventilation components needed for the new enclosure

Contributed in creating a CAD model to present the visual location of all new roofing and ventilation items along the dam to our client

HDPE Penstock Replacement Design, Kalaheo Hydroelectric Project

McBryde Resources, Eleele, HI

Contributed to creating the design drawings of an HDPE penstock for the replacement of an existing steel penstock

Performed pressure and loading calculations for expansion joints, thrust blocks, PRV’s, and penstock saddle supports

Used Solidworks to perform FEA analysis for internal pipe pressure

Penstock Repair Design, Prospect Penstock

PacificCorp, Prospect, OR

Developed design repair drawings of a 1,200 ft penstock

Performed internal pipe pressure calculations in accordance with the ASME Boiler Code

Prepared a supporting design report (SDR) and quality control and inspection plan (QCIP)

Spillway Gate Installation, Willamette Falls Hydro Power Plant

Portland General Electric, Portland, OR

Developed the base conceptual designs for the layout of Obermeyer supplied equipment

Created a Process and Instrumentation Diagram (P&ID) for the air piping and conduit routing from the control building to each bay along the spillway

Performed air pressure and flow calculations to determine the full open from close time for each Obermeyer flashboard along the spillway

Provided space-conditioning design for equipment in the control building to address PGE’s plans for equipment installation, access, and use

Performed heating and ventilation calculations for the control building to determine the required insulation and sizing of fans and louvers needed

Sluice Gate Seal Design, Byllesby Hydroelectric Project

Dakota County Environmental Resources, Apple Valley, MN

Developed the base conceptual designs for the replacement seal for a dam sluice gate

Provided field engineering services and was the on-site engineer for the installation of the intake bulkhead and gate seal refurbishment

Tacoma Power – Internship June 2015-September 2015

Tacoma, WA

Turbine Generator Efficiency Studies, Multiple Hydroelectric Powerhouse Facilities

Tacoma Power, Tacoma, WA

Developed turbine generator efficiency charts for several hydroelectric powerhouse facilities

Created a report for cavitation repair on a Francis turbine runner.