NAME : ROIKA WONGKAR
MARITAL STATUS : Married
HOME ADDRESS : Perum. Bukit Indah Karimun Blok C.8 Lubuk Semut
Tanjung Balai Karimun - Kepri – Indonesia
PASSPORT NO. : A 3591655
MOBILE NO. : +628**********
EMAIL ADDRESS : *****.**@*****.***
SKYPE ID : roi.awi
Within 7 Years Experiences In Oil & gas, Piping, Structural, and Ship Building & Mining Have Good Knowledge of Preparing And Reviewing Procedures, Welding Process, Welding Standards, Codes And Specifications, Material Controller, Non Destructive Examining And The Process Fabrication, Erection and Installation, Precomissioning - Onshore and Offshore Constractions. Supporting fair Communication in English, Computer Skill (Ms.Project,Ms.Word,Ms.Excel &AutoCad)
Certificate : Welding Inspector CSWIP 3.1 – By The Welding Institute.uk
Cert No. (67011) Date of expiry: 16 July 2017
Certificate : BOSIET & TSbB, Cert.No : 939257071409132775
Basic Offshore Safety Induction & Emergency Training and Travel Safely by Boat approval OPITO Conducted by M&O Indonesia
Certificate : Welding Inspector (WI) Level II from IKBAL-M-YOS BATAM,
Cooperate with General Directorate Oil and Gas (MIGAS) Indonesia, DISNAKER and APITINDO. Cert No.708/wi-xxvi/x/2011
Certificate : ULTRASONIC TESTING Level II According to ASNT-TC-1A
Cert No. 1619/UT-II/SKB/2012 Date of expiry: 17 February 2017
Certificate : Radiographic Interpreter (RI) Level II RTC TESTING AND
DIAGNOSTIC According to EN473/ISO9712, Cert No. 077**-****-**
Certificate : MT and PT Level II According to ASNT-TC-1A
Cert No.885/ MT/N/13 and 848/PT/N/13 Date of expiry: 04 April 2018
Certificate : Radiographic Interpreter (RI) PCN Level II
Cert No.319524 on 31 MARCH 2016, By BI NDT
Education : Diploma Naval Architech – Diponegoro University
Other : Ms Office (Ms Excel, Ms Word & Ms.Project ), AutoCad
Ensure Availability of Approved Project specification, Approved procedures, Approved Drawings, ITP before start to work at site.
Performing Inspection Before welding, during welding & after welding in accordance with inspection Checklist & reporting.
Verification of Calibration certificates of Portable quivers, holding/Baking Oven, Welding machines is in display.
Verification of welding consumable storage, Electrode baking & holding cycles as per Material consumable storage checklists.
Controlling of weld repairs by daily surveillance & weekly tool box meeting with welders & supervisors. Inspection of Repair welds in accordance with welding repair check lists.
Giving induction and training to new employee about fatigue grinding, consumable store keeper, flange management and bolt torqueing technician as per procedure and project requirement.
Inspection of Flange management activities, Bolt torqueing activities for permanent connection after hydro test.
Line check piping inspection,preparation of punch lists and ensuring mechanical completion (Cat A) of line prior to hydro test.
Performing reinstatement inspection after hydro test to ensure mechanical completion (Cat B) activities.
Issuing NCR in case of violation of procedures and Corrective and preventive measures to avoid repetition.
Communication with client, third party, Construction and Engineering for effective progress of project.
Ensure all environmental safety compliance issues are met with clients requirement.
Company : PT SAIPEM INDONESIA KARIMUN BRANCH
Location : Tanjung balai karimun,Kepri INDONESIA
Duration : DECEMBER 2014 to DECEMBER 2016
Position : QC Welding Inspector
Project : TOTAL E&P ANGOLA BLOCK 32 LTD
KAOMBO BLOCK 32 FPSO PROJECT
Company : PT SAIPEM INDONESIA KARIMUN BRANCH
Location : Tanjung balai karimun,Kepri, INDONESIA
Duration : DECEMBER 2013 to DECEMBER 2014
Position : QC Welding Inspector
Project : ARAMCO ALWASIT TIE IN PLATFORM PROJECT
Company : PT. TRIPATRA ENGINEERING
Location : BOJONEGORO,EAST JAVA INDONESIA
Duration : OCTOBER 2013 to DECEMBER 2013
Position : QC Welding Inspector
Project : EPC 2,ONSHORE PIPELINE BANYU URIP PROJECT
Company : TITIS SAMPURNA INSPECTION
Location : BATAM, INDONESIA
Duration : SEPTEMBER 2013
Position : Welding Inspector (Third Party )
Project : KKNA (Pertamina Hulu Energi )
Company : PT SAIPEM INDONESIA KARIMUN BRANCH
Location : Tanjung balai karimun,Kepri INDONESIA
Duration : DECEMBER 2012 to AUGUST 2013
Position : QC Welding Inspector
Project : GORGON PROJECT BARROW ISLAND LNG PLANT
IRAQ CRUDE OIL EXPORTEXPANSION PROJECT PHASE II ( ICOEEP )
Company : PT. ASL MARINE SHIPYARD
Location : BATAM, INDONESIA
Duration : September 2012 to November 2012
Position : QC Inspector
Project : MODIFICATION JACK UP RIG,HALCYON 1, HALCYON 2, BOSS 1
Company : PT. AUSTIN ENGINEERING INDONESIA
Location : BATAM, INDONESIA
Duration : March 2012 to September 2012
Position : QC and Engineering (Mining Industry)
Project : 20 SETS, CAT 777D AE HI-PO TRUCK BODY PT. THIESS INDONESIA
20 SETS, CAT 777D AE HI-PO TRUCK BODY PETROSEA
10 SETS, CAT 777D AE HI-PO TRUCK BODY TRAKINDO
Company : PT. NANINDAH MUTIARA SHIPYARD ( DRYDOCKS WORLD NANINDAH )
Location : BATAM, INDONESIA
Duration : December 2011 to February 2012
Position : QC Inspector
Project : FREEZER TRAWLER,T 214 ( ROBINZON, LLD)
Company : PT. PAKARTEK ENGINEERING
Location : BATAM, INDONESIA
Duration : November 2011 to December 2011
Position : Lead Visual Welding Inspector
Project : FABRICATION BARGE WESTSEA 96 & BARGE WESTSEA 72
Company : PT. NANINDAH MUTIARA SHIPYARD ( DRYDOCKS WORLD NANINDAH )
Location : BATAM, INDONESIA
Duration : December 2009 to October 2011
Position : QC Inspector
Project : SUPPLY VESSEL, T 193 ( HELLESPONT DEITY )
SUPPLY VESSEL, T 198 ( PACIFIC VIGOUR )
SUPPLY VESSEL, T 199 ( PACIFIC VULCAN )
FREEZER TRAWLER,T 214 ( ROBINZON, LLD)
Company : PT. BINTAN SHIPPING BIOTEKNIK
Location : BATAM, INDONESIA
Duration : May 2009 – October 2009
Position : Drafter Designer ( Consultant)
Project : CREW BOAT ( ALUMUNIUM VESSEL )
MV. VOC BATAVIA ( MODIFICATION PROJECT )
KM. MILLENIUM EXPRESS II (MODIFICATION PROJECT)