CURRICULUM VITAE
NAME : JACKY ANAK BARNABAS
MY ID NO : 730***-**-****
DOB : 03 APR. 1973
PLACE OF BIRTH : SONG,7 DIVISION KAPIT,SWK.[M]
SEX : MALE
RACE : SEA DAYAK [IBAN]
RELIGION : RC/CHRISTIAN
NATIONALITY : SARAWAKIAN,[M]
ADDRESS : KM 2,JALAN TAKAN,RH.BARNABAS,NANGA
KEBIAU,96850 SONG,SARAWAK [M]
EPF NO : 71291572
H/P.EMAIL : 013*******,012*******,08477741
**********@*****.***
BANK ACCOUNT NO : PUBLIC BANK,4-777****-**
MARITAL STATUS : MARRIED
NEXT OF KIN
NAME : NAWING ANAK CHANG
RELATIONSHIP : WIFE
ADDRESS : LOT 2063,S/L 149,NO.6C LORONG
BONGENVILLA TIMUR 2F,
96000 SIBU,SARAWAK.
H/P : 013-***-****,084 331083
TO: HSE- THE HUMAN RESOURCE MANAGER
DEAR SIR/MADAM
APPLICATION FOR THE POSTION MECHANICAL FITTER
OR Anysiutable Post.
I write to apply for the position of mechanical fitter with your esteemed company.
I am individual who is determined,strong willed,optimistic,result oriented and have great interest in learning.I possess excellent communication and interpersonal skills which benefit enormously in my job as site mechanical fitter,who constantly requests interaction with personnel of all levels.I have good self-disciplines and take instruction very well my superior.I also a hard-working employees,who is willing to work to extra shifts and extended hours as and when required.
For more information about my experience,please refer to my the CV attached for your perusal.Iwould be delighted if I given an opportunity to have an interview to explain in details.I can be contacted on my mobile phone:013*******,012-***-****
In summary,I am very keen to given an opportunity to work your esteemed company and look forward to hearing your favourable reply.
Thank you
JACKY ANAK BARNAB
PREVIOUS WORKING EXPERIENCE
SMDS REJUV.PROJECT 2015 SEPT-OKT.BTULU SWK [M]
COMPANY, BWS ENG. S/B TO KPG ENG.S/B MANPOWER SUPPLY TEAM
Position, Equipment TECHNICIANS and mligwright
DUTIES, Hydro Test spool by Denim water,commissioning activity,INSTALL.
New VALVE and part
- Hydraulic Blot Tensioning,Hydraulic Torgue Wreech activity,
- Assits leser Alignment,PUMP A n B New pump INSTALL by
Easy Leser E42 Moulds Equipment Tool
- Book-up,Tie-In,mechanical cleaning,wash down and maintenance
- of pipe spool,change new part
- With team work in progress and comply PTW,
MONITOR AND SUPERVISOR TO SCHEDULE TO ASSIST IN DEVELOPMENT
IN HSE RULE AND SAFE SYSTEMS PTW,TO REVIEW IN THE EFFECTIVENESS
OF THE HSE PROGRAM IN YOUR GROUP THE PROJECT SITE AND WORK
REPORT PROGRESS,
PREVIOUS WORKING EXPERIENCE
PROJECT SIMPAN MINYAK MIRI PORT SARAWAK [M] JULAI 2015
DUITES:- INSTALL NEW PUMP 2 UNITS SPLIC CASING PUMP AND PIPE JOINT ON PUMP VALVE INSTALL,PUMP A AND B.
HYDRO TEST ALL PIPE SPOOL,WASH DOWN BEFORE START UP,BOOK UP AND ROTATION WORK ACTIVITIES,AND WORK REPORT AND PROGRESS.
WORK SCHEDULE ONLY 6 WEEK IN COMPLETE,SHUTDOWN .
PREVIOUS WORKING EXPERINCE
PROJECT TRAIN 9 PETRONAS MLNG BINTULU 2014 [JGC]
COMPANY : BCS SUPPLY TO SATO KOGYO- JGC
POSITION : FOREMAN,AND PTW WORK LEADER
DUTIES : PERIMT APPLICATION,AND INSTALL REPPING
PIPE SPOOLS,INSTALL NEW PUMP,TUBING PIPE,
CIVIL WORK ACTIVITY AND PROGRESS.
AESSEAL TRAINING MECH. SEAL/ JAN.17.2014[7 mouth]
WORKSHOP AT PUCHONG,KUALA LUMPUR,SELANGOR.
STUDY AT MECHANICAL SEAL ASSEMBLE,INSTALL AND REPAIRS
LEARNING SOP MECHANICAL SEAL,REPORTS AND MAINTENANCE
INSTALL PUMP AND SEAL,ALIGNMENT SHARP NDE TO DE
PUMP TEST RUNNING BEFORE START UP,MECH.SEAL HYDRO TEST OR AIR TEST PRESSURES BY STANDARDS DETAIL OF SEAL OR
TUBING PUMP PEACK INSTALL AND TANK COOLING INSTALL BY MECHANICAL SEAL DOUBLE MECHANICAL SEAL PACE AND SINGLE SEAL PACE,INSTALL INBOARD OR OUT BOARD ON PUMP.
PRACTICE AT EYAP SABUN SDN.BHD[M] JOHOR BAHARU
NEW PUMP INSTALL AND TUBING BENDING,24 UNIT PUMP.
COM: UBF MAINTENANCE SERVICE [MPS] ADDITIONAL.
PETLIN PETRONAS KUANTAN SHUTDOWN OKT.2013
MANIOR OVERHAUL MODAL KO13 AND KO12 COMPRESSOR MOTOR
DUTIES: REMOVE OUT PIPING TUBING AND DRAIN OUT OIL BEFORE
MOVE OUT SUCTION AND DISCHARGE PIPE AT THE MOTOR
WITH OPTIONS PETLIN DUTIES ALL TIME,CLEAN OUT
MATERIAL SPOOL AND ANY MATERIAL ON COMPRESSOR.
ROTATING WORK [HBT] REMOVE OUT PART AND CHANGE
NEW PART FOLLOWING INSTRUCTION SCOPE.
1. PACKING SEAL RING INSTALLATION,RADIAL VALVE UPSTREEM
RADIAL VALVE DOWNSTREAM.
2. CYLINDER HEAD REMOVE AND INSTALL,PLUNGER REMOVE AND
INSTALL,OIL PLUNGER RING INSTALLATION.
3. INSTALL CYLINDER AT COMPRESSOR USE HBT.PROGRESS
ACTIVITIES,CONNECT PLUNGER TO CROSS HEAD.
4. TIGHTENING FIEXIBILE HOS 1st RECOVERY GAS,
COMPANY:VISTA TRADE SDN.BHD.BINTULU SWk.
MANPOWER SUPPLY SERVICE.
GABENG [BASF] PETRONAS CHEMICAL,SHUTDOWN 2013
COMPRESSOR A,AND B UNITS MAJOR OVERHAUL ACTIVITIES
DUTIES: MECHANICAL FITTER-REMOVED OUT CASING,PIPING,
WITH GE BENDERS,AND REMOVE HOCK UP IMPELLER AND
SHARP,CHECK CLEAREN WITH GE MASTERS.
BOOK UP AND MAINTENANCE OF PIPE SPOOL
SERVICE RV,CV MAINTENANCE
COMPANY:VISTA TRADE S/B. MPS- PTAS S/B.BRUNEI
PROJECT: GTG 7 SHUTDOWN BLNG BRUNEI -2013
DURATION WORK PROGRESS 15 DAY ONLY WITH GE BANDER.
DUTIES: MECHANICAL FITTER,TO ASSIST WITH TIE-IN,BOX-UP
MECHANICAL CLEANING,WASH DOWN AND
MAINTENANCE OF PIPE SPOOL,CHANGE NEW PART,
WITH TEAM WORK IN PROGRESS.
SATO KOGYO [M] SDN.BHD.- BCS MANPOWER SUPPLY
FROM: AUG 2012-MAC-3013 TOKUYAMA [M]
POSITION: MECHANICAL SUPERVISOR
DUTIES: MONITOR AND CONTROL SPOOL AND MATERIAL,INSTALL
RV,CV AND TUBING BENDING For NEW PUMP.
REPORT DAILY SCHEDULE AT WORK AND PROGRESS .
CHIYODA [M] SDN.BHD. 14th NOVEMBER,2011
PROJECT: SPEED LGAST BOOSTER COMPRESSOR
DUTIES: BCS MANPOWER SUPPLY- MONITOR AND SUPERVISOR
TEAM WORK,AND ASST SITE SUPERVISOR TO SCHEDULE.
TO ASSIST IN DEVELOPMENT IN HSE RULE AND SAFE
SYSTEM OF WORK,TO REVIEW IN THE EFFECTIVENESS OF
HSE PROGRAM IN YOUR GROUP ON THE PROJECT SITE.
REPORT AND CORRECT UNSAFE ACTS UNSAFE CONDITION
ON SITE.
SCOPE: ACTIVITY MECHANICAL FITTER And Civil work.
ADININ WORKS & ENGINEERING SDN.BHD.BRUNEI.
SHUTDOWN TRAIN 4 BLNG SERIA,APRIL 2012- AUGUST 2012
POSITION: MECHANICAL SUPERVISOR [PIPING] /FITTER
DUTIES. : MONITOR MANPOWER TO ASSIST PIPING LINE,BOX-UP,
HOCK-UP,MECHANICAL WORK,HYDRO TEST ACTIVITIES
AND MAINTENANCE,WORK REPORT RESPONSIBILITY.
RIGGING FOR LIFTING ACTIVITY WORK HANDLE.
MURPHY SARAWAK OIL,CO.LTD PROJECT 2008 BORF
POSITION: MECHANICAL & PIPING WORK OF BINTULU ONSHORE
RECEIVING FACILITY [BORF] PROJECT.
DUTIES : RIGGING,LIFTING SPOOL ON TO THE PIPELINE ON
RACKS,INSTALL RV,CV AND ACTIVITIES HYDRO TEST.
JOINT UP PIPE LINE,MECHANICAL WORK ACTIVITY.
WELFIELD SERVICES SDN.BHD./SHUTDOWN 12th Aug.2009
DUTIES: RETUBING TECHNICIANS AT MLNG 1,MODULE 1 TA
SHUTDOWN 2009 FROM 20/07/09 TO 10/O8/09
ACTIVITIES: REMOVE OUT TUBING USE SPECIAL TOOL FOLLOWING
INSTRUCTION SUPERVISOR,AND INSTALL NEW PART
TUBING,MECHANICAL WASH DOWN ACTIVITIES.
BWS-SUPPLY TO CAPTAIN ENG.SERV
PROJECT: MCOT LUTONG [MIRI SWK] TA 2008
POSITION: MECHANICAL FITTER [LEADMANW
DUTIES. : TO ASSIST WITH TIE-IN,HOCK-UP,BOX-UP,MECHANICAL
CLEANING,WASHDOWN AND MAINTENANCE PIPING
WORK ROTATING ACTIVITIES AND TEAM WORK.
PEMBENA EMAS SDN.BHD.
PROJECT: 1ST SILICON-FREE ZON KUCHING SWK,BHD.
POSITION: MPS.LEADER -CIVIL WORK #3rd JAN 2000
DUTIES. : PLASTERING,GROUTTING,SETTING WORK CIVIL AND
LEVELLING SCOP AT WORK PROGRESS.
P&TT ENTERPRIS
ABF.SDN.BHD.TA SHUTDOWN 2004
POSITION: MECHANICAL FITTER/ MILLWRIGHT
YEAR 08/05/2001 TA SHUTDOWN,MECHANICAL[P&TT]
YEAR 31s/12/1999 TA SHUTDOWN,MECH.[P&TT]