Post Job Free
Sign in

Any suitable post...

Location:
Singapore
Posted:
December 20, 2016

Contact this candidate

Resume:

CURRICULUM VITAE

NAME : JACKY ANAK BARNABAS

MY ID NO : 730***-**-****

DOB : 03 APR. 1973

PLACE OF BIRTH : SONG,7 DIVISION KAPIT,SWK.[M]

SEX : MALE

RACE : SEA DAYAK [IBAN]

RELIGION : RC/CHRISTIAN

NATIONALITY : SARAWAKIAN,[M]

ADDRESS : KM 2,JALAN TAKAN,RH.BARNABAS,NANGA

KEBIAU,96850 SONG,SARAWAK [M]

EPF NO : 71291572

H/P.EMAIL : 013*******,012*******,08477741

**********@*****.***

BANK ACCOUNT NO : PUBLIC BANK,4-777****-**

MARITAL STATUS : MARRIED

NEXT OF KIN

NAME : NAWING ANAK CHANG

RELATIONSHIP : WIFE

ADDRESS : LOT 2063,S/L 149,NO.6C LORONG

BONGENVILLA TIMUR 2F,

96000 SIBU,SARAWAK.

H/P : 013-***-****,084 331083

TO: HSE- THE HUMAN RESOURCE MANAGER

DEAR SIR/MADAM

APPLICATION FOR THE POSTION MECHANICAL FITTER

OR Anysiutable Post.

I write to apply for the position of mechanical fitter with your esteemed company.

I am individual who is determined,strong willed,optimistic,result oriented and have great interest in learning.I possess excellent communication and interpersonal skills which benefit enormously in my job as site mechanical fitter,who constantly requests interaction with personnel of all levels.I have good self-disciplines and take instruction very well my superior.I also a hard-working employees,who is willing to work to extra shifts and extended hours as and when required.

For more information about my experience,please refer to my the CV attached for your perusal.Iwould be delighted if I given an opportunity to have an interview to explain in details.I can be contacted on my mobile phone:013*******,012-***-****

In summary,I am very keen to given an opportunity to work your esteemed company and look forward to hearing your favourable reply.

Thank you

JACKY ANAK BARNAB

PREVIOUS WORKING EXPERIENCE

SMDS REJUV.PROJECT 2015 SEPT-OKT.BTULU SWK [M]

COMPANY, BWS ENG. S/B TO KPG ENG.S/B MANPOWER SUPPLY TEAM

Position, Equipment TECHNICIANS and mligwright

DUTIES, Hydro Test spool by Denim water,commissioning activity,INSTALL.

New VALVE and part

- Hydraulic Blot Tensioning,Hydraulic Torgue Wreech activity,

- Assits leser Alignment,PUMP A n B New pump INSTALL by

Easy Leser E42 Moulds Equipment Tool

- Book-up,Tie-In,mechanical cleaning,wash down and maintenance

- of pipe spool,change new part

- With team work in progress and comply PTW,

MONITOR AND SUPERVISOR TO SCHEDULE TO ASSIST IN DEVELOPMENT

IN HSE RULE AND SAFE SYSTEMS PTW,TO REVIEW IN THE EFFECTIVENESS

OF THE HSE PROGRAM IN YOUR GROUP THE PROJECT SITE AND WORK

REPORT PROGRESS,

PREVIOUS WORKING EXPERIENCE

PROJECT SIMPAN MINYAK MIRI PORT SARAWAK [M] JULAI 2015

DUITES:- INSTALL NEW PUMP 2 UNITS SPLIC CASING PUMP AND PIPE JOINT ON PUMP VALVE INSTALL,PUMP A AND B.

HYDRO TEST ALL PIPE SPOOL,WASH DOWN BEFORE START UP,BOOK UP AND ROTATION WORK ACTIVITIES,AND WORK REPORT AND PROGRESS.

WORK SCHEDULE ONLY 6 WEEK IN COMPLETE,SHUTDOWN .

PREVIOUS WORKING EXPERINCE

PROJECT TRAIN 9 PETRONAS MLNG BINTULU 2014 [JGC]

COMPANY : BCS SUPPLY TO SATO KOGYO- JGC

POSITION : FOREMAN,AND PTW WORK LEADER

DUTIES : PERIMT APPLICATION,AND INSTALL REPPING

PIPE SPOOLS,INSTALL NEW PUMP,TUBING PIPE,

CIVIL WORK ACTIVITY AND PROGRESS.

AESSEAL TRAINING MECH. SEAL/ JAN.17.2014[7 mouth]

WORKSHOP AT PUCHONG,KUALA LUMPUR,SELANGOR.

STUDY AT MECHANICAL SEAL ASSEMBLE,INSTALL AND REPAIRS

LEARNING SOP MECHANICAL SEAL,REPORTS AND MAINTENANCE

INSTALL PUMP AND SEAL,ALIGNMENT SHARP NDE TO DE

PUMP TEST RUNNING BEFORE START UP,MECH.SEAL HYDRO TEST OR AIR TEST PRESSURES BY STANDARDS DETAIL OF SEAL OR

TUBING PUMP PEACK INSTALL AND TANK COOLING INSTALL BY MECHANICAL SEAL DOUBLE MECHANICAL SEAL PACE AND SINGLE SEAL PACE,INSTALL INBOARD OR OUT BOARD ON PUMP.

PRACTICE AT EYAP SABUN SDN.BHD[M] JOHOR BAHARU

NEW PUMP INSTALL AND TUBING BENDING,24 UNIT PUMP.

COM: UBF MAINTENANCE SERVICE [MPS] ADDITIONAL.

PETLIN PETRONAS KUANTAN SHUTDOWN OKT.2013

MANIOR OVERHAUL MODAL KO13 AND KO12 COMPRESSOR MOTOR

DUTIES: REMOVE OUT PIPING TUBING AND DRAIN OUT OIL BEFORE

MOVE OUT SUCTION AND DISCHARGE PIPE AT THE MOTOR

WITH OPTIONS PETLIN DUTIES ALL TIME,CLEAN OUT

MATERIAL SPOOL AND ANY MATERIAL ON COMPRESSOR.

ROTATING WORK [HBT] REMOVE OUT PART AND CHANGE

NEW PART FOLLOWING INSTRUCTION SCOPE.

1. PACKING SEAL RING INSTALLATION,RADIAL VALVE UPSTREEM

RADIAL VALVE DOWNSTREAM.

2. CYLINDER HEAD REMOVE AND INSTALL,PLUNGER REMOVE AND

INSTALL,OIL PLUNGER RING INSTALLATION.

3. INSTALL CYLINDER AT COMPRESSOR USE HBT.PROGRESS

ACTIVITIES,CONNECT PLUNGER TO CROSS HEAD.

4. TIGHTENING FIEXIBILE HOS 1st RECOVERY GAS,

COMPANY:VISTA TRADE SDN.BHD.BINTULU SWk.

MANPOWER SUPPLY SERVICE.

GABENG [BASF] PETRONAS CHEMICAL,SHUTDOWN 2013

COMPRESSOR A,AND B UNITS MAJOR OVERHAUL ACTIVITIES

DUTIES: MECHANICAL FITTER-REMOVED OUT CASING,PIPING,

WITH GE BENDERS,AND REMOVE HOCK UP IMPELLER AND

SHARP,CHECK CLEAREN WITH GE MASTERS.

BOOK UP AND MAINTENANCE OF PIPE SPOOL

SERVICE RV,CV MAINTENANCE

COMPANY:VISTA TRADE S/B. MPS- PTAS S/B.BRUNEI

PROJECT: GTG 7 SHUTDOWN BLNG BRUNEI -2013

DURATION WORK PROGRESS 15 DAY ONLY WITH GE BANDER.

DUTIES: MECHANICAL FITTER,TO ASSIST WITH TIE-IN,BOX-UP

MECHANICAL CLEANING,WASH DOWN AND

MAINTENANCE OF PIPE SPOOL,CHANGE NEW PART,

WITH TEAM WORK IN PROGRESS.

SATO KOGYO [M] SDN.BHD.- BCS MANPOWER SUPPLY

FROM: AUG 2012-MAC-3013 TOKUYAMA [M]

POSITION: MECHANICAL SUPERVISOR

DUTIES: MONITOR AND CONTROL SPOOL AND MATERIAL,INSTALL

RV,CV AND TUBING BENDING For NEW PUMP.

REPORT DAILY SCHEDULE AT WORK AND PROGRESS .

CHIYODA [M] SDN.BHD. 14th NOVEMBER,2011

PROJECT: SPEED LGAST BOOSTER COMPRESSOR

DUTIES: BCS MANPOWER SUPPLY- MONITOR AND SUPERVISOR

TEAM WORK,AND ASST SITE SUPERVISOR TO SCHEDULE.

TO ASSIST IN DEVELOPMENT IN HSE RULE AND SAFE

SYSTEM OF WORK,TO REVIEW IN THE EFFECTIVENESS OF

HSE PROGRAM IN YOUR GROUP ON THE PROJECT SITE.

REPORT AND CORRECT UNSAFE ACTS UNSAFE CONDITION

ON SITE.

SCOPE: ACTIVITY MECHANICAL FITTER And Civil work.

ADININ WORKS & ENGINEERING SDN.BHD.BRUNEI.

SHUTDOWN TRAIN 4 BLNG SERIA,APRIL 2012- AUGUST 2012

POSITION: MECHANICAL SUPERVISOR [PIPING] /FITTER

DUTIES. : MONITOR MANPOWER TO ASSIST PIPING LINE,BOX-UP,

HOCK-UP,MECHANICAL WORK,HYDRO TEST ACTIVITIES

AND MAINTENANCE,WORK REPORT RESPONSIBILITY.

RIGGING FOR LIFTING ACTIVITY WORK HANDLE.

MURPHY SARAWAK OIL,CO.LTD PROJECT 2008 BORF

POSITION: MECHANICAL & PIPING WORK OF BINTULU ONSHORE

RECEIVING FACILITY [BORF] PROJECT.

DUTIES : RIGGING,LIFTING SPOOL ON TO THE PIPELINE ON

RACKS,INSTALL RV,CV AND ACTIVITIES HYDRO TEST.

JOINT UP PIPE LINE,MECHANICAL WORK ACTIVITY.

WELFIELD SERVICES SDN.BHD./SHUTDOWN 12th Aug.2009

DUTIES: RETUBING TECHNICIANS AT MLNG 1,MODULE 1 TA

SHUTDOWN 2009 FROM 20/07/09 TO 10/O8/09

ACTIVITIES: REMOVE OUT TUBING USE SPECIAL TOOL FOLLOWING

INSTRUCTION SUPERVISOR,AND INSTALL NEW PART

TUBING,MECHANICAL WASH DOWN ACTIVITIES.

BWS-SUPPLY TO CAPTAIN ENG.SERV

PROJECT: MCOT LUTONG [MIRI SWK] TA 2008

POSITION: MECHANICAL FITTER [LEADMANW

DUTIES. : TO ASSIST WITH TIE-IN,HOCK-UP,BOX-UP,MECHANICAL

CLEANING,WASHDOWN AND MAINTENANCE PIPING

WORK ROTATING ACTIVITIES AND TEAM WORK.

PEMBENA EMAS SDN.BHD.

PROJECT: 1ST SILICON-FREE ZON KUCHING SWK,BHD.

POSITION: MPS.LEADER -CIVIL WORK #3rd JAN 2000

DUTIES. : PLASTERING,GROUTTING,SETTING WORK CIVIL AND

LEVELLING SCOP AT WORK PROGRESS.

P&TT ENTERPRIS

ABF.SDN.BHD.TA SHUTDOWN 2004

POSITION: MECHANICAL FITTER/ MILLWRIGHT

YEAR 08/05/2001 TA SHUTDOWN,MECHANICAL[P&TT]

YEAR 31s/12/1999 TA SHUTDOWN,MECH.[P&TT]



Contact this candidate