MANI PANDIAN R
**C,**/*,Muthu Nagar Sengunthapuram Post,Karur – 639002
Phone: 989-***-****; Email:acxuz9@r.postjobfree.com
OBJECTIVE
To obtain a challenging position in the domain of mechanical design that will provide me an opportunity to perform and excel in goal oriented environments and a growth path for career development
PROFILE
Competent, adroit & detail-oriented professional, with excellent educational background, academically proficient with Bachelor of Engineering specializing in Electronics & Communication, preceded by Diploma in Electronics & Communication; with in-depth understanding of technical and analytical technologies of the company.
Possess 3+ years of experience as an Site Engineer in Erection of MMS Structure and Erection of Module in Adani Solar Power Plant, Kamuthi and Instrumentation and control Engineer in Construction, commissioning and Maintenance of instruments and control systems in Thermal Power Plant and Simple Cycle power plant.
A stickler for quality, tem builders to the core and a natural motivator with perseverance and integrity.
A good analytical mind with willingness and ability to quickly learn new technologies.
Enriched with the latest trends and techniques and a wide range of skill in Project Management, Technology, Critical Thinking, Troubleshooting, Problem Analysis and Resolution.
Successfully completed industrial trainings with “Prasar Bharathi(Broadcasting Corporation of India),Under Doordarshan Maintenance Centre,Tiruchirapalli(1 month) and technically proficient with Windows;, MS Office & Internet Applications.
TECHNICAL EXPERTISE
Distributed Control Systems : ABB-AC800F
INVENSYS-FCP 270
Engineering tools : ABB-Control builder-F, V-7.1
Invensys-Foxboro IACC, V-2.3.1
Graphics : ABB Freelance 2000 Digivis, V-7.1
Invensys-Fox view, V-10.2.2
Operating Systems : Windows 7, Windows XP
WORK EXPERIENCE
Present Employer:
Employer : M/S Hofincons InfoTech and Industrial Services
Client : Adani Infra India Private Limited
Plant Capacity : 648MW
Role : Site Engineer
Duration of work : January 2015 to till date
Core Responsibilities:
Erection of MMS Structural Work and erection of Module .
Co-ordination with client and consultant, preparing protocols for fabrication erection & commissioning.
Preparing material requirement as per fabrication plan
Preparing of monthly erection plan
Manpower handling and stage inspection of structures at site
Certifying the sub-contractors bills and coordinating for preparing the client bills
Responsible for the implementation of safety standards at the project site by ensuring that all relevant norm are employed effectively
Previous Employer:
Employer : M/S Hofincons InfoTech and Industrial Services
Client : Chettinad cements-Karikkali
Plant Capacity : 2 X 30 MW (2 X130 TPH), 1 X15MW (1 X 60 TPH)
Role : Assistant Engineer-Instrumentation& Control Engineer
Duration of work : January 2014 to December 2014
Core Responsibilities:
Direct and perform testing of control systems for optimum performance
Develop procedures and for in the periodic calibration, testing and maintenance of test equipments
Preparing shutdown job plans for boiler and turbine related instruments and executing it, handling of Computerized Maintenance Management System (CMMS)
Preparing and maintaining of ISO files and Safety related documents
Good knowledge in handling master calibrating instruments like Hart Field Bus 375Communicator,Fluke Calibrators, Druck calibrators and Temperature calibrator.
Having good knowledge in Maintenance and calibration of pressure, temperature, flow and level instruments.
Maintenance of DCS systems and IO Panels
Maintaining Root cause analysis and Software modification documents
Calibration and troubleshooting of analytical instruments.
Verifying and modifying supplier’s nest loading documents, system cable schedules, JB wiring diagrams and system configuration drawing.
Maintenance of Control Valves, Transmitters and analyzers.
Preparing Punch list and updating as built document along with suppliers
Installation and calibration of pneumatic control valves and motorized valve.
Preparation of RCA Report and JSA (Job Safety Analysis) Report.
Preparation of the work Permits And other relevant Documents for doing the job
Co-ordinate with the safety department to arrange the relevant trainings for the working crew.
Erection and commissioning of Pull Chord switch, belt sway switch & Zero speed Controller for belt
conveyor safety interlocks.
Cable scheduling and preparation of termination details con weigh Roto packer.
Position Tuning of Dampers according to the Process Requirement.
Calibration of Gas Analyzers – Co, O2 & Nox.
Maintenance of Opacity monitor and Sox Nox Analyzer system
Maintenance and troubleshooting of Stem water analysis systems.
Involved in Preventive Maintenance, Shut down and break down maintenance for all instruments.
Employer : Chettinad cements-Karikkali
Plant : Cement plant
Role : Supervisor (Instrumentation)
Duration of work : March 2013 to November 2013
Core Responsibilities:
Knowledge in Power Plant related maintenance activities.
Knowledge in condition based maintenance through vibration analysis of all rotating equipment.
Instruments spares maintenance and inventory control for all instruments spare parts.
Ability to troubleshoot, repair and maintain instruments and instrumentation systems
Extensive knowledge of instrument communication systems and approaches of measurement technologies
AREA OF INTEREST:
Having interest in Instrument erection and commissioning
Interest to design and develop logics to optimize the plant performance.
Very much interest to design Instrumentation system equipment that operates effectively, efficiently and in safely way.
EDUCATIONAL CREDENTIALS
Bachelor of Engineering - Electronics & Communication 2011
Anna University, Chennai 67%
Diploma in Electronics & Communication 2007
The Karur Polytechnic College, Karur 85%
Certificate in CCNA 2012
Person VUE, chennai
Certificate in Embedded Design 2007
The Karur Polytechnic College, Karur
Certificate in Printed Circuit Board 2007
The Karur Polytechnic College, Karur
Intermediate, 2004
Cheran Matri Hr Sec School 68%
PROJECT UNDERTAKEN
Controlling Boklene using Microcontroller with wireless transmission
Microcontroller based PIR security system-live Human Body Detection
Advanced roll stability control for heavy trucks using CAN & MEMS
ACHIEVEMENTS
Won first place in Circuit Debugging at SRISHITI V3.0 conducted by SSN College of Engineering
Organized the National Level Technical Symposium
Gone to many camps and social service centers
Date of Birth: 19th August 1989
Language Proficiency: English and Tamil
Passport No: H 9855219 valid till october 2020
Date:
Signature