Post Job Free
Sign in

Power Plant Project

Location:
Secunderabad, Telangana, India
Posted:
December 12, 2016

Contact this candidate

Resume:

Mr.SANTOSH KUMAR BONGONI

E-Mail: acxux3@r.postjobfree.com, acxux3@r.postjobfree.com

Mobile: 081********, 083********, 073********

AAANNN OOOVVVEEERRRVVVI IIEEEWWW

A qualified professional with 10 years of experience in the areas of : PROJECT MANAGEMENT SYSTEM & DESIGN ENGINEERING

PROJECT DETAILING & PLANNING PROJECT EXECUTION & COMMISSIONING PROJECT COORDINATION SITE /CONSTRUCTION MANAGEMENT MAN MANAGEMENT BUDGETING & CASH FLOW MANAGEMENT

Currently associated with M/s. M/s. PREDOMINANT ENGINEERS & CONTRACTORS PVT LTD as ASSISTANT PROJECT MANAGER

A strategic planner with expertise in executing projects from concept to launch with focus on project scope & rendering end to end solution.

Supervising all construction activities, providing technical inputs for methodologies of construction & coordination with site management activities.

Ensuring compliance to quality standards & maintaining all related documents OOORRRGGGAAANNNI IISSSAAATTTI IIOOONNNAAALLL SSSCCCAAANNN JULY 2012 - TILL DATE... M/s. PREDOMINANT ENGINEERS & CONTRACTORS PVT LTD, GURGAON AS ASSISTANT PROJECT MANAGER

An ISO 9001: 2000 Company

PREDOMINANT ENGINEERS & CONTRACTORS PVT LTD. is an associate of Predominant Engineers Inc. San Jose, California. U.S.A. PECL is mainly known for his Technical know-how, Engineering Consultancy Services & Executing Green Field Projects & EPC Contracts for Setting Up Integrated Steel Plant & Power Plant. Championed in the overall plant layout of a integrated steel & power plant through DRI Process including KILN, WHRB, FBB, IF/EAF, CCM & ROLLING MILL,PELLETIZING PLANT of 0.2 Million Ton per annum capacity to 1 Million Ton per annum.

Key Deliverables:

PROJECT MANAGENENT

Overseeing project activities from conceptualization to execution including finalization of technical specifications, tendering, and procurement/supply of raw materials, stage inspections, scheduling, progress monitoring and manpower planning.

Preparing schedule of project activity including manpower, resources & time and executing the project activities as per the approved schedule.

Conducting review meeting regarding milestone achievements & submitting progress report to management

Identifying project bottlenecks and undertaking corrective measures. Participating in technical & commercial comparisons, analysis of quotations, evaluation of BOQ/Budgetary costing. SYSTEM & DESIGN ENGINEERING

Preparation of Master Layout Details for Integrated Steel Plant & Power plant providing basic engineering data for the complete plant & splitting the same into various packages for execution.

Studying drawings, plans,G.A drawings, civil & structural drawings to be made or repaired as per requirement of projects.

PROJECT DETAILING & PLANNING

Making of Material Energy Balance Sheet suited to basic engineering & layout with optimum utilization of various equipments for complete steel plant.

Designing of Schematic Material Flow Diagram for the Raw Material Handling System right from truck unloading to the dispatch of the finished product.

Coded designing & detailing of columns, base plate,trestle,,shed for Pellet plant,DRI unit, Utility Power Boilers, coal handling system, ash handling system.

Detailing of structural drawings for coal shed,transfer house, coal bunkers, cladding & their supporting structure

Detail designing & drawing checking of equipment column, heat exchanger, tanks, pressure vessel.

Cost Estimation of the fabricated equipments & Preparation of enquiry documents for the project as per client requirements for approved vendors

PROJECT EXECUTION & COMMISSIONING

Planning of Implementation Schedule, Erection Schedule, & Project Progress Status using MS Project.

Actively involved in planning site schedules & activities to ensure timely project completion.

Project Monitoring & Follow up with updating progress depending on critically on daily, weekly & monthly basis.,

MAN MANAGEMENT

Leading, mentoring & monitoring the performance of Engineers, Foremen & other Technical Peoples to ensure efficiency in process operations and meeting of project targets.

Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members.

KEY PROJECTS HANDLING

CLIENT : M/s. SUPER SMELTER LTD,ASANSOL,WEST BENGAL. POSITION : ASSISTANT PROJECT MANAGER

PROJECT : 1 X 350 TPD (0.1 MTPA) SPONGE IRON PLANT (DRI – IV ) ALONG WITH MATERIAL HANDLING SYSTEM.

NOTABLE ATTAINMENTS

CLIENT : M/s. ARDENT STEELS LIMITED, KEONJHAR, ORRISA PREPARATION OF NEW EXPANSION PROJECT OF 0.6 MTPA PELLET PLANT COMPRISSING OF COMPLETE PLANT LAYOUT, GENERAL ARRANGEMENT DRAWINGS OF 0.6 MTPA PELLET PLANT WITH TENTATIVE ESTIMATION OF (BOQ & BOM) OF CIVIL WORK, STRUCTURAL WORK, EQUIPMENT & PIPE LENE PROCUREMENT & PROJECT EXECUTION FEB 2010 - JUNE 2012 M/s. HOTHUR STEELS (HOTHUR GROUP), BELLARY AS PROJECT COORDINATOR

Key Deliverables:

Monitoring the complete project functions from project initialization till project ending, through detailed engineering, planning, procurement and construction.

Reviewing and approving specifications, basis of design, equipment bid evaluations, layouts, as well as construction/installation of equipments

Supervise and reporting to higher management regarding all construction activities, including technical inputs for methodologies of construction & coordination with site management activities.

Identifying project bottlenecks and undertaking corrective measures

Assisting lead engineers for preparing process-engineering drawings, mechanical drawings, layout drawings, detailing of equipments after gathering product specifications.

Ensuring that teams adhere to all the quality tool & procedures. FEB 2007 - JAN 2010 M/s. PREDOMINANT ENGINEERS & CONTRACTORS PVT LTD, GURGAON AS SENIOR PROJECT ENGINEER

Key Deliverables:

Preparation of Master Layout Details for Integrated Steel Plant providing basic engineering data for the complete plant & splitting the same into various packages for execution.

Preparation of Specification for the complete plant / Equipments & splitting in various packages for enquiry

/ordering point of view.

Responsible for Approval of various mechanical equipments drawing related to Sponge Iron Plant, Power Plant,

& SMS as per process using various design applications.

Preparation of P & I Diagrams for the Utility system including industrial water, air & fuel oil system.

Evaluation of BOQ/Budgetary costing for the upcoming project at Paradip for POSCO E & C. KEY PROJECTS

CLIENT : M/s. JINDAL ALUMINIUM LIMITED,KOPAL,KARNATAKA Comprising of 6 X 350 TPD (0.6 MTPA) Sponge Iron Plant along with Material Handling System, 6 X38 TPH Waste Heat Recovery Boilers, 1X220 TPH Atmospheric Fluidized Bed Boiler, 1X60 MW Power Plant, 1X25 MW Power Plant,

Steel Melting Shop comprising of 8 X 15 T Induction Furnace (0.3 MTPA), 1 x 6/11, 2 strand Continuous Casting machine.

CLIENT : M/s. SREE METALIKS LTD, KEONJHAR, ORRISA

Comprising of 2 x 0.6 MTPA Pelletizing plant,

3 X 350 TPD (0.3 MTPA) Sponge Iron Plant along with Material Handling System, 3 X38 TPH Waste Heat Recovery Boilers,

1X220 TPH Atmospheric Fluidized Bed Boiler, 1X60 MW Power Plant, Steel Melting Shop comprising of 6 X 15 T Induction Furnace (0.25 MTPA), 1 x 6/11, 2 strand Continuous Casting machine.

DEC 2005 - JAN 2007 M/s. ASEA BROWN BOVERI LTD (ABB LIMITED ) Under contract From Shree Rang Services, Vadodara) AS DESIGN ENGINEER

ABB LTD. is brand name in Power & Automation Technologies that enable utility & industry customers to improve performance while lowering environmental impact. Key Deliverables:

Design & modification of existing system of HIGH VOLTAGE DISTRIBUTION SYSTEM (HVDS) networks [132KV, 33/11KV, 11KV networks (Feeders)] with the help of field survey drawing using GPS (Global Positioning System) and AutoCAD [2000i] software.

Modification & Designing of the existing system is done by providing 24 hours single-phase supply in rural areas for domestic & non-domestic consumers through single-phase system by installing 6.35kV/230 Volt distribution transformers with LT distribution system using Ariel Bunched Cable & replacing higher rating distribution transformer i.e.100kVA,63kVA (11/0.4kV),transformer catering agriculture load with 40kVA,25kVA

(11/0.4kV),transformer. The relocation of existing 40kVA, 25kVA (11/0.4kV), transformer with associated 11kV & LT lines to meet out the requirement of the system.

Valuation of proposed system is done by G-schedule i.e. Bill of Quantity (BOQ) & Bill of Material (BOM) for the work execution.

AAACCCAAADDDEEEMMMI IIAAA &&CCCRRREEEDDDEEENNNTTTI IIAAALLLSSS

BACHELOR DEGREE OF ENGINEERING in MECHANICAL ENGINEERING from Manoharbhai Patel Institute of Engineering & Technology, Gondia, MAHARASHTRA, affiliated from Nagpur University, NAGPUR, (BATCH - 2005).

DIPLOMA IN MECHANICAL ENGINEERING from Bajaj Polytechnic College, Chandrapur, MAHARASHTRA, affiliated from M.S.B.T.E Board, MUMBAI, (BATCH - 2002).

12th from Jantha college, (BATCH - 1999).

10th from Jantha college, (BATCH - 1997).

CCCOOOMMMPPPUUUTTTEEERRR SSSKKKI IILLLLLLSSS

AutoCAD 2014 : 2D, 3D drafting & Isometric Drawing, Layout & G.A Drawing.

Pro-E Wild Fire : Part Modeling, Assembling, Drafting, Pro-Sheet Metal & Pro- Manufacturing.

Operating system : WIN XP, WIN 98, MS Projects, Microsoft-Exel.. PPPEEERRRSSSOOONNNAAALLL DDDEEETTTAAAI IILLLSSS

FATHR’S NAME : Mr.B.VEERASWAMY

DATE OF BIRTH : 28th Nov.1981

SEX : MALE

MARITAL STATUS : MARRIED

LANGUAGE KNOWN : ENGLISH, HINDI, TELUGU

PERMANENT ADDRESS : WCL,Ghugus,Coloery,Ramnagar,B-type,Q.no-93. Dist :CHANDRAPUR. MAHARASHTRA-442505.

CURRENT ADDRESS : Plot no : A14/4B,SUGAM APPARTMENTS, DHAKA ROAD,ASANSOL,WEST BENGAL

Notice Period : 30 days

Passport Number : K5425150

Date of Issue : 12/07/2012

Date of Expiry : 11/07/2022

DATE : ` SIGNATURE

PLACE : (SANTOSHKUMAR.B)



Contact this candidate