Post Job Free

Resume

Sign in

Engineer Project

Location:
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
Posted:
December 06, 2016

Contact this candidate

Resume:

Khoon Hong, Charles Tay

Senior Project Engineer (1 year 4 months)

Wood Group Mustang Sdn Bhd

+60-122****** acxr5n@r.postjobfree.com USD 6500 (NEG) Cheras, Kuala Lumpur

Experience

** ***** *f total experience

Experienced and driven project management professional with expertise including communication

skilled in collaboration with all members of the organisation to achieve dateline and objectives achiever. Utilised project management principles to plan independently and judgement in solving issues.

-Create project status and monitoring system to track and monitor progress and timelines for Tapis EOR multimillion-ringgit project (one of the largest offshore EOR projects in Southeast Asia).

-Reduced document regeneration and turnaround time by 50% by designing templates that automated high document production

-Instrumental in streamlining and improving processes and reporting methods and implementing analytical solutions. Technical proficiency in MS office,

Jan 2015 - Present

(1 year 4 months )

Senior Project Engineer

Wood Group Mustang Sdn Bhd Kuala Lumpur, Malaysia

Industry

Oil / Gas / Petroleum

Specialization

Engineering - Oil/Gas

Role

Management

Position Level

Senior Executive

As senior project engineer working on ExxonMobil EPCM contract - ability to work with minimal supervision and able to manage multiple projects and meet deadlines through effective project management skills.

Piping repair project for Guntong field and Tabu field (Brownfield).

- involved in construction risk assessment and ensure accessibility for future maintenance (PDMS model review)

- Provide project management advice in respect of all construction activities

- develop and implement new budgeting models and providing new strategic planning as agreed with client

- managed all aspects of cost reporting closeout, ensuring accuracy and timely reconciliation for monthly reporting

- participate in project purchasing activities and ensure equipment / items delivery on time for plan platform shutdown

- held meeting with vendor to overcome issues and ensure no unforeseen cost incur

- assist client to reuse / recalibrate available materials from the storage/warehouse to save cost (during great depression)

Installation of portable cabin (48 POB) with consideration of removal after 2yrs.

- leading a team of discipline brain storming installation methodology and presented finding to client on the feasibility before energizing the work.

- key team leader responsible for management in numerous key area, including all aspects of construction without compromising safety

- oversaw and comprehensively managed cost needs of organisation from budgets to spending

- participate in risk review workshop ensure all risk had been considered.

- as construction coordinator liaise with contractor to ensure smooth installation

Jan 2009 - Dec 2014

(5 years 11 months )

Senior Project Engineer

Ranhill Worley Parsons Kuala Lumpur, Malaysia

Industry

Oil / Gas / Petroleum

Specialization

Engineering - Oil/Gas

Role

Project Management

Position Level

Senior Executive

TAPSI EOR and Rejuvenation Project – DETAIL DESIGN (TaR 18,000MT & TaQ 2,000 MT) (total 125,000 mhrs)

As project engineer assisting project manager on the detail design comprises of new TaR CPP platform to be installed with a bridge-connected TaQ (Riser Platform) and bridge-connected to the existing Tapis B (Bravo) platform.

Main objectives studies are:

• To monitor the weight estimates with sufficient detail for new CPP (TaR) & Riser platform (TaQ) (include compact flange).

• Produce design deliverables and specification suitable level to develop an IFP package for detailed design especially all long lead item (LLE)

TAPSI EOR and Rejuvenation Project – IFB

As project engineer assisting project manager on the IFB study comprises of new TaR CPP plat-form to be installed with a bridge-connected TaQ (Riser Platform) and bridge-connected to the ex-isting Tapis B (Bravo) platform.

Main objectives studies are:

• To provide a firm detail design for a new float over central processing platform (CPP) with provision of FWS separation, gas injection, water injection, utilities and riser platform TaQ and bridge connection to Tapis B

TAPSI EOR and Rejuvenation Project – FEED

As project engineer assisting project manager on the FEED study comprises of new TaR CPP platform to be installed with a bridge-connected to the existing Tapis B (Bravo) platform.

Main objectives studies are:

• Proposed firm optimization / preliminary design studies for a new float over central processing platform (CPP) with provision of FWS separation, gas injection, water injection and utilities and bridge connection to Tapis B.

Tapis Rejuvenation Project – facilities conceptual study

As project engineer (conceptual study). The project involves of case facilities study, equipment layout, interconnecting tie-ins to existing process line for Tapis Rejuvenation Project requirements.

Main objectives studies are:

• Proposed the most suitable economical operational philosophy and operating configuration

Telok Gas Development – facilities conceptual study

As project engineer assisting project manager on the conceptual engineering study comprises of two new un-manned minimum facilities platform require 21+ conductor slot and consider with free flow field well stream gas pipeline from Telok to Guntong E compression up to 400mscf/d gas

SAMARANG Re-development project (revisit of SMJT-F and SMDP-B) Phase 1

As project engineer assisting project manager on the detail design engineering for SAMARANG Re-development project comprises of SMJT-F and SMDP-B (phase 1). The project are split into two packages which are package 1 (SIPROD & RIG-UP) and package 2 (WELL TIE-IN & RIG-DOWN). The scope is to re-visit existing platforms (i.e. SMDP-B and SMJT-F) under SIPROD mode and blowdown scheme for Gaslift header will be implemented for SIPROD for SMDP-B. As for SMJT-F, both the Gaslift header and Production Test header will be provided with blowdown. The project involves equipment layout, interconnecting tie-ins associated to flowlines modifications, structural strengthening (deck extension) and associated electrical supports (such as temporary removal of electrical items, reinstatement of solar power and navigational marine systems) for the overall platform requirements.

Nov 2006 - Dec 2008

(2 years 1 month )

Project Engineer

CB&I SINGAPORE PTE. LTD. Singapore, Singapore

Industry

Oil / Gas / Petroleum

Specialization

Engineering - Oil/Gas

Role

Project Management

Position Level

Junior Executive

The project engineer assists the project engineering manager in co-ordinating the engineering work as shown below:

- set up the document management system

- receiver, distribute, monitor and control of design input information and the review of sellers document's

- manage and co-ordinate internal interfaces between disciplines and project services

review technical queries prior to submission to client

- ensure that comments on model reviews, construct-ability reviews, FEEEM analysis, project integrity checklist reviews and technical reviews and are incorporated in the design

- ensure that changes are highlighted for follow-up action and inputs provided to the cost engineer

- co-ordinates with planning for the preparation of the detailed engineering schedules

- co-ordinates the preparation of progress reports

- provide inputs for close-out report

- conference with client on DTSR (HAZOP)

- provide input to planning engineer on the new forecast schedule

- provide manpower loading & manhour forecast on monthly basis

Major Projects :-

- As Project Engineer for SHELL Ethylene Cracker Complex Project (Singapore)

- As Project Engineer for SHELL BDX Project (Singapore)

- As Project Engineer for FEED for Refinary Expandion atSuriname

Apr 2002 - Oct 2006

(4 years 6 months )

Project Engineer

Dialog Group Bhd.

Industry

Oil / Gas / Petroleum

Specialization

Engineering - Oil/Gas

Role

Project Management

Position Level

Junior Executive

Monthly Salary

MYR 4,800

Responsibilities :

- Prepare pre-qualification, tender documents (Costing and procedure)

- Schedule work plan and communicate with clients on progress

- Manage Daily Operation, monitor work progress in accordance with ISO 9002 standard

- Manage work site safety management, resources purchasing and allocation

- Budget Control, Manage post project reporting and documenting

- Prepare of proposals, engineering design review, specification and material take off

- Submit tender for catalyst change-out under Dialog Catalyst Services Sdn. Bhd. for refinery in Singapore, Thailand, Indonesia, Malaysia, India, Saudi Arab and etc (June 2003 till June 2005) [PTTEP, PPMSB, SMDS, GPP4, GPP5, ExxonMobil, Shell]

- Project monitoring and management support in construction, quality, commissioning, plant maintenance & services

Major Projects :-

- As JIT (Bolting) Engineer for BASF (BDO & MAn) Shutdown at Gebeng, Kuantan August 2006

- Involve in Optimal turnaround February 2006

- Install and commissioning of Fiber bond, Project Bunga Raya E Platform (Talisman) for Sime Darby Sdn. Bhd. June 2005

- CCR Emergency shutdown (PSR 1) at Petronas Penapisan Melaka Sdn Bhd August 2004

- Absorbent change out for V-23205A (Unit 23) at Petronas Penapisan Melaka Sdn Bhd August 2004

- CCR Emergency shutdown (PSR1) at Penanpisan July 2004

- Catalyst Handling Services BPCM TAR 04 12 reactors at BPCM Sdn Bhd at Gebeng, Kuantan April 2004

- Conduct project feasibility study on pipe rack for Hui Zhou Daya Bay project

- Involve in Optimal 1st warranty turnaround 2003, for approximately 1500 workforce

Jan 2001 - Mar 2002

(1 year 2 months )

Planning superintendent

Eversendai-neie sdn bhd

Industry

Construction / Building / Engineering

Specialization

Engineering - Mechanical/Automotive

Role

Project Management

Position Level

Junior Executive

Monthly Salary

MYR 3,000

Responsibilities: -

- Evaluation and recommendation of contractors.

- Submit work progress report to clients weekly.

- Submit monthly report to manager on the progress and costing of the project.

- Monitor project status and compile project progress record.

- Ensure project deadline is met within budget.

- Manpower and other resources allocation.

Major projects: -

I) 3 x 700 MW Janamanjung Power Station, at Manjung,

Accomplishment: Completed project for power plant as a project management team

Reason for leaving: To further my career advancement opportunities.

Aug 1999 - Dec 2000

(1 year 3 months )

Mechanical Engineer (Degree)

C.J.Neo & Partners Mechanical & Electrical Consult

Industry

Construction / Building / Engineering

Specialization

Engineering - Mechanical/Automotive

Position Level

Fresh / Entry Level

Monthly Salary

MYR 2,500

Responsibilities: -

- Liaise with consultants on all the designed work related

- Submit plans to various authorities

- Drafting on Mechanical services

- Liaise with sub-contractors on the progress work.

- Design and project execution of air conditioning, plumbing and fire protection services in buildings.

Major projects completed : -

I) Proposed ISTAC project on lot 6168, 6169 & 6170, persiaran duta, kuala Lumpur.

II) Proposed primary school on PT. 21917, Alam Megah 3, shah alam, selangor.

III) Proposed warehouse office and store on lot PT. 248, mukim terbrau, daerah johor bahru, for Yinson Transport (M) Sdn. Bhd.

Mar 1995 - Aug 1997

(2 years 5 months )

Mechanical Draughtsman Engineer, (Diploma)

C.J. Neo & Partners Mechanical & Electrical Consul

Industry

Construction / Building / Engineering

Specialization

Engineering - Mechanical/Automotive

Position Level

Fresh / Entry Level

Monthly Salary

MYR 2,000

Liaise with engineers on all the designed work.

Submit plans to various authorities on behalf of engineers.

Drafting on Mechanical services expecially air conditioning, plumbing and fire protection services in buildings.

Education

1999

University of Portsmouth

Bachelor's Degree in Engineering (Mechanical) United Kingdom

Major

mechanical engineering

Grade

Grade B/2nd Class Upper

1995

Federal Institute of Technology

Diploma in Engineering (Mechanical) Malaysia

Grade

Pass/Non-gradable

Skills

Intermediate

MS Office, AutoCad

Basic

3D CAD, CNC, Baan, Naviswork, PDMS

Languages

Proficiency level: 0 - Poor, 10 - Excellent

Language

Spoken Written

English

8 8

Bahasa Malaysia

8 7

Chinese

7 5

Additional Info

Expected Salary

MYR xxx

Preferred Work Location

Anywhere in Malaysia, Anywhere in Singapore, Other work locations

Other Information

Mission :

To provide leadership, recognition and standards of excellence.

Vision :

To serve as the resource and representative for engineering division. Upgrading the skill of learning by obtaining maximum benefit through new challenge encountered and to extend creative contribution in a dynamic and progressive organization that provide opportunities to grow and develop in a professional manner.

Awards

Achievement award for Tapis EOR & rejuvenation project, Tapis-R CPP

Personal Strengths

Unigraphics Package, 2D AutoCAD Release 12, 13, 14, Windows98, Wordstart6.0, Lotus 1-2-3, Dbaseiv, Microsoft Office and etc

Other Languages

Malay, English, Mandarin

About Me

Gender

Male

Age

42

Telephone Number

+60-123**-****

Address

32, Jalan PJS 11/16, Bandar Sunway, 46150 Petaling Jaya, Selangor

Nationality

Malaysia



Contact this candidate