Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Boulder, CO
Posted:
November 28, 2016

Contact this candidate

Resume:

Professional History

**** – July ****, Akarsu Engineering and Consulting Company

**** - ****, ** ***** ****** and Construction Corporation

**** - ****, ****** *** ************ Department, State Hydraulic Works (DSI)

1993 – 2007, State Hydraulic Works (DSI) 15th Regional Directorate

1992 – 1993, Technical Research & Quality Department, State Hydraulic Works (DSI)

1985 – 1988, General Directorate of Highways (KGM), 8th Regional Directorate

Education

MS, Geotechnical Engineering, Colorado State University, Fall 1991 (GPA:3.69/4.00)

BS, Civil Engineering, Istanbul Technical University, 1985 (GPA:78/100)

Registrations/Certifications

Civil Engineer with M.Sc., Ankara, #92315

Occupational Health and Safety Certificate, 2014

Highway Design and Construction Certificate, 1988

Training

Highway Design & Construction (General Directorate of Highways( KGM), Turkey)

Motorway Design & Construction(KGM)

Sediment Transportation (State Water Affairs (DSI), Turkey)

Specification Writing for Construction Contracts (IC İÇTAŞ)

Occupational Health and Safety (IC İÇTAŞ)

Qualifications

Mr. Tasdelen has over 26 years of diversified experience in project management and design in Civil Engineering. His areas of expertise include geotechnical investigations and analyses; design and construction of dams, tunnels, irrigation canals, canal control structures; dam stability, drainage and seepage analysis; spillway design; weir design; dam safety and security assessments; design of bridges and culverts; hydroelectric power plants; highway construction; bidding documents and cost estimates; feasibility studies; environmental impact assessments; and many other types of Civil projects. He also has an excellent communication, organizational and time management skills, and engineering software literacy including Slide and Phas2 (Rockscience), AutoCAD, SAP2000 Structural Analysis, HECRAS, and Fortran, and MS Office programs.

Project Experience

Dams, Hydroelectric Power Plants,Tunnels

Nostar Dam Irrigation Tunnel (D=3.0 m, L=2.1 km), Aydın, Turkey.

As a Project Manager accomplished design of tunnel, tunnel support systems, inlet and outlet structures and impact type stilling basin; coordinated geotechnical investigations; effectively used all resources and promoted significant savings.

Yoncalı Dam Irrigation Tunnel (D=4.5 m, L=9.25 km), Malatya, Turkey. Project Manager, achived design of tunnel, tunnel inlet and outlet structures, tunnel support systems, tunnel portals slope protection and drainage system; analyzed tunnel routes to achive the most applicable and economical alternative to promote significant savings; coordinated groundwater and geotechnical investigations, drilling oversight and seismic analyses; prepared contract bid documents, cost estimates, technical specifications and approximate quantities for contract bid documents. And Successfully achived objectives and met deadlines.

Bağıştaş - I Dam and Hydroelectric Power Plant (HEPP), Erzincan, Turkey. Project Manager for design&construction of earthfill dam. Achieved design of cofferdams, upstream impervious blanket, drainage system, spillway, stilling basin, diversion conduit, viaducts, bridges, culverts and fish passage; managed geotechnical investigations and foundation curtain grouting; evaluated fill material properties; successfully overcame artesian problem encountered during cut-off excavation; accomplished slope stability, seepage-settlement analyses, downstream riverbed arrangement; developed dam instrumentation plan and analyzed instrument readings for dam safety.

İkisu Dam and Hydroelectric Power Plant (HEPP), Giresun, Turkey. Project Manager for preliminary design of Reinforced Compacted Concrete (RCC) Dam, cofferdams, foundation grouting, diversion tunnel, power tunnel, penstock, outlet and inlet structures, spillway, stilling basin and powerhouse. Also accomplished feasibility studies, dam stability - seepage - settlement analyses; executed environmental impact report and geotechnical investigations; organized preparation of construction documents, technical specifications and cost estimates.

Çileklitepe Weir and Hydroelectric Power Plant (HEPP), Giresun, Turkey. Project Manager for design and construction of Çileklitepe weir, fish passage, sedimentation basin, power house, power tunnel, conveyance pipeline, head pond, discharge channel, penstock, overflow weir, powerhouse building, bridge, retaining walls, design and installation of drainage systems.

Trabzon Weirs and Hydroelectric Power Plants (HEPPs), Trabzon, Turkey. Project Manager for design and construction of Üçharmanlar, Üçhanlar and Kemerçayır weirs, fish passages, sedimentation basins, power houses, power tunnels, penstocks, hydraulic works, bridges&culverts, discharge channels, impact type stilling basins, overflow channels and design and installation of drainage systems.

Niksar HEPP Conveyance Canal Overflows, Niksar Turkey. Project Manager for investigation of canal overflows near the head pond due to emergency turbine shut down. Prepared a detailed Technical Report, recommended increasing canal wall height based on water profile studies.

Batman Right Bank Irrigation Tunnel, Batman, Turkey. Chief Project Engineer for design of conveyance tunnel, excavation and supporting systems, hydraulic computations, tunnel inlet and outlet structures.

Yamula Dam Irrigation Tunnel, Kayseri, Turkey. Chief Project Engineer for design of irrigation tunnel, excavation and supporting systems, hydraulic computations, tunnel inlet and outlet structures.

Zara Irrigation Project Conveyance Tunnel, Sivas, Turkey. Chief Project Engineer for conveyance tunnel, inclined chute, head pond, penstock, retaining walls and stilling basin.

Apa Hotamış Main Conveyance Canal Railroad Crossing, Konya Turkey. Chief Project Engineer for railroad crossing conduit on the main canal, structural analyses and civil works.

Sarıoglan Irrigation Project, Kayseri, Turkey. Chief Project Engineer for culvert design, structura&reinforcement analyses and head loss computations.

Klavuzlu Irrigation Project, Kahramanmaraş, Turkey. Chief Project Engineer for design of bridges & culverts on the main canal. Achieved head loss computations, structural and reinforcement analysis and civil works.

Manyas Plain Right Bank Irrigation Project, Balıkesir, Turkey. Chief Project Engineer for design of conduit, inlet and outlet structures. Achieved structural&reinforcement analyses, and hydraulic head loss computations.

Dadağı and Uzungüney pump stations, Kayseri, Turkey. Chief Project Engineer for design of Dadağı and Uzungüney pump station buildings. Accomplished design of penstock blocks, retaining walls, head pond and discharge channel; and performed structural&reinforcement analyses.

Tigris River Irrigation, Conduit Project, Diyarbakır, Turkey. Chief Project Engineer for the design of four conduits with FLOWTITE pipes, inlet and outlet structures. Also, achieved analyses of hydraulic head loss and uplift of the system.

Suruc Plain Pumping Irrigation Project, Şanlıurfa, Turkey. Chief Project Engineer for design of TP1 and TP4 pump stations, penstock, head pond, discharge channel and retaining walls.

Right Bank Irrigation Project, Canal Inspections, Batman, Turkey. Inspected over 20 kilometers of irrigation canals and associated structures; investigated landslides, settlement problems at the inlet of siphon conduit; prepared a detailed inspection report with a team of expert engineers and proposed rehabilitation works.

Mardin-Ceylanpınar Plains Main Irrigation Canal Appurtenant Structures, Şanlıurfa, Turkey. Chief Project Engineer for design of Mardin Irrigation Canal (flow rate of 7200 cfs) control structures, a conduit, three diversion structures and three bridges. Also, accomplished water profile studies and head loss computations.

Mavi Weir - Apa Hotamış Storage, Konya Turkey. Chief Project Engineer for design of hillside structures; Mavi weir, spillway, stilling basin, sedimentation basin, water intake, sluice channel, retaining walls, weir bridge, and P7-P8 pump stations.

Batman Left Bank Irrigation Project, Bridge Projects, Batman, Turkey. Chief Project Engineer for design and civil works of bridges on the main canal.

Mardin-Ceylanpınar Main Irrigation Canal, Şanlıurfa, Turkey. Chief Project Engineer for conduit design, inlet- outlet structures, canal control structures, head loss and geotechnical investigations.

Kralkızı Irrigation Project, Diyarbakır, Turkey. Chief Design Engineer for prefabricated prestressed reinforced bridges on the main canal.

Sarkışla Kanak Revised Planning and Irrigation Project, Sivas, Turkey. Chief Project Engineer for design of Kutan weir, spillway, stilling basin, sedimentation basin, water intake, sluice channel and retaining walls.

ASO IV. Irrigation and Drainage Project. Adana, Turkey. Technical Engineer for design of canal, canal drainage system, foundation soil rehabilitation works.

Karasu Riverbed Rehabilitation Project, Muş; Turkey. Project Engineer responsible for erosion protection in the Karasu riverbed and design of control structure for culvert operation.

Adıyaman Irrigation Camgazi Pump Station, Adıyaman, Turkey. As a Project Engineer achieved design of Çamgazi pump station, conveyance pipeline, head pond, penstock, retaining walls and discharge channel.

Geotechnical Engineering

Damlapınar HEPP Conveyance canal landslides, settlement and seepage problems, Karaman, Turkey.

Project Manager, investigated and monitored land slides, settlements, cracks and seepage problems in Damlapınar HEPP conveyance canal. Prepared an extensive report, proposing construction of an anchor wall and retaining wall for canal protection.

Niksar HEPP, Canal Inspections, Niksar, Turkey. Technical Project Manager responsible for investigating seepage, settlement problems, and cracks in the invert of Niksar canal. Recommended grouting injection to stabilize the canal foundation, rehabilitatating of nonfunctional drainage system, and installing of collectors to discharge to Kelkit Stream. Developed an instrumentation plan for settlement measurements along the canal.

Left Bank Irrigation Project, Landslide Investigation, Batman Turkey. Geotechnical Engineer, investigated landslides resulted in failure of the conduit made of FLOWTITE pipes, prepared a comprehensive Investigation Report including suggestions to repair the conduit.

Bozdogan Akçay Left Bank Main Canal Failure Investigation, Aydın Turkey. Geotechnical Engineer, evaluated the root causes of the failure, inspected seepage under the canal, performed extensive groundwater and geotechnical investigations on site for evaluation of soil formations underlying the canal, prepared a detailed Investigation Report, and recommended alternatives for repair works.

Postalı Dam Foundation Seepage Problem, Nigde, Turkey. As a Geotechnical Engineer inspected slurry trench application in Postalı Dam, examined test results according to technical specifications, evaluated borehole samples taken from slurry trench and seepage test results. Prepared a detailed technical report and submitted to DSI General Directorate.

Technical Research and Quality Department, Ankara, Turkey. Geotechnical Engineer responsible for performing laboratory soil tests (permeability, compaction, Atterberg limits, triaxial and consolidation tests) and preparation of test reports for various projects.

Construction Management

Damlapınar HEPP conveyance canal landslide protection project, Karaman, Turkey. Project Manager for the construction of anchor wall and retaining wall to prevent landslides along the canal. Accomplished contract management, inspection and surveying of civil works, preparation of construction documents and cost estimates, calculating approximate quantities for contract bid documents; and prepared payment reports to subcontractors.

Niksar HEPP Canal Rehabilitation Works, Niksar, Turkey. As a Project Manager coordinated installation of drainage system, slope protection of Niksar conveyance canal. Also, accomplished grouting injection to stabilize the canal foundation; prepared contract bid documents, cost estimates, technical specifications and payment reports to subcontractor.

Sakalıkesik and Gunisik Irrigation Projects Bidding Documents, Ankara Turkey. As a Technical Engineer, inspected application projects; prepared work scope, technical specifications, unit prices, cost estimates, bidding documents; and coordinated bidding process.

Foreign Credit Irrigation Projects Financed by Council of Europe Development Bank (CEB). Project Engineer, co-worked with CEB’s Technical Advisors to manage loan flow, project implementation and field progress for several projects in Turkey. Also, prepared annual project progressive reports as well as completion reports to be submitted to CEB upon full implementation of the projects.

Southeastern Anatolian Project, Harran Plain Section 4&5 Irrigation Projects(45000 ha), Şanlıurfa, Turkey. Project manager responsible for overall project management including planning, work schedule, construction of irrigation canals and appurtenant structures, roads, canal embankment, drainage system, discharge canals, weirs, pump stations, bridges and culverts. Also achieved contract management, inspection and surveying of civil works, geotechnical ivestigations; prepared cost estimates, unit prices, approximate quantities for contract bid documents and payment reports for sub contractors.

Southeastern Anatolian Project, Main outlet Canal, Şanlıurfa, Turkey. Field Engineer, co worked with Swiss Consulting Company - Ataturk Engineers and Joint Venture(AEJV) to manage construction of main outlet canal with flow rate of 328 m3/s, drainage system of the canal, headrace canal, water intake of Sanliurfa HEPP, spillways, by pass shuts, stilling basin, canal control structures and slope protection works.

Samsat Highway Project, Adiyaman, Turkey. As a Project Manager achieved highway construction, planning, work schedule, borrow source material evaluations, culverts&bridges and road drainage system; inspected the quality of civil works; prepared cost estimates, approximate quantities for contract bid documents and payment reports.

Transportation(Bridges and Highway) Engineering

Bağıştaş - Ilic Highway Relocation, Euphrates River Viaduct, Erzincan, Turkey. Project Manager responsible for design and construction of Euphrate river viaduct project due to highway relocations within Bagistas- I dam reservoir. The viaduct consists of 8 spans with prefabricated prestressed reinforced beams having length of 40 m, has a with of 2x12 m and a total length of 337.50 m. The viaduct piers are supported by a pile foundation system which is left under reservoir.

Bağıştaş - Ilic Highway Relocation, Kurucay Bridge, Erzincan, Turkey. Project Manager for Kurucay bridge project constructed due to highway relocations within Bagistas-I dam reservoir. The bridge consists of 3 spans, with prefabricated prestressed reinforced beams having length of 27.4 m, has a with of 2x12 m and a total length of 82.20 m. The bridge piers are supported by a pile foundation system, which is left under 5m of dam reservoir.

Kemaliye - Kemah Highway Relocation, Box Culvert, Erzincan, Turkey. Technical Project Manager for box culvert project constructed due to highway relocations within Bagistas-I dam reservoir. The box culvert consists of 5 spans with 4m x 4m cross section and has a total length of 60.50 m.

Çileklitepe Weir and Hydroelectric Power Plant (HEPP), Power House Bridge, Giresun, Turkey. Project Manage for Çileklitepe HEPP power house bridge having a width of 6m, length of 23m and consisting of steel beams.

Samsat Highway Reconnaissence and Preliminary Surveys, Adiyaman, Turkey. Team Engineer/Leader for locating highway route and choosing the functional and operative highway alignment. Accomplished detailed topographic and geotechnical analyses; coordinated preliminary surveys, located highway route and performed geometric design of vertical and horizontal alignments and cuves.

Edirne-Istanbul-Sakarya Motorway Construction Project, Istanbul, Turkey. Technical Engineer, actively involved in the construction of one of the first motorways built in the west part of Turkey. Accomplished construction of viaducts (long bridges), piles foundation of viaducts, prestressed beams used in viaducts, drainage systems, inspection of construction materials, compaction of road materials.

Highway Training, Ankara, Turkey. Civil Engineer, atended Highway Design and Construction Techniques training course presented by General Directore of Highways for six months. Succesfully completed the training course and received a certificate.



Contact this candidate