CAREER OBJECTIVE

To reach the apical destination of success with the guiding principles of patience, perseverance, perfection, aptness, smart, hard work and above all honesty.

PROFESSIONAL SNAPSHOT:

Accomplished proactive engineer having more than 8 years of experience till date in Installation, Commissioning & Maintenance in EPC.

Associated with McNally Bharat Engg. Co. Ltd., Kolkata as Manager.

A keen performer having experience in site co-ordination & management, managing maintenance of various equipment for reducing downtime and enhancing operational effectiveness of equipment. Also recognized for strong adherence to safety, ability to work well as a team member & leader, and exceptional work ethics & has proven technical interpersonal communication & training skills.

Core competencies and professional strength includes:

Project Co-ordination

Documentation

Project development

Project Funding

Report Preparation

Personal Oversight

Safety Compliance

Electrical testing /Analysis

Process improvement

Budget control/ Cost Control

Project scheduling

Quality control

Purchasing

Customer Services

CAREER RECITAL

1. Present Company: Currently working with McNally Bharat Engineering Co. Ltd. in Project Division.

Designation : Manager – Electrical

Period : 8th July, 2009 till date

Project Execution

Present project : STEEL AUTHORITY OF INDIA, BSP, BHILAI.

PROJECT PERIOD : 10.10.2014- TILL DATE

PROJECT TITLE : BY PRODUCT PLANT OF COKE OVEN BATTERY-11, BSP-BHILAI

ROLE DESCRIPTION:

A. I have been working as a Manager and Site-Coordinator. Here I have carried out installation, testing & commissioning jobs of electrical equipments e.g. TRANSFORMERS, INTELLIGENT MCC, LT PCC, EPMCC, LT Breakers, 25 & 15 KVA UPS, and HTMCC. Testing and commissioning of HT MOTORS, LT motors upto 200 kw. Establishment of Modbus & Profibus Communication in between relays of PCC/MCC & DCS, CONTROLLER of ETP PANEL with DCS. Commissioning of L&T make M-COMPS & F-COMPS relays. Testing, commissioning of ELECTROSTATIC TAR PRECIPITATOR has also been done.

B. At present my primary responsibilities are to look after the whole site as deputy site in charge; planning; endeavoring site co-ordination like coordinating with H.O., Clients, vendors/suppliers for all types of issues and disputes of the whole site that may cause impediment in the progress of my project.

2. PREVIOUS PROJECT : Modernization of IISCO,SAIL, Burnpur

PROJECT PERIOD : 19.12.2011- 10.10.2014.

PROJECT TITLE : BYPRODUCT PLANT OF COKE OVEN BATTERY-11, ISP, Burnpur.

DESIGNATION : Asst. Manager & then Deputy Manager - Electrical

3. PREVIOUS PROJECT: An extension project of CHP of Santaldih Thermal Power Station (250 Mw Generating station).

PROJECT PERIOD : 20.06.2011-19.12.2011.

ROLE DESCRIPTION - Erection testing and commissioning of MCPs for 160 kw motor of conveyors for bunkers. Erection, testing & commissioning of safety switches like pull chord switches, belt sway switches, zero speed switches. Erection, testing and commissioning of bunker level sensors. Testing and commissioning of tripper conveyors.

4. PREVIOUS PROJECT : Erection, Installation, Testing & Commissioning of a 2MTPA lead & zinc beneficiation process plant of HINDUSTAN ZINC LIMITED, (287 Crore EPC Contract) Dariba, Rajasthan and at Rampura Agucha have been done respectively.

POJECT PERIOD : June 2009 – May 2011

DESIGNATION : Assistant Manager Electrical.

ROLE DESCRIPTION : The above mentioned two projects are for lead & zinc preparation process plants. The plants comprises of Main process plants consisting of grinders, concentrate tanks, scavengers, agitators, pumps, analyzers, fine ore bins & Primary, Secondary/Tertiary Crusher houses, Tripper Conveyors system, thickeners. These plants were fully of Automation system controlled by DCS system.

5. Company : Worked AT MSC OF VODAFONE ESSAR EAST LTD., AGARPARA,W.BENGAL

Designation : Electrical Engineer (O&M) at MSC site

Duration : 3rd December, 2008 – 10 June 2009.

Responsibility: Operation & Maintenance of HT/LT Panel & MDB. Maintenance of TRANSFORMERs & CIRCUIT BREAKERs. Maintenance of LT Distribution System by Proper Fault Rectification & Regular basis maintenance. Idea of cable commissioning & connection of all equipments of Mobile switching centre. Operating EMERSION POWER SYSTEM & UPS (6-60 KVA). Data Management, Material Management, Site Development & Dealing with various service providers.

SUMMER TRAINING

SL NO.

ORGANISATION

TRAINING DESCRIPTION

DURATION

TEAM SIZE

1.

CALCUTTA ELECTRIC SUPPLY

CORPORATION (LTD), Kolkata

Substation, Distribution station, Power Distribution Mains (Construction), Distribution of power at various areas of Kolkata metropolitan.

03 weeks

01

2.

THE DURGAPUR PROJECTS

LTD., Durgapur.

Over view of Coke Oven, Over view of Thermal Power Plant.

02 weeks

04

QUALIFICATION

B.TECH (Electrical Engineering) from W.B.U.T.- 2004- 2008

12th from W.B.C.H.S.E.- 2002-2004

10th from W.B.B.S.E - 2002

PERSONAL DOSSIER