Career Summary

- A highly professional and dedicated Mechanical

Engineer with over 11 years' Gas field and power

station experience, including expertise in static and rotating (heavy duty, Aero derivative gas Turbine, centrifugal gas compressor). Gifted with strong

analytical and practical field engineering skills, remarkable on technical details whilst also making effective technical contributions at a higher level. Excellent communication and interpersonal skills and proficiency in the use of PC.

32 el Khadr,

st,suez,Egypt, 43511

23 November,1981

Male

Egyptian

002***********

002**********

Mahmoud_yassien@hot

mail.com

Married, one daughter

Exempted

Driver license

Objective

- Desire the Challenging Position of Mechanical

Engineer to Assist the Lead Engineer in Meeting

Company Requirements and Performing all Technical

Duties in a Highly Competent and Efficient Manner. Experience Summary

- Turbo machinery Section Head Engineer at RASHED

PETROLUM CO, Alex, Egypt.[November 2008 to till

date].

- Operation Engineer at ATAKA POWER STATION,

Suez, Egypt. [September 2006 to Feb 2009].

- Mechanical Engineer at Vinavil Egypt for chemicals, Suez,Egypt. [April 2006 to September 2006].

Education Summary

- Ain Shams University, Faculty of Engineering,

Mechanical Power Department, Cairo,Egypt.

B.Sc. of Mechanical Power Engineering.

(June2005).

- Introduction of operating power station.

- Advanced course of operating power station.

- Safety in Industrial operation.

- On job training for power station operation.

- Water treatment technology.

- SKF bearing basic & advanced technology.

- Hydraulic system basic at AUC.

- Alignment for pump at ntecom.

- Lifting supervisory certificate from BV.

- Platinum osha

Reading,Computer,Internet, Play football,

Windows,office,internet

Mechanical Engineer

I.RASHED PETROLUM CO, Alex, Egypt.

Rashpetco/Burullus is one of the largest natural gas companies in Egypt and accounts for more than 40 % of the total gas production in egypt.Rashpetco was formed to develop and produce gas from Rosetta offshore gas concession. The joint venture partners’ are: E-Gas- 50%, SHell-40 %( Operator) &Edison-10%.burullus gas company was formed to develop and produce gas from West Delta Deep Marine offshore gas concession. The joint venture partners are: E-Gas 50%,SHell- 25%(Operator)and petronas-25%.Rashpetco/Burullus cover all upstream activities like exploration,drilling and production.it employs more than 900 staff and long term contractors between Cairo and Idku in Alexandria where our plants exist.

Profile

Job title Turbo machinery section Head engineer

Rosetta plant: Two solar gas turbines centaur 40, 2 nouvopignonePGT10, 2thermodyne gas comp.Burullus plant:3Siemens turbo generators (SGT100),2 Siemens turbo compressor

(SGT400), 5 GE aeroderivative(PGT25+DLE)(LM2500),3 Siemens turbo generators (SGT300). The turbo

machinery

equipment:-

Roles and

Responsibilities

Siemens &Solar Gas

turbine activities

1. HANDS ON EXPERIENCE IN INSTALLATION, PRE-COMMISSIONING, COMMISSIONING AND OPERATION & MAINTENANCE OF 2 TURBO COMPRESSORS (SIEMENS SGT400). 2. DURING COMMISSIONING, PREPARE THE SITE QUERY & PUNCH LIST DOCUMENT RELEVANT TO THE 2- TURBO COMPRESSOR.

3. ASSIST SIEMENS REP IN CHANGING DUMMY BEARING FOR 2 CENTRIFUGAL GAS COMPRESSORS (SIEMENS STC-SV(10-2-P)) DURING THE COMMISSIONING. 4. ASSIST SOLAR REP IN CHANGING THE GEARBOX FOR SOLAR GAS TURBINE CENTAUR 40. 5. PARTICIPATED IN THE STARTUP,ANTI-SURGE TEST, PERFORMANCE TEST FOR THE 2 SIEMENS TURBO COMPRESSOR.

6. ASSIST SIEMENS REP IN CHANGING THE BUNDLE,JOURNAL BEARING, THRUST BEARING AND DRY GAS SEAL FOR THE GAS COMPRESSOR.

7. ASSIST SIEMENS REP IN BLADE CHANGE OVERHAUL FOR THE SGT400 TURBINE. 8. ASSIST SIEMENS REP IN DISMANTLE THE BUNDLE FOR THE GAS COMPRESSOR TO MADE MODIFICATION FOR THE DIFFUSER.

9. ASSIST SIEMENS REP IN DISMANTLE THE CORE ENGINE FOR THE SGT400 TURBINE TO INSTALL THE SPARE ONE.

10. ASSIST SIEMENS REP IN MAKING TRIM BALANCE FOR THE SGT400 POWER TURBINE SHAFT.

11. ASSIST SIEMENS REP IN DISMANTLE THE CORE ENGINE FOR THE SGT100 TURBINE TO INSTALL THE SPARE ONE.

12. ASSIST ALLEN GEAR REP IN C-TYPE INSPECTION FOR GEARBOX OF SGT100. 13. APPLY PRESERVATION PROCEDURE FOR SGT100,SGT400,SOLAR UNITS. Gas Turbine

Commissioning

Maintenance

Operation

Siemens SGT100,300,400

Solar Centaur 40

Centrifugal Gas

Compressor

Balance

Borescope

Preservation

Installation

Mechanical Engineer

Roles and

Responsibilities

GE Gas turbine activities

14. HANDS ON EXPERIENCE IN INSTALLATION, PRE-COMMISSIONING, COMMISSIONING AND OPERATION & MAINTENANCE FOR PGT25 PLUS DLE(LM2500). 15. 1ASSIST GE REP IN THE (LEVEL ONE INSPECTION) 3 TIMES FOR PGT25 PLUS DLE(LM2500).

16. ASSIST THERMODYNE REP IN CHANGING THE TWO STAGE ROTOR WITH ANOTHER ONE 6 STAGE FOR CENTRIFUGAL GAS COMPRESSOR.

17. CARRIED OUT MINOR INSPECTION FOR THE CENTRIFUGAL COMPRESSOR 2BCL606 INSPECTING THE JOURNAL BEARINGS, THRUST BEARING, TERTIARY SEALS AND DRY MECHANICAL SEALS.

18. ASSIST GE REP IN THE MAJOR OVERHAUL INSPECTION 3 TIMES FOR PGT10. 19. ASSIST GE REP IN THE COMBUSTION CHAMBER INSPECTION 5 TIMES FOR PGT10. 20. ASSIST GE REP IN THE HOT GAS PATH INSPECTION 4 TIMES FOR PGT10. 21. CATASTROPHIC FAILURE FOR AXIAL COMPRESSOR PGT10 HAD BEEN OCCURRED SO REPLACED AXIAL COMPRESSOR.

22. CONTRIBUTE IN THE INVESTIGATION FOR THE CATASTROPHIC FAILURE AS ONE OF THE ROOT CAUSE ANALYSIS TEAM REPRESENTATIVE MY COMPANY IN FLORENS GE WORKSHOP.

23. ASSIST THERMODYNE REP IN REBUNDLE FOR THE GAS COMPRESSOR. 24. ASSIST GE REP IN GG REMOVING FOR LM2500 AND PRESERVED IN THE CONTAINER. 25. ASSIST GE REP IN POWER TURBINE MODULE REMOVING FOR LM2500 AND PRESERVED IN THE CONTAINER.

26. APPLY PRESERVATION PROCEDURE FOR LM2500 UNIT OUT OF SERVICE. 27. APPLY PRESERVATION PROCEDURE FOR PGT10 UNIT DURING HANDOVER THE PLANT TO KEEP THE ASSET.

Common activities

related to all gas turbine

different manufactures:

28. OPERATING, MAINTENANCE,TROUBLE SHOOTING, OF TURBO COMPRESSOR & TURBO GENERATION EQUIPMENT AT GAS PLANT.

29. PREPARE ON A PERMANENT BASIS THE DAILY REPORT RELEVANT TO THE TURBOMACHINERY MAINTENANCE WORK.

30. REVIEW & ANALYSIS ANY TROUBLE SHOOTING.

31. PERFORM BORE SCOPE INSPECTION FOR SGT100, SGT400,PGT10,PGT25. 32. MANAGING OUTSIDE SUPPLIER SERVICES INCLUDING THE PREPARATION OF REQUESTS FOR QUOTE, BID EVALUATIONS.

33. PROVIDING EXPERTISE ON THE APPLICATION OF COMPANY CODES AND STANDARDS, LEADERSHIP, WORK DIRECTION, AND TECHNICAL EXPERTISE. 34. PROVIDING TECHNICAL AND BUDGET DIRECTION AND COORDINATION FOR FUTURE ACTIVITIES.

35. RECOMMENDING AND IMPLEMENTING SOLUTIONS TO COMPLEX PROBLEMS INVOLVING THE ENGINEERING, DESIGN, OPERATION, AND MAINTENANCE OF COMPANY ASSET.

Aeroderviative

LM2500 PGT25 plus DLE

Heavy duty PGT10

Gas Turbine

Commissioning

Maintenance

Operation

Centrifugal Gas

Compressor

Balance

Borescope

Preservation

Installation

Mechanical Engineer

36. PERFORM COMMUNICATION OF COMPLEX TECHNICAL AND PURCHASING ISSUES. 37. RESPONSIBLE FOR ROUTINE, PREVENTIVE OF PLANNED OVERHAULS AND BREAK DOWN MAINTENANCE OF ASSIGNED GAS TURBINES IN ORDER TO REDUCE MEANTIME BETWEEN FAILURES.

38. REVIEW DAILY/OVERHAUL REPORT PREPARED BY ENGINEERS AND PREPARES THE REPORTS FOR ASSIGNED AREAS.

39. ENSURE COMPLIANCE WITH SHELL SAFETY, QUALITY & ENVIRONMENT PROCEDURES. CARRYOUT TRAINING OF FOREMAN TO ENSURE TOOL BOX TALKS ARE CARRIED OUT BASED ON RISK ASSESSMENT.

40. PREPARE SPARES PARTS LIST FOR PROCUREMENT, ARRANGE FOR INSPECTION OF ITEMS ORDERED ON RECEIPT IN STORES. ENSURE AVAILABILITY OF SPARES PARTS & MATERIAL FOR PREVENTIVE & PREDICTIVE MAINTENANCE AND OVERHAULS. 41. PREPARE TOOLS AND DEVICES REQUIRED FOR MAINTENANCE AND ARRANGE FOR PROPER UPKEEP AND CALIBRATION OF THE SAME.

42. ESTABLISH GAS TURBINES TRACKING SHEETS RELATIVE TO FFH (FACTORED FIRING HOURS) AND PLAN THE SHORT TERM AND LONG TERM INSPECTION PLAN FOR EACH GAS TURBINE.

43. REVIEW MAINTENANCE PROCEDURES, JOB PLANS, STANDING INSTRUCTION, OPERATING MANUALS, AND TO UPDATE COMPANY MANUALS FOR SAFE MAINTENANCE AND OPERATION. FOLLOW UP WITH GT OEM THE LATEST MAINTENANCE BULLETINS AND UPDATE COMPANY PROCEDURES. 44. INITIATE MANAGEMENT OF CHANGE FOR ANY REQUIRED MODIFICATION AND ASSIST ENGINEERING DEPARTMENT DURING STUDY PHASE, HAZOP, AND IMPLEMENTATION. THE MODIFICATION SHALL BE PROCESSED IN LINE WITH COMPANY STANDARDS, INTERNATIONAL STANDARDS AND OEM GUIDELINES.

45. PREPARE AND PLAN IN DETAILS ALL INSPECTION ACTIVITIES, PLANNED MAINTENANCE, MAJOR OVERHAULS, AND MAINTENANCE JOBS DURING PLANNED SHUTDOWNS AND FORCED SHUTDOWNS. DEFINE AND FOLLOW UP ALL REQUIRED RESOURCES TO PERFORM THE MAINTENANCE ACTIVITIES.

46. RESPONSIBLE FOR THE TIMELY, SAFE, COST EFFECTIVE ACHIEVEMENT OF GAS TURBINE’S RELIABILITY AND AVAILABILITY TARGETS AS DIRECTED BY MAINTENANCE POLICY & STRATEGY AND IN LINE WITH APPLICABLE INDUSTRY STANDARDS, CODES AND BEST PRACTICES.

47. HANDS-ON EXPERIENCE FABRICATING AND TESTING UNIQUE MECHANICAL SOLUTION FOR A VARIETY OF EQUIPMENT.

48. SELF MOTIVATED, CREATIVE AND CAPABLE OF HANDLING AND PRIORITIZING MULTIPLE ACTIVITIES.

Common activities

related to all gas turbine

different manufactures:

Safety

Troubleshooting

Analytical

Manegment

Gas plant

problem solver

technical report

Risk Assessment

MOC

EIR

Purchasing issues

TOOLS

Standard

Cost Reduction

Fabrication

Self Motivated

Creative

Job Plans

Team Work

Material

Spare parts requests

Mechanical Engineer

Profile II. ATAKA POWER STATION, Suez, Egypt

Ataka thermal Power station, located in the Suez region of Egypt, was built in the early 1980s using German and Austrian technology and a Siemens control system. The four units at Ataka comprise two 150 MW units and two 300 MW units to give a total generating capacity of 900 MW.Controls system was upgraded by Emerson to established and improve appropriate level of system control for the power generation units. 1. PREPARE AND OPERATING BOILERS AND STEAM TURBINES UNIT. 2. GOOD KNOWLEDGE OF STARTUP PROCEDURES, MONITORING PARAMETERS, TESTING, SHUT DOWN PROCEDURES.

3. IGNITION THE BURNER FOR BOILER WITH NATURAL GAS OR HEAVY OIL OR MIXED. 4. IN CASE OF FAILURE FOR ANY EQUIPMENT SPECIFY THE PROBLEM, CALL MAINTENANCE, AND FOLLOW UP THE WORK TILL FINISHING.

5. DURING NORMAL OPERATION MAKE SURE SAFE AND EFFICIENT OPERATION FOR THE UNIT AND FOUND FAST SOLUTION FOR ANY PROBLEM HAPPEN. 6. GOOD KNOWLEDGE OF DCS CONTROL SYSTEM. ( EMERSION) 7. PARTICIPATED WITH THE PREVENTIVE MAINTENANCE OF STEAM TURBINE FOR THE 10 YEARS PREVENTIVE MAINTINACE, ACCOMPLISHED BY SIEMENS VENDOR REP. Job title Operation Engineer

Roles and

Responsibilities

Profile

III. Vinavil Egypt for chemicals, Suez, Egypt.

Vinavil Egypt is a joint-venture of the Mapei Group (50%), with the Lebanese Group Obegi Chemicals and the Egyptian company Tibah Chemicals. The plant manufactures This factory produces polyvinylacetate emulsions that are used in several industries, amongst which adhesives, paints and textiles. Job title Mechanical Engineer

1. APPLY MAINTENANCE OF PLANT EQUIPMENTS (PUMPS, MIXER, BOILER, COOLING TOWER

2. PREPARE THE PREVENTIVE MAINTINACE SHEETS, AND FEED BACK AFTER COMPLETION Roles and

Responsibilities

Steam Turbine

Boiler

Power plant

Maintenance

Operation

pumps