RENE M.BLANCA
Brgy,san roque,bauan,batangas,city phillipines
Email add: ***********@*****.***
Email add: ***************@*****.***
Cp:# 092********
Cp# 091********
Cp# 091********
CRANE AND EQUIPMENT QUALIFIED TO HANDLE:
LIEBHERR--LR-1300 ( crawler crane ) 300 tons
LIEBHERR LR-1280 ( crawler crane ) 280 tons
KOBELCO CKE-2500 ( crawler crane ) 250 tons
LIEBHERR LR-1600 ( crawler crane ) 160 tons
KOBELCO CKE-1800 ( crawler crane ) 180 tons
KOBELCO CKE-1350 ( crawler crane ) 135 tons
LIEBHERR LR-1200 ( crawler crane ) 200 tons
CLARK-LIMA-7707 ( crawler crane ) 300 tons
AMERICAN-7260 ( crawler crane ) 100 tons
AMERICAN-9260 ( crawler crane ) 125 tons
P&H-BTC-790 ( truck mounted ) 90 tons
P&H-BTC-690 ( truck mounted) 70 tons
TADANO-TG-500E ( truck mounted ) 50 tons
COLES-3640 ( truck mounted ) 40 tons
XCMG-QT65 K ( truck mounted ) 65 tons
TADANO-TR-PRO 500 ( rough terrain ) 50 tons
P&H-KOBELCO-RK ( rough terrain ) 25 tons
XCMG-QY50K-II ( truck mounte ) 50 tons
( rough terrain ) 70 tons
TADANO- GR-700 EXL
TEREX- RT-555 - ( rough terrain ) 50 tons
TEREX- RT-780 ( rough terrain ) 70 tons
( JOB DISCRIPTION:)
# ensure proper assembling/dismantling of main,luffing/fly jib its connection of wiring to the
limit switch proper sitting to the computer,
# ensure proper sitting of outrigger to attain maximum lifting strength of the unit,
# ensure proper sitting of boom configuration and length & number of partline and to the
computer
According to the load to be lifted of crane,
# ensure that the counter wiegth properly installed correctly specially liebherr/kobelco
crawler,
# ensure proper sitting of the computer according to the physical of the outrigger,and boom
configuration from the load chart to attain accurate functioning of the computer and limit
switches
# erection of piperock,structural,tools,equipment,etc.
K.S.A. SAUDI ARABIA
POSITION: CRANE OPERATOR
EQUIPMENT: LR-1280 crawler
COMPANY : CCC: city cement company (ksa) marat,riyadh
YEAR: january,20, 2014 to September,24,2014
Lifting of miscellaneous job such as pressure vessel tanks,electrical motors,panel board,loading
and unloading of materials,pipes,plates,culumns,erection of structurals,installation of GTC gas
treatment centre,installation of piperock,erection of chimney smoke stock,
POSITION: CRANE OPERATOR
EQUIPMENT: LR-1300 / CKE-KOBELCO 2500 crawler
COMPANY: MAADEN,ALUMINUM,COMPANY: (ksa) ras alkhiar jubail
YEAR: august,10,2012 to December,08,2013
Installation of pre-heater tower,lifting of culumns,diagonal beam
support,pipes,structural,offloading and loading of materials,re-placing of old and new
ballmill,erection of kilndrive,install and erection of conveyor rack and piperack,erection of
beam support at silo,chimney smoke stock,heating pan.,dust collector
POSITION: CRANE OPERATOR
EQUIPMENT: LR-1200 crawler
COMPANY: PSA 2000: white cement plant company (ksa) riyadh
YEAR: march,2012, to may,2012
Installation of pre-heater tower,lifting and erection such as culumns,structural beams,lifting
ballmill,kilndrive,piperack,conveyor rack,conveyor tower,silo beam supports,dust
collectors,assembly of tower crane and dismantling,etc.
POSITION: CRANE OPERATOR
EQUIPMENT: CKE-KOBELCO 2500 crawler
SINOMA INTERNATIONAL ENGENEERING (ksa) majarda
COMPANY:
YEAR: November,22,2009 to November,09,2011
installation and erection of pre-heater tower,erection of culumns,bracing pipe,bracing
beams,lifting ballmill,kilndrive,lifting conveyor rack,electrical rack,silo beams
support,dust collector,
POSITION: CRANE OPERATOR
EQUIPMENT: LR-1200 / CKE-KOBELCO 1350 crawler
COMPANY: TCC,SAUDI KAYAN,PETROCHEMICAL PLANT (ksa) jubail
YEAR: march,04,2008 to September,26,2009
lifting and erection structurals,beams,pressure vessel tanks,pipe install and erections,liftng
electrical motors,loading-unloading of materials from stock yard,installation of pipe rack at
HDPA high density area,and miscellaneous jobs,loading and unloading of incoming container
material,
PHILIPPINES EXPERIENCE
HEAVY EQUIPMENT OPERATOR:
POSITION:
( AG&P) atlantic gulf & facific com.of manila: philippines
COMPANY:
YEAR: febuary,01, 1990 to November,19,2001 / january,06, 2004 to
November,19,2007
Lifting of incoming/out going materials,support of supplied parts and materials needed by
fabrication shop,stock yard,and load-out delivery,install of mudule piperack,etc.
POSITION: CRANE & FORKLIFT OPERATOR:
COMPANY: UNIVERSAL HARVESTER INC: Philippines
YEAR: march,01, 2004 to September,07, 2006
Support lifting of fabricated asbestos mother tank,and lifting of finished fabricated
pipe,structural beams,loading of delivery container finish product.
POSITION: LOGISTIC OPERATOR:
COMPANY: ROHM & HASS PHILIPPINES: Philippines
YEAR: January,21, 2002 to November,08, 2002
Logistic,operator receiving of all incoming raw materials,and out going chemical material,
POSITION: CRANE OPERATOR:
COMPANY: SUPERMAX PHILIPPINES: Philippines
june,05,2001 to October,20,2001
YEAR:
Erection of structural support,pipe,tanks,electrical materials,offloading of materials,
( DUTIES AND RESPONSIBILITIES )
Prepare safety procedures and specification prior to start of work for equipment operation first
oil check,fuel,belts,battery terminal,check all parts of equipment before operation,
Support rigging and also in maintainance work like greasing engine,cleaning and repair
maintainance work.
( EDUCATIONAL ATTAINMENT: )
Completed primary: kinamaligan elementary school from june 1974 to march 1979
Completed secondary: bara.milagros Masbate
( PERSONAL INFORMATION:)
Date of birth: November,30,1967
Place of birth: bara,Milagros Masbate
Sex: male
Civil status: married
Nationality: Filipino
Religion: roman catholic
Sss: 039096912-3
Tin: 125-877-266
Language: English,tagalong,bisaya,Arabic
( SPECIAL SKILL:)
With ability to drive & operate forklift,mobile,light vehicle truck and crawler crane.
With ability to drive manual and automatic transmistion vehicle.
With knowledge in mechanical works for vehicle crane
With knowledge in Microsoft words and exel internet.etc.
I HEREBY CERTIFY THAT INFORMATION GIVEN IS TRUE AND CORRECT