Curriculum Vitae of

Manuel Bacaltos Marasigan

Home Address : ** ******* **.

Better Living Subdivision,

Paranaque City, M.M.

Philippines 1711

Email : acxfg8@r.postjobfree.com

Current Location : Philippines

Contact Number : +63 2 995 3428 (Landline)

+63-977-***-**** (Mobile)

I. JOB DESCRIPTION SUMMARY:

Twenty Five (25) years responsible EPC, EPCC and EPCI project experiences, technical services, front end engineering design (Pre-FEED and FEED) both for green and brown field projects, detailed engineering design, construction, mechanical completion and up to commissioning phase for High Voltage (HV) Medium Voltage (MV) and Low Voltage (LV) system voltages. Involved in factory and site acceptance test (FAT & SAT) of electrical and industrial equipments for Oil and Gas sector both offshore and onshore structures like: Petrochemical/refinery, Platforms, Jack-Up Rig and FDPSO, FPSO & FSO (Both for offshore/marine hull and topsides) and Accommodation. Conduct offshore/site inspection for existing FPSO’s, FSO’s, Platforms and Tanker. Attend both overseas and local meetings from kick-off meeting, technical clarification meeting, procurement meeting, construction meeting, mechanical completion meeting etc.

Responsible for power studies using ETAP software and preparing preliminary drawings like overall key one line diagram using AutoCAD software. Familiar with other software and database like: Microsoft Office, Lotus Notes, AutoCAD, AS400, Aconex, Hummingbird, Coreworx, Brava etc. Participate in 3D model review (PDMS), with other discipline like piping, instrumentations, packages etc.

Familiar with international standards like; IEEE, NEC, IEC, ABS, DNV, Norsok, Inmetro, Lloyds, ATEX, API, SOLAS, Colreg etc.

II. EMPLOYMENT RECORD:

ELECTRICAL ENGINEER CHEVRON THAILAND EXPLORATION AND PRODUCTION LTD.

19th Floor Tower III, SCB Park Plaza East, 19 Ratchadapisek Road, Kwaeng Chatuchak,

Khet Chatuchak, Bangkok 10900

Kingdom of Thailand

PROJECTS UBON FPSO/FSO Project (Thailand)

Chevron Thailand Exploration and Production Ltd (CTEP)/PTT Exploration and Production (PTTEP)

(April 2014 – November 2015)

BENCHAMAS-2 FSO Project (Thailand)

Chevron Offshore Thailand Ltd (COTL)

(April 2014 – November 2015)

Overall responsible for Electrical Front End Engineering Design (FEED) for these two Green Field FSO Project (including FPSO options for Ubon Project) for electrical power generation and distribution system, providing technical guidance and assistance to Chevron contractor during Pre-FEED and FEED stages.

Overall responsible in design concept for FPSO/FSO’s offshore/marine hull and topside electrical power generation and distribution system.

Update the Overall Single Line Diagram Drawing, Electrical Load List and Electrical Specification that prepared during FEED phase.

To make sure that the Chevron‘s Safety In Design (SID) specification and Incident Injury Free (IIF) culture are implemented on both projects.

Responsible for leading electrical engineering design to make sure overall project will achieve CAPEX and OPEX optimization, Preparing Specification (based from Chevron standard CES) and Datasheets writing. Attending overseas meeting with Contractors (from Japan and Korea)

To communicate with Chevron FSO Operation and Shipping Department for collecting their technical suggestions and comments for engineering design.

Review and comments on all BID documents and drawings submitted by Contractors during FEED stage, response from Contractors technical clarifications.

Attend both overseas and local meetings with main contractors, such as kick-off meeting, clarification meeting etc.

LEAD ELECTRICAL ENGINEER TECHNIP ENGINEERING (THAILAND) LTD.

20th Floor Suntowers Building A, 123 Vibhavadee-Rangsit Road, Jatujak, Bangkok 10900

Kingdom of Thailand

PROJECT UBON FSO Project (Thailand)

Chevron Exploration and Production Ltd./PTT Exploration and Production

(May 2013 – April 2014)

Responsible for Front End Engineering and Design (Pre-FEED & FEED) for this Green Field Ubon FSO project, prepared the Electrical Power Generation and Distribution System, to study the execution plan details including the activities required to complete the minimum scope of work and deliverables.

To prepare the FEED Study Report and the Power Generation and Distribution study report, Overview Single Line Diagram, Electrical Load List, Equipment List, Single Line Diagram, General Arrangement Equipment Layout (for various electrical equipment rooms) and Preliminary Lighting Layout for Accommodation.

Prepare additional specification for Electrical and Instrumentation Requirements for Packages.

Overall responsible for electrical integration design for UBON FSO offshore/marine hull and topside electrical power generation and distribution system.

To prepare specification based from existing Chevron Engineering Specifications (CES) for the new electrical equipments like: Switchboards, Transformers, GSP, UPS, Distribution Boards, LV Cables, Induction Motors, Soft Starter Panel, Variable Frequency Drive and Navigation Package Equipment, and considering the Chevron Safety in Design (SID) application for new electrical equipment layout.

Attend meetings with Chevron regarding Pre-FEED and FEED works.

ELECTRICAL LEAD ENGINEER KONGSBERG MARITIME ENGINEERING PTE LTD

81 Toh Guan Road East #04-01 Secom Centre

Singapore 608606

PROJECT UOTE FSO Project (Brazil)

Tanker Pacific Offshore Terminals (Singapore) - Petrobras

(April 2012 – March 2013)

Responsible for overall Electrical System Detailed Design, Engineering and Construction for UOTE FSO project by preparing specifications, technical requisitions, key single line diagram, power system studies, electrical load list, termination and block diagram drawings and reviewing the equipment specifications, datasheets, drawings etc.

Lead the group of engineers and designer for the said FSO project, attend project kick-off and engineering meetings related for the said project.

Overall responsible for electrical integration design for UOTE FSO offshore/marine hull and topside electrical power generation and distribution system.

Prepare the equipment layout inside Main Switchboard Room and Engine Room inside E-House, including lighting layout, cable routing, cable ladder routing, equipment support details (to be finalized by structural section), cable penetration (via MCT). Maintenance of each equipment will always be considered on the design.

SENIOR ELECTRICAL ENGINEER RUBICON OFFSHORE INTERNATIONAL

1 Harbour Front Avenue, Keppel Bay Tower # 14-05

Singapore 098632

PROJECTS CRYSTAL OCEAN FPSO Project (Mexico)

Blue Marine Company (September 2011 – April 2012)

INTREPID FPSO Project (Philippines)

Galoc Production Company WLL (March 2011 – Present)

VANTAGE FPSO Project (Thailand)

Salamander Energy (March 2011- September 2011)

BALNAVES FPSO Project – FRONT PUFFIN FPSO Apache Energy Limited (January 2011 to March 2011)

Responsible for Electrical “Technical Services” for Rubicon’s existing FPSO’s, conduct offshore inspection for refurbishment, maintenance and modifications. Prepare technical report based on the findings and conditions of the equipments on the said FPSO’s.

Responsible for Front End Engineering Design (FEED) for electrical power generation and distribution system for Balnaves FPSO, to study the execution plan details including the activities required to complete the minimum scope of work and deliverables.

Prepare the Power Management System (PMS) specification based on client’s requirements and existing equipments technical information (Generator Alternator and Incoming Feeder) for both Intrepid and Vantage FPSO. Conduct site inspection on the affected area on Intrepid FPSO for additional Turret Mooring System (TMS) modifications.

Prepare the study for replacement of MV/Control Umbilicals between FPSO Vantage and Wellhead Platform.

Study the vessel’s marine hull electrical system for integration between vessel topsides and hull systems.

Study the Scope of Work and Instructions, Basis of Design, Functional Specification, Operation and Maintenance Philosophy and standard HSE documents, existing Key One Line Diagram, Load List, Equipment List and Datasheets.

Conduct site visual inspection for Generators, Switchboards, MCC’s, Transformers, UPS, Navigational Aids System, Accommodations, MCT penetration, Lighting and Small Power Distribution Boards, Cable Routing, Cable Ladder/Tray Routing Layout, Navigational Aids System.

To prepare the FEED Study Report and the Power Generation and Distribution study report. Revised the Key One Line Diagram, Load List, Equipment List, Single Line Diagram and revised General Arrangement Equipment Layout (for electrical). To prepare specifications for the new Switchboards, Transformers, MCC, UPS, Distribution Boards, MV and LV Cables, Induction Motors, Electrical,Instrument and Telecom Package Equipment.

Responsible for Power Studies using “Electrical Transient Analysis Program (ETAP)” software, and preparing preliminary drawings like overall single line diagram using the AutoCAD software.

Check and monitor all As-Built drawings, and to make sure all changes during commissioning stages are captured.

Attend both overseas and local meetings with the Clients.

ELECTRICAL ENGINEER SWIFT DRILLING N.V. (Curacao Netherlands Antilles)

(including Instrument & Telecom) Drydocks World Nanindah

Jalan Brigjend Katamso, Tanjong Uncang, Batam, Indonesia 29342

PROJECT MONOHULL DRILLING RIG (Four Legged Jack-up Drilling Rig) Rig Swift 10 Hull 632 (January 2010 to November 2010)

Responsible for the yard engineering construction detailed design and drawings of Drilling Rig project, such as; installations of Generators, Switchboards, MCC, Transformer, UPS, Navigational Aids System, Jacking System, Mud and Utility Pump Motors, Machinery Equipments, Accommodations, MCT penetration, Lighting Design, Small Power, Cable Routing, Cable Ladder/Tray Routing Layout, Skidding system, Winch system, Fire & Gas System, Emergency Shutdown System, Public Address and General Alarm System (PAGA), Radio System, Talk Back System, Local Area Networking (LAN), Satellite System, Telephone System, Entertainment System, Navigational Aids System etc.

Conduct inspection upon receiving the “Request for Inspection” document from the yard/contractor, prepare a written report and/or punch list after the inspection and issue a “Site Instruction” to yard/contractor. Provide more information to the contractor regarding any technical problems may occur, and provide on the spot solution or proposal for the urgent matters.

To follow company’s health and safety environment (HSE) policy, and to be familiar with all company’s goals and objectives.

Review and approved the documents on purchasing bulk materials such as, cables, lighting, distribution boards, switches, socket outlets, multi-cable transit (MCT), cable glands, cable ladder/tray, junction boxes, local control station, trefoil cable cleats, cable ties, additional breakers etc.

To liaise with client (SHELL), and other engineering disciplines departments, not limiting to such as instrumentations, piping, structural, mechanical, accommodation, operation team etc. for the necessary interface control and coordination to attain the assigned objectives with the desired results.

Prepare the termination drawings, mechanical completion inspection and test report documents for all equipment, and issued site instructions and punch list as required.

Responsible for reviewing the Pre-commissioning Dossiers and preliminary checks /static tests on all electrical equipment and preparation of punch lists for pending items to achieve Pre-commissioning. Review of requirements for temporary equipment to facilitate Commissioning/Start-up activities, responsible of witnessing critical electrical pre-commissioning activities.

Responsible for the implementation and comments of OTP’s, review Start-up procedures.

Responsible for the identification and mobilization of electrical equipments and materials required for the operational tests, and supervise the commissioning/start-up activities of electrical systems.

Attend engineering, construction, mechanical completion meeting with the shipyard.

LEAD ELECTRICAL ENGINEER AFCONS-GUNANUSA JOINT VENTURE (AGJV)

25TH Floor, Menara HLA, 3 Jalan Kia Peng, Kuala Lumpur, Malaysia

PROJECT ICPR PROCESS PLATFORM Project

Oil and Natural Gas Corporation - India (July 2009 to December 2009)

To act as an Owner Representative and responsible for checking, approval and answering all technical clarifications regarding electrical equipments and mechanical equipment (required power supply), directly involved in front end engineering design (FEED) with AKER Solutions (Malaysia).

Responsible for engineering/design/construction for ICP-R Process Platform (EPCC) project, such as; electrical equipment (MV Switchgear, LV Switchboard, MV and LV Transformer, UPS, DB, Busduct etc.), lighting system, small power system, grounding system, cable ladder layout, MCC/Switchgear room equipment layout, battery room, navigational aids etc.

Prepare the equipment layout inside Main Switchboard Room (E-House) based on equipment size and dimensions (distance between equipment shall be apply in accordance with regulation), including lighting layout, cable routing, cable ladder routing, equipment support details (to be finalized by structural section), cable penetration (via MCT). Maintenance of each equipments will always be considered on the design.

Directly involved in the Technical Bid Evaluation (TBE) along with AKER Solutions for all electrical tag items, such as HV Switchgear, LV Switchboards, MCC’s, LV Busducts, HV and LV Transformers, AC and DC UPS System, Distribution Boards, Navigational Aids etc. and the final selection of equipments.

Responsible for issuing clarifications to ONGC, and act as a Focal Point for all electrical issues related.

To liaise with client (ONGC - India), and other engineering disciplines departments, not limiting to such as instrumentations, piping, structural, mechanical, accommodation, operation team and commissioning team etc. for the necessary interface control and coordination to attain the assigned objectives with the desired results.

Prepare the electrical design, calculations, specifications, material requisitions, datasheets etc. as per client(s) requirements, and prepare it for Inter-Discipline Check (IDC), Issue for Design, Issue for Inquiry and Issue for Construction.

Attend meetings with AKER Solutions (EPC Contractor) for detailed engineering works.

ELECTRICAL ENGINEER PROSAFE PRODUCTION SERVICES PTE. LTD.

1 International Business Park, #10-01 The Synergy, Singapore 609917

PROJECTS AZURITE FDPSO Project

Azurite Field Development Project (Congo)

Murphy West Africa Ltd. (January 2007 to June 2009)

Ningaloo Vision FPSO Project

Van Gogh Field Osshore Project

Apache Energy (March 2009 to June 2009)

UMUROA FPSO Project

TUI Area Development Project

Australian Worlwide Exploration (AWE) (January 2007 to March 2007)

Responsible for the detailed engineering design and overall electrical engineering/construction for FDPSO vessel, such as; electrical equipment (switchboards, transformer, DB, Busduct etc.) lighting system, small power system, grounding system, cable ladder layout, E-House equipment layout, battery room, nav-aids system etc.

To liaise with client (Muphy West Africa Ltd.), and other engineering disciplines departments, not limiting to such as instrumentations, piping, structural, mechanical, accommodation, operation team and commissioning team etc. for the necessary interface control and coordination to attain the assigned objectives with the desired results.

Prepare the electrical design, calculations, specifications writing, material requisitions, datasheets etc. as per client(s) requirements, and prepare it for Inter-Discipline Check (IDC), Issue for Design, Issue for Inquiry and Issue for Construction.

Prepare the equipment layout inside Power Distribution Module (E-House) based on equipment size and dimensions (distance between equipment shall be apply in accordance with regulation), including lighting layout, cable routing, cable ladder routing, equipment support details (to be finalized by structural section), cable penetration (via MCT). Maintenance of each equipments will always be considered on the design.

Prepare the single line diagram for existing and new Switchboards, MCC, UPS System, DB’s, etc. Prepare electrical typical installation details for lighting, small power, earthing, cable ladder etc. Pricing for each equipment will be included on the TBE.

Study the vessel’s marine hull electrical system for integration between vessel topsides and hull systems.

Prepare the Technical Bid Evaluation (TBE) for all major equipments such as; HV and LV Switchboards, MCC’s, HV and LV Transformer, UPS System, Navigational Aids System, Distribution Boards and HV Cables.

Prepare the Interconnection Wiring Diagram and Termination Diagram for all electrical systems based on equipment vendors drawing and documents.

Review other discipline package (related to electrical), attend FAT’s (overseas and local) and different kind of meeting such as; Engineering, Construction, Procurement, Vendor Kick-Off Meeting. Assist the Lead Electrical Engineer for other engineering works from time to time.

Function as a lead EX inspector for electrical, instrument and telecom system in the yard. To follow company’s health and safety environment (HSE) policy, and to be familiar with all company’s goals and objectives.

Check and monitor all As-Built drawings, and to make sure all changes during commissioning stages are captured.

Attend engineering, procurement, construction, mechanical completion and commissioning meetings.

SENIOR ELECTRICAL ENGINEER OIL & GAS SERVICES INDUSTRIES (S) PTE. LTD.

75 Haji Lane, Singapore 189268

PROJECTS KIKEH FPSO Project

Floating Production and Storage Offloading (FPSO)

Malaysian Deepwater Floating Terminal (MDFT) Limited

Single Buoy Moorings Inc. (SBM) (March 2006 – December 2006)

MAARI – RAROA FPSO PROJECT

Floating Production and Storage Offloading (FPSO)

OMV New Zealand Limited

Tanker Pacific Offshore Terminals Pte. Ltd. (July 2006 – Dec. 2006)

Responsible for the sub-contracting scope in electrical engineering construction works for KIKEH FPSO and MAARI-RAROA FPSO project such as; installations of topside modules, equipment skid, electrical equipment such as; switchboards, transformers, lighting, small power, distribution boards, cable ladder, earthing system etc.

Preparing the equipment layout for E-House and other electrical and instrumentation room. Prepare the cable routing, cable ladder/tray routing, electrical and instrumentation equipment supports, and other detailed construction and fabrication drawings.

To liaise with client(s), main contractor and other engineering disciplines departments, not limiting to such as quality control, project management team (pmt), proposal, project services etc. for the necessary interface control and coordination to attain the assigned objectives with the desired results.

To review all vendors drawings and documents related with electrical, to check all datasheets prepare by the vendors.

Overall responsible for all electrical issues, attending meetings in regards with the project, act as a Focal Point for these projects.

Issued site technical query (STQ), yard to purchase (YTP), and to monitor and ensure the work to be done by contractor/sub-contractorsly established to reflect all the required design details and to good fabrications and construction practices.

To monitor, maintain and develop good documentation control as a mean of measuring the effective implementation of engineering procedures.

To follow company’s health and safety environment (HSE) policy, and to be familiar with all company’s goals and objectives

Conduct yard visit and inspections together with the Clients, and prepare the written report regarding the inspection.

Responsible for reviewing the Pre-commissioning Dossiers and preliminary checks /static tests on all electrical equipment and preparation of punch lists for pending items to achieve Pre-commissioning. Review of requirements for temporary equipment to facilitate Commissioning/Start-up activities, responsible of witnessing critical electrical pre-commissioning activities.

Responsible for the implementation and comments of OTP’s, review Start-up procedures.

Responsible for the identification and mobilization of electrical equipments and materials required for the operational tests, and supervise the commissioning/start-up activities of electrical systems.

Attend all types of meeting regarding company’s scope.

LEAD ELECTRICAL ENGINEER / SIME DARBY ENGINEERING SDN. BHD.

ELECTRICAL ENGINEER (formerly known as Sime Sembcorp Engineering Sdn. Bhd.) PLO 336,

Jalan Suasa, P.O.Box 55, 81707 Pasir Gudang, Johor, MALAYSIA

PROJECTS BUNGA RAYA – E (BR-E) C02 Removal Platform

Talisman Energy Malaysia (July 2004 ~ February 2006)

YOHO DEVELOPMENT PROJECT EPC2 Production Facilities and Floating Storage and Offloading (FSO) Project (Nigeria)

Exxonmobil Corporation – USA (March 2002 – July 2005)

Responsible for leading yard electrical engineering, construction, fabrication, mechanical completions and commissioning works of BR-E CO2 Removal Platform project and YOHO FSO and Platform.

To monitor, maintain and develop good documentation control as a mean of measuring the effective implementation of engineering procedures.

To liaise with client(s), other engineering disciplines departments, not limiting to such as quality control, project management team (PMT), proposal, project services etc. for the necessary interface control and coordination to attain the assigned objectives with the desired result.

To prepare and monitor weight control report (WCR) for all electrical equipments.

To attend the factory acceptance testing (FAT) of electrical equipment purchased from vendors, to attend all types of meeting such as; coordination meeting (with client), construction meeting (with PMT and Sub-contractors), technical clarification and kick-off meeting (with procurement dept. and vendors).

Responsible preparing potential change order initiative (PCOI) and raised Site Technical Query (STQ) to clients for approval.

To follow company’s health and safety environment (HSE) policy, and to be familiar with all company’s goals and objectives

Prepares and review MTO and issue requisition for all the materials required under the scope of work. Evaluate quotations through technical queries and clarifications.

Review, approved and incorporate vendor data as part of IFC Drawing generation.

Coordinate with PMT for the execution and implementation of project design. Conducts field inspection for updating and revision of plans and discussion with PMT on implementation of revisions and modifications as requested by client.

Attend engineering, procurement, construction, mechanical completion and commissioning meetings.

SENIOR ELECTRICAL ENGINEER FUJIMI SERVICES LIMITED,

(and Pre-commissioning Works) Unit 11 Ground Floor, Kin On Bldg, 16-20 Kennedy st. HONGKONG

PROJECT EQUESTRIAN CLUB OF RIYADH

King Abdullah – Kingdom of Saudi Arabia (March 2000 – March 2002)

Functions as Senior Electrical Engineer for the system design, construction and commissioning for broadcasting and racing technical system (RTS), front-end, technical specifications development and detailed engineering packages required by clients.

Responsible for the material take-offs, RFQs, technical evaluation, client interface required in the tender packages for various racing course projects of Fujimi Services Limited.

Bid duties involving site visits, pre-bid coordination, material take-off from drawings, CADD works, preparation of bill of quantities, review of technical documents, engineering & calculation works and prepare analysis report.

Reporting direct to technical director for whatsoever important technical matters to be discussed.

Engineering support (during construction) duties involving site visits, site coordination, permanent assignment to site and engineering advice during project design and construction implementation.

Testing and Commissioning of racing technical services such as large screen tv, public address, broadcasting camera, audio and video console and, satellite disc.

Testing and commissioning of generator, switchgear, switchboards, mcc’s and transformers.

ELECTRICAL/INSTRUMENTATION SAUDI ARABIAN OIL COMPANY (Saudi ARAMCO),

ENGINEER Contel Federal Systems, P.O.Box 888, Al-khobar 31952,

KINGDOM OF SAUDI ARABIA

PROJECTS AL-KHAFJI JOINT OPERATION BUSINESS PACKAGE II PROJECT,

Saudi-ARAMCO, Kingdom of Saudi Arabia (April 1999 ~ February 2000)

SAFANIYAH FIELD, POOL 145 PROJECT,

Saudi-ARAMCO, Kingdom of Saudi Arabia (July 1998 ~ April 1999)

Functions as Electrical / Instrumentation Engineer for the engineering and construction of Al-Khafji Refinery. front-end engineering design (FEED), technical specifications development and detailed engineering packages required by the company.

Functions as Electrical Engineer for the engineering and construction of ABS F70, AD-17 Project and Safiniyah Field Pool 145 Project, detailed engineering packages required by the company.

Responsible for the material take-offs, RFQs, technical bid evaluation, client interface required in the tender packages for various projects of Saudi ARAMCO.

Bid duties involving site visits, pre-bid coordination, material take-off from drawings, Microstation, preparation of bill of quantities, review of technical documents, engineering & calculation works and prepare analysis report.

Engineering and design calculation works includes grounding, cable tray, lighting, power, cable schedule, LV and MV electrical equipment layout/specifications, engineering studies and MTO.

Coordinate with other disciplines in producing the project design package within the time schedule. Provides technical and project management assistance during the construction phase. Approves contractor material submittals and recommends material replacement, if required.

Attend engineering, procurement, construction, mechanical completion meetings.

ELECTRICAL ENGINEER/DESIGNER KTA TENAGA SDN. BHD, Plaza Kelanamas,

19 Lorong Dungun, Damansara Heights, Kuala Lumpur, MALAYSIA

PROJECT PETRONAS SECOND REFINERY (PSR-2),

Petroliam Nasional Bhd. (Petronas) - Malaysia (July 1995 ~ May 1998)

Functions as Electrical Design Engineer / Designer, responsible in preparation of basic engineering/design calculations for oil & gas refinery project.

Electrical equipment sizing such as; Cable sizing, Grounding Mesh, Lighting Lux, Distribution Boards, Breakers etc.

To prepare Single Line Diagram for MV/LV/UPS, Schematic Diagram for MV and LV, Installation layout and detailed design drawing.

Engineering design and calculation works includes electrical distribution system, lighting, small power, cable ladder/tray, cable routing, heat tracing system, cable schedule, interconnection wiring diagram, conceptual design and project proposals.

Produces electrical design work and calculations in conformance to IEC, Petronas technical standards (PTS), etc. Provide drawing mark-ups and final design layout and check the drawings by using Auto-CAD.

Responsible for discipline squad check, vendor data evaluation, client interface, scheduling and project execution plans.

Coordinate with other disciplines in producing the project design package within the time schedule. Provides technical and project management assistance during the construction phase.

Conduct site inspection during construction and installations for all electrical equipments and bulk items.

Responsible for Power Studies using “Electrical Transient Analysis Program (ETAP)” software, and preparing preliminary drawings like overall single line diagram using the AutoCAD software.

Attend engineering and procurement meetings with the client.

SITE ENGINEER/DESIGNER G.P.Zachariades (Overseas) Ltd, Sehla Road,

P.O.Box 5632 Manama, State of BAHRAIN

PROJECTS BAHRAIN TELECOMMUNICATION COMPANY (BATELCO)

Batelco – State of Bahrain (November 1994 ~ June 1995)

DHL - NEW SORTING FACILITY, Bahrain International Airport

State of Bahrain (February 1994 ~ November 1994)

THE RITZ-CARLTON HOTEL

(Formerly known as Le Royal Meridien Hotel)

State of Bahrain (February 1992 ~ February 1994)

Functions as Site Electrical Engineer/Designer, responsible in preparation of construction and shop drawings based on designed drawings from the consultants. Supervised electrical installation in accordance to consultants approved for construction drawings.

Responsible of assisting all subcontractors to their work to be done on site and coordinate with other disciplines services to avoid clashing on site.

To attend construction, clients, coordination meeting, and conduct internal meeting with site supervisors, site foreman and subcontractors.

Coordinate with electrical vendors for installation on site and raised clarification letter and return vendor’s proposal with or without comments.

Responsible to prepare as-built drawings and final documentation to submit with the consultants.

To monitor, maintain and develop good documentation control as a mean of measuring the effective implementation of engineering procedures, and to issue site instruction and site modification letter to the site.

Supervise the team of site foreman and site supervisors and