CURRICULUM VITAE
*. Proposed Position: Resident Engineer
2. Name of Firm: CEMMATS GROUP Limited
3. Name of Staff: Rolandcy Endymion Williams
4. Date of Birth: May 9th 1963
5. Nationality: Sierra Leonean
6. Education: - 1991 Diploma in Civil Engineering - FourahBay
College (USL) AutoCAD and Survey- Mouchel
Parkman, London Liverpool Office
7.Other Training: 2005 - Did a two months training on Auto cad and
Surveying with Mouchel Parkman at their Liverpool office
8.Country of Work Experience: Sierra Leone
9.Languages: English, Krio
10.Employment Record:
From: 2013 To: 2013
Employer: CEMMATS Group Ltd. / Sierra Rutile Ltd.
Position held: Design Engineer
From: 2012 To To: 2013
Employer: CEMMATS Group Ltd. / Sierra Rutile Ltd.
Position held: Design Engineer
From: 2011 To:2012
Employer: CEMMATS Group Ltd. / Koidu Holding Ltd.
Position held: Project Manager
From: 2010 To:2011
Employer: CEMMATS Group Ltd. / Bintumani International
Position held: M & E Engineer
From r: 2010
Employer: CEMMATS Group Ltd. / Gamico Ore Mines The Gambia
Position held: Plant Design Engineer
From: 2010
Employer: CEMMATS Group Ltd. / London Mining
Position held: Design Engineer
From: 2010
Employer: CEMMATS Group Ltd. / Sierra Rutile Ltd.
Position held: Design Engineer
From: 2009 To: 2013
Employer: CEMMATS Group Ltd. / Plaza and Transport t - Makeni.
Position held: Structural Engineer
From: 2009 To: 2010
Employer: CEMMATS Group Ltd. / London Mining
Position held: Design Engineer
From: 2009
Employer: CEMMATS Group Ltd. / Bintumani International
Position held: E & E Engineer
From: 2009
Employer: CEMMATS Group Ltd. / Makeni shopping mall and Transport
Position held: Structural Engineer
From: 2008
Employer: CEMMATS Group Ltd. / Sierra Rutile
Position held: Design Engineer
From: 2006 To: 2008
Employer: CEMMATS Group Ltd. / Sierra Rutile
Position held: Design Engineer
From: 2005 To: 2008
Employer: CEMMATS Group Ltd. / SL Minerals
Position held: Design Engineer
From: 2006
Employer: CEMMATS Group Ltd. / Regimanuel Gray
Position held: Quary Engineer
From: 2005 To: 2006
Employer: CEMMATS Group Ltd. / Sierra Rutile
Position held: Design Engineer
From: 2005 To: 2006
Employer: CEMMATS Group Ltd. / NASSIT
Position held: Design Engineer
From: 2005 To: 2006
Employer: CEMMATS Group Ltd. / NASSIT Sierra Leone
Position held: Design Engineer
From: 2005
Employer: CEMMATS Group Ltd. / Mouchel Parkman
Position held: Student Engineer
From: 2005
Employer: CEMMATS Group Ltd. / Republic of Liberia.
Position held: Design Engineer
From: 2004 To:2005
Employer: CEMMATS Group Ltd. / Mouchel Parkman of London
Position held: Design Engineer
From: 2004 To: 2005
Employer: CEMMATS Group Ltd. / Mouchel Parkman of London
Position held: Design Engineer
From: 2002 To: 2003
Employer: CEMMATS Group Ltd. / Special Court
Position held: M & E Engineer
From: 2002 To:2003
Employer: CEMMATS Group Ltd. / SALWACO
Position held: M & E Engineer
From: 2002
Employer: CEMMATS Group Ltd. / Freetown Cold Storage Company
Position held: Design Engineer
From: 2001 To: 2002
Employer: CEMMATS Group Ltd. / Central Bank of Sierra Leone
Position held: M & E Engineer
From: 2001
Employer: CEMMATS Group Ltd. / Government of Sierra Leone
Position held: M & E Engineer
From: 2000
Employer: CEMMATS Group Ltd. / World Bank
Position held: Auto Cad Engineer
From: 1999 To: 2000
Employer: CEMMATS Group Ltd. / Mobil Oil Company of Sierra Leone and Exxon Oil
of the United States
Position held: Auto Cad Engineer
From: 1991 To: 1999
Employer: Guma Valley Water Company
Position held: Engineering Superintendent
11.Detailed Tasks Assigned
12.Work Undertaken that Best Illustrates Capability to Handle the tasks Assigned
Name of Assignment or project: Land plant project
Year: 2013
Location: Sierra Rutile
Client: Sierra Rutile Ltd. Mining Company
Main Project features: Design upgrade for Sierra Rutile
Positions Held: Design Engineer
Activities Performed: Design of new plant drawings & supervising construction
Name of Assignment or project:
Year: 2012 – 2013
Location: Sierra Rutile
Client: Sierra Rutile Limited
Main Project features: Design or Sulphur Reduction Plant
Positions Held: Design Engineer
Activities Performed: Design of new plant
Name of Assignment or project: Kono Reconstruction Action Plan (RAP)
Year: 2011 – 2012
Location:
Client: Koidu Holdings SA Ltd.
Main Project features: resettlement and reconstruction of affected property owners due to mining activities
Positions Held: Project Manager
Activities Performed: Design of houses, churches, Mosques,
schools etc, supervise construction
Name of N Name of Assignment or project: M & E works Bintumani Conference Centre
Year: 2010 – 2011
Location: Freetown
Client: NASSIT
Main Project features: Design and Supervision M & E works Bintumani International Conference Centre
Positions Held: M & E Engineer
Activities Performed: Design of M & E equipment and
drawings including supervision
Name of Assignment or project: Sierra Rutile Dredge
Year: 2010 – 2010
Location: Rutile
Client: Main Project features: Flowsheets for Dredge No 2. 500 – 550 tph dredge and supervision
Positions Held: Design Engineer
Activities Performed: To design material flow for the 500-
500tph dredge and supervision
Name of Assignment or project: Mobile Plant
Year: 2010
Location: Freetown, Sierra Leone
Client: Gamico Ore Mines The Gambia
Main Project features: Design flowsheet for Gamico Ore Mines The Gambia
Positions Held: Design Engineer
Activities Performed: To design material flow, plant assembly
etc.
Name of Assignment or project: LMC Jetty Project
Year: 2010
Location: Freetown
Client: London Mining
Main Project features: Design for potable water London Mining at their Jetty and Marampa mines sites
Positions Held: Design Engineer
Activities Performed: Design water connection from source to plant site. Design of Jetty structure at Tofeyim
Name of Assignment or project: L.M.C. Jetty Project
Year: 2010
Location: Freetown
Client: LMC
Main Project features: Design of Tawfeyim Jetty Earthworks
Positions Held: Design Engineer
Activities Performed: Road, Jetty Structure, etc
Name of Assignment or project: Shopping Malt Transport Terminal
Year: 2009 – 2013
Location: Makeni
Client: NASSIT
Main Project features: Structural drawings and supervision
for Shopping Plaza and Transport terminal in Makeni.
Positions Held: Structural Engineer
Activities Performed: Building design structure and
supervision
Name of Assignment or project: LMC Jetty Project
Year: 2009 – 2010
Location: Freetown
Client: London Mining
Main Project features: Design of Barge loading facilities at Tawfeyim port for London Mining
Positions Held: Design Engineer
Activities Performed: Design of jetty structure for Barge
loading
Name of Assignment or project: LMC Jetty Project
Year: 2009 – 2010
Location: Freetown
Client: London Mining
Main Project features: Marine studies for London Mining Ore transshipment from Port Loko Creek to Fairway Bouy
Positions Held: Design Engineer
Activities Performed: Design route for ship and barge to move ore to and from jetty structure
Name of Assignment or project: rehabilitation of the new
Bintumani International Conference Center Aberdeen
Year: 2009
Location: Aberdeen
Client: Bintumani International
Main Project features: M & E Design and supervision for the
rehabilitation of the new Bintumani International Conference
Center Aberdeen
Positions Held: M & E Engineer
Activities Performed: Design of mechanical & Electrical
equipment in building
Name of Assignment or project: Shopping Malt & Transport Terminal
Year: 2009
Location: Makeni
Client: NASSIT
Main Project features: Design and Structural details of
Makeni shopping mall and Transport terminal
Positions Held: Structural Engineer
Activities Performed: Design building structures.
Name of Assignment or project: Office Complex for CEMMATS Group
Year: 2009
Location: Freetown
Client: CEMMATS Group
Main Project features: Design and Supervision of a Le250,
000,000/00 (250Million Leones) office complex for
CEMMATS Group
Positions Held: Maintenance Engineer
Activities Performed: Design and Supervision and
Construction of office complex for CEMMATS Group.
Name of Assignment or project: SRL Dredge 3 Project
Year: 2008
Location: Rutile
Client: Sierra Rutile
Main Project features: Construction Supervision for a third
dredge at Sierra Rutile
Positions Held: Engineer
Activities Performed: Supervision of dredge construction.
Name of Assignment or project: SRL - LPU
Year: 2006 – 2008
Location: Sierra Rutile
Client: SRL
Main Project features: Design and upgrading of plants a Sierra Rutile
Positions Held: Design Engineer
Activities Performed: Design of new plant, drawings and
Supervision of Construction.
Name of Assignment or project: Technical Survey
Year: 2005- 2008
Location: Sierra Leone
Client: SL Minerals
Main Project features: SL Minerals did geo technical survey in all of their mining areas and Plotting the areas.
Positions Held: Design Engineer
Activities Performed: Drafting of Survey plots.
Name of Assignment or project: Regimanuel Quary Project
Year: 2006
Location: Adonkia, Sierra Leone
Client: Regimanuel Gray
Main Project features: Supervision on construction of a Quarry and suitable blasting equipment for Regimanuel Gray
Positions Held: Design Engineer
Activities Performed: Supervision of Quary, Identifying suitable explosive for mining process.
Name of Assignment or project: SRL D2
Year: 2005 – 2006
Location: Sierra Rutile
Client: Sierra Rutile Ltd.
Main Project features: Drawings for second dredge at Sierra Rutile
Positions Held: Design Engineer
Activities Performed: Corrections to drawings of dredge design.
Name of Assignment or project: : M&E drawings for a twenty storey building
Year: 2005 – 2006
Location: Freetown
Client: NASSIT
Main Project features: M&E drawings for a twenty storey building on behalf of NASSIT
Positions Held: Design Engineer
Activities Performed: Design of Mechanical & Electrical Equipment in the building.
Name of Assignment or project: M&E Drawings and supervision for the rehabilitation of Old Parcel Post building
Year: 2005 – 2006
Location: Freetown
Client: NASSIT Sierra Leone
Main Project features: M&E Drawings and supervision for the rehabilitation of office block on behalf of NASSIT Sierra Leone
Positions Held: Design Engineer
Activities Performed: Re-designing of Mechanical and Electrical equipments in the building.
Name of Assignment or project: Auto Cad drawings for the rehabilitation of Electrical power supply
Year: 2005
Location: Freetown
Client: Republic of Liberia
features: Auto Cad drawings for the rehabilitation of Electrical power supply to the Republic of Liberia
Positions Held: Auto Cad Engineer
Activities Performed: Produce electrical drawings for power supply to Liberia
Name of Assignment or project: the rehabilitation of the International Airport Lungi in Sierra Leone
Year: 2004- 2005
Location: Sierra Leone
Client: Sierra Leone Government
Main Project features: Did drawings for the rehabilitation of the International Airport Lungi in Sierra Leone, a joint project between Mouchel Parkman of London & CEMMATS Group.
Positions Held: Design Engineer
Activities Performed: Drawings for the rehabilitation of the Airport 3.5km runway
Name of Assignment or project: Bo-Kenema, Makeni- Matotoka Highway,
Year: 2004- 2005
Location: Sierra Leone
Client: Sierra Leone Government
Main Project features: Did drawings for the Bo-Kenema, Makeni- Matotoka Highway, a joint project between Mouchel Parkman of London & CEMMATS Group.
Positions Held: Design Engineer
Activities Performed: Design of Highway road structure
Name of Assignment or project: World Bank Project
Year: 2002-2003
Location: Special Court Building in Sierra Leone
Client: World Bank
Main Project features: Did the M&E drawings & supervision for the Special Court Building in Sierra Leone, which included the Hot & Cold water systems, Air conditioner duct work, Hydrants etc.
Positions Held: Design Engineer
Activities Performed: Drawings for Mechanical and electrical equipment in building and supervision
Name of Assignment or project: World Bank Project
Year: 2002-2003
Location: Sierra Leone
Client: SALWACO
Main Project features: Did drawings for a gravity water supply project on three schemes in Sierra Leone for SALWACO.
Positions Held: Design Engineer
Activities Performed: design of weirs, concrete tanks, pipe line, filtration system, pipes on bridges, etc.
Name of Assignment or project: Rehabilitation of the Freetown Cold Storage Company manufactures of soft drink in Sierra Leone.
Year: 2002
Location: Sierra Leone.
Client: Freetown Cold Storage
Main Project features: Did drawings & supervision for the rehabilitation of the Freetown Cold Storage Company manufactures of soft drink in Sierra Leone.
Positions Held: Design Engineer
Activities Performed: We installed a new washer, mixer, bottling plant etc.
Name of Assignment or project: Bank of Sierra Leone Project
Year: 2001-2002
Location: Sierra Leone
Client: Central Bank of Sierra Leone
Main Project features: Did M&E drawings & supervision for the Central Bank of Sierra Leone to four (4) floors which was burnt by rebels during the war.
Positions Held: Design Engineer
Activities Performed: Redesigning of mechanical and electrical equipment in building and supervision
Name of Assignment or project: Rehabilitation of the House
of Parliament
Year: 2001
Location: Sierra Leone.
Client: The Chinese Construction Company
Main Project features: Did M&E drawings on Auto Cad for
the rehabilitation of the House of Parliament, on behalf of the
Government of Sierra Leone. The Chinese construction
company did the construction
Positions Held: M & E Engineer
Activities Performed: Design and supervision of the House of
Parliament.
Name of Assignment or project: World Bank project
Year: 2000
Location: Sierra Leone
Client:
Main Project features: Produce drawings for two major
hospitals in Sierra Leone for their rehabilitation & improvement
on their facilities in Auto Cad.
Positions Held: Auto Cad Engineer
Activities Performed: Produce drawings for hospitals, M & E
designs for hospitals.
Name of Assignment or project: Mobil Oil Project
Year: 1999 – 2000
Location: Freetown
Client: Mobil Oil
Main Project features: Did survey & auto-cad drawings for the merger between Mobil Oil Company of Sierra Leone and Exxon Oil of the United States
Positions Held: Auto Cad Engineer
Activities Performed: Survey the entire Mobil structures, and
reproduce in Auto Cad
Name of Assignment or project: Guma Valley Project
Year: 1991
Location: Western Area
Client: Guma Valley Water Company
Main Project features: Water supply to Resident
Positions Held: Engineering Superintendent
Activities Performed: Water supply to Resident
13. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any wilful misstatement described may lead to disqualification or dismissal, if engaged.
Date:
[Signature of staff member or authorised representative of the staff] Day/Month/Year
Full name of authorized representative: : Rolandcy Endymion Williams