Resume

Sign in

Power Plant Operator

Location:
Karachi, Sindh, Pakistan
Salary:
50000 pak rupees
Posted:
October 31, 2016

Contact this candidate

Applying For Power and process Plant Operator

MUHAMMAD SALEEM

CELL NO : 0092-333-******* & 0092-301-*******

Email : acxbeg@r.postjobfree.com

Address : House No. A-570, Phase-1, Ghulshan-e-Hadeed, Karachi

OBJECTIVE

“To get assignment which fully utilize my capabilities to attain job satisfaction and life time career by working with dynamic, productive team and where I can utilize my skills effectively and efficiently through all my best knowledge, experience and great effort”.

PROFESSIONAL EXPERIENCE 02 YEARS

Currently Working as a POWER PLANT OPERATOR at Lotte Chemical Pakistan Ltd (Formerly ICI Pakistan PTA Plant) since 2014. A member of KPC (Korean Petrochemical Company) is the only one producer of Terephathalic Acid in Pakistan.

WORKING EXPERIENCE AT LOTTE CHEMICAL PSKISTAN LTD. CO-GENERATION SECTION EXPERIENCE

As Plant Field Operator at Co-generation power plant and its utilities. Main equipment’s are,

GE-LM 6000 PD sprint gas Turbine. (48.0MW) By General Electric Company with Heat Recovery steam generation 52 ton/hr steam capacity and its Auxiliaries.

Natural gas Booster Compressor control through HMI, having 50 bar and 12mmcfd desing.

Instrument Air compressor and Dryer

RESPONSIBILITIES

As field operator OF POWER AND UTILITY my responsibilities are as under,

Troubleshooting, Control and monitor auxiliary equipment, such as Turbine lube oil, generator Lube oil, Hydraulic oil System water wash system and jacking oil system, Ventilation Fans and seal air blower, oil exchangers and separators, Demineralize water system and sprint system.

Many times water wash activity handling.

Operate Natural Gas Booster compressor from HMI, record parameters, troubleshooting.

Collect Samples of HRSG feed water, Steam Condensate Sample and CBD Sample.

Report any abnormalities to respected Shift Manager and Board Man. PROCESS PLANT SECTION EXPERIENCE

Lotte Chemical Pakistan Ltd. It is a world-class supplier of purified Terephthalic acid, an essential raw material used in the polyester industries... I was also worked at Oxidation Plant consists of following sub units. AIR COMPRESSOR (DEMAGE DELAVEL)

It is a six multi stage centrifugal compressor driven by 20 MW synchronous types motor which is connected with two gas turbines, which shares 8 MW power. Compressor has a design flow of 202 tons/hour & 22 bar pressure.

AIR COMPRESSOR (ATLAS COPCO)

It is another four multi-stage centrifugal compressor. It has a design flow of 10 tons/hour & 24 bar pressure. It also operates &controls through PLC.

SWING BED ADSORBTION TOWER WITH TWO PHASE SEPERATOR

It is a swings bed adsorption tower where off gases at 15 barg is dried up to -50 to -60C dew point. It has a continuous bed of denstone on alumina (adsorbent balls). It is also operated through PLC. DRYER SECTION

This section mainly consists of 65 tons rotary steam tube dryer where CTA powder is dried. RESPONSIBILITIES

As Field operator PROCESS PLANT my responsibilities are as under

Generate the work order and closely follow up with shift in charge and other department supervisor till the jobs get complete (Maximo).

Preparation of Plant Isolation Plans and handover of plant for maintenance.

Experience of co-ordination with instrument, electrical and mechanical personnel and hand over of jobs through PTW system.

Performing duty as an Authorized Gas Tester for Confined space entry and hot work to check the atmospheric condition is safe for the task.

Prepare shift report and communicate to next crew to ensure that necessary information is communicated in an effective manner.

Provide training and guidance to National Apprentice/New Employee to enhance their development. TRAINING

Permit to work system (cold-work, hot-work, entry-permit, excavation).

Fire firefighting training.(Fire Hose Reel)

Fire-Extinguishing system (CO2, DCP, Foam trolley, Deluge system, Fusible tube)

Audit of safety equipments.

JOB QUALLIFYING PROGRAM (JQP)

Passed from LOTTE Pakistan PTA Ltd during apprenticeship. QUALIFICATION

Degree Percentage Year Institute

B. Sc. (Math, Physics, Chemistry) 62.8% 2015 Shah Abdul Latif University khairpurs

F. Sc. (Pre-Engineering) 65.0 % 2012 B.I.S.E. Sukkur Matriculation 62.2 % 2010 B.I.S.E. Sukkur

APPRENTICESHIP TRAINING

2 years Apprenticeship Training at LOTTE CHEMICAL PAKISTAN LTD. from October 2014 to October 2016. PERSONAL INFORMATION

Father’s Name Bangul Soomro

Date of Birth 15-October-1994

Passport Number FW5757961

N.I.C. Number 45101-6699796-9

Nationalty Pakistani

Domicile District Ghotki

Marital Status Single

Religion Islam

Notice Period one month or less

Permanent Address Raharki, Tehsil Daharki, District Ghotki, Sindh, Pakistan.



Contact this candidate