Post Job Free

Resume

Sign in

Engineer Construction

Location:
Riyadh, Riyadh Province, Saudi Arabia
Salary:
2500000
Posted:
October 29, 2016

Contact this candidate

Resume:

*

REHMATULLAH UMARA KHAN

PERSONAL

Nationality Pakistani

Date of birth 02/01/1964

Religion Islam

Marital status Married

Phone 009***********

E-mail acxam5@r.postjobfree.com

Objectives

To join an organization where my technical experience and creative skills can be utilized. QUALIFICATIONS

Bachelor of Engineering (Electrical) in grade “A” in the year 1993, from Mehran University of Engineering & Technology, Jamshoro, Sindh, Pakistan. Summary

I have high profile Projects Management, Substation Construction Management. Managed several mega projects related to the field of transmission & distribution electric substations construction in United Arab Emirates& Kingdom of Saudi Arabia Managed the projects from kick off meeting till FAC. Managed but not limited to Engineering & design (Design, Base design, Detail design), Material Procurement & Supply, Civil, Structural

& finishing works, site works execution, installation, erection, testing and commissioning, punch

/snags closing and overall construction management. Apart from above I have site supervision & inspection expert level experience in hands in the field of medium Voltage, high Voltage and extra high Voltage transmission & distribution substations construction, electric grid stations (Outdoor & Indoor) construction. I worked with the world reputed and well-known companies and authorities like Dubai Electricity & Water Authority (DEWA) Dubai, United Arab Emirates, Sharjah Electricity and Water Authority & Palace Consulting Engineers Kingdom of Saudi Arabia. Specialties: Project Management, Substation Construction 2

Projects in Saudi Arabia

Palace Consulting Engineers (Saudi Electricity Company) Expansion of Safaniyah 380 KV BSP in Eastern Region (E.O. A) Of Saudi Arabia

(January 2016 – Till Date)

Main Contractor: SIEMENS

GIS Manufacturers

380 KV gas insulated switchgears (SIEMENS)

Construction of New 132/13.8kV Substation Roikbah Najran in Southern Region of Saudi Arabia (June 2014 – December 2015)

Main Contractor: ABB

GIS Manufacturers

132 KV AIS (Dead Tank Circuit Breaker) out door (make ABB) 13.8 KV gas insulated switchgears (make ABB)

Construction of Makah North 380/110/13.8 KV BSP Project, Makah, Saudi Arabia

(November 2012 – May 2014)

Main Contractor: AL THUKHI

GIS Manufacturers

380 KV gas insulated switchgears (Make HYOSUNG)

110 KV gas insulated switchgears (Make H HYOSUNG)

13.8 KV gas insulated switchgears (Make: ABB

Construction of Jeddah North West 380/110/13.8 KV BSP Project, Jeddah, Saudi Arabia (July 2011 – October 2012)

Main Contractor: AL OSAIS

GIS Manufacturers

380 KV gas insulated switchgears (Make Areva).

110 KV gas insulated switchgears (Make Hyundai)

13.8 KV gas insulated switchgears (Make: Schneider) JOB RESPONSIBILITIES

Supervision of Erection/ installation work, testing and commissioning of 380kv gas insulated switchgears Supervision of erection/installation work, testing and commissioning of 110kv gas insulated switchgears Supervision of erection/installation work, testing and commissioning of 13.8 kV gas insulated switchgears Power transformer erection/installation and testing and commissioning up to 500MVA Erection/installation of AC/DC panels and batteries and chargers Testing and commissioning of control and protection panels for the transmission substations up to 380kV Installation, testing and commissioning of Capacitor banks up to 7MVA. Arranging weekly & bi-weekly meetings with contractor and concerned divisions in order to solve problems incurred during the design, construction, testing & commissioning, and project handover stages

Preparation of weekly & monthly reports for site activities and addressing related issues to the 3

management.

Inspection of materials and equipment’s arriving on site i.e. earthing material, GIS, switchgear, Power transformer, battery and battery charger, Auxiliary Transformer, Relay & control Panels, RTU, Tele-protection equipment, Communication equipment. Follow up the site activities for on-time completion of Electrical works to start & complete the electrical installation and to start and finish the testing & commissioning activities. Setting Out Project Target Dates, Planning System Outages. Evaluating the invoices submitted by the contractor. Evaluating the performance of the contractor.

Making sure the site arrangement of the contractor strictly as per Standard Operating Procedure (SOP) that safety procedures being followed. Projects in UAE

Sharjah Electricity & Water Authority – SEWA (December 2003 – June 2011) MY ROLE:

Projects Engineer with SEWA

Construction of 132/11kV Industrial area no.17 Substation Sharjah Construction of 132/11kV substation Hamriya Sharjah, United Arab Emirates Worked as Site Electrical Project Engineer in Sharjah Electricity & Water Authority.

My main duties and responsibilities were as under

As site engineer responsible for supervision of erection, testing and commissioning of extension works including installation of 132/11kv substations.

Commissioning work at 132/11KV substation.

SF6 Gas Handling & Filling job supervision.

Site testing of 132KV GIS & 11KV switchgears for s/s.

Site Investigation, Data collection, Report preparation.

Review approved contractor’s submittals; drawings, calculation, layouts and detailed engineering documents on GIS, transformers, CT, PT, cables, batteries etc. and assure design implementation at site.

Controlling of works according to the specifications and contract.

Progress monitoring of Contractor in line with agreed time schedule.

Review of Contractor’s invoice in line with progress of site works. Dubai Electricity and Water Authority - DEWA (July 1999- November2003) MY ROLE:

Operation Engineer in System Operation Department

Assistant Load Despatcher in System Operation Department 4

Worked in the System Operation Department as an Operation Engineer in Dubai Electricity & Water Authority. My main duties and responsibilities were as under:

Monitoring of 400/132/33/11-6.6 kV substations.

Operation of 400KV, 132 KV, 33KV, 11KV and 6.6KV different switchgears.

Outages and normalization of 33kv, 11kv, and 6.6kv bus bars routine maintenance.

Outages and normalization of 33kv, 11kv, and 6.6kv CB and sealing end maintenance.

Outages and normalization for introducing 11kv and 6.6kv new substations.

Outages and normalization for cable route tracing.

Outages and normalization of 11kv and 6.6kv transformers.

Live phasing on 11kv and 6.6kv circuits.

Voltage conversion from 6.6kv to 11kv.

Commissioning of 11kv and 6.6kv substations.

Operation of Ring main Units at voltage level from 6.6KV to 11KV level, i.e. (RMU’s types) Lucy, Effacec, Ormazable, L&C, Siemens, EMC & MGR. Alamdar Engineering Private Limited (March 1995 – December 1998) Construction, Erection, Testing &Commissioning of 220/132 KV Substation Vehari Construction, Erection, Testing & Commissioning Of 500 /220 KV Substation Sheikh Muhammadi Peshawar.

My Role

Assistant Engineer with Alamdar Engineering Private Limited. Job Responsibilities

Supervision of Erection/ installation work, testing and commissioning of 500 kv, 220 kv and 132 kv switchgears

Power transformer erection/installation and testing and commissioning up to 500MVA Erection/installation of AC/DC panels and batteries and chargers Erection/installation, Testing and commissioning of control and protection panels for the transmission substations up to 500kV

Arranging weekly & bi-weekly meetings with contractor and concerned divisions in order to solve problems incurred during the design, construction, testing & commissioning, and project handover stages

Preparation of weekly & monthly reports for site activities and addressing related issues to the management.

5



Contact this candidate