Post Job Free
Sign in

Engineer Electrical

Location:
India
Salary:
4lpa
Posted:
January 10, 2017

Contact this candidate

Resume:

Mr. Subhajit Mondal

Contact no.: +919*********/+918*********

Email: ******.**********@*****.***

Career Objective:

Intend to build a career with leading industrial firm that helps me nurture my technical skills, maintenance skills and attain responsible position according to my capabilities and learning abilities.

Experience Summary:-

1.Currently Working for Sudeshna Enterprise from June 2016 as an Electrical Maintenance Engineer in WRM(Wire Rod Mill) of ISP(SAIL).

Key Responsibilities:-

Maintenance of Electrical Panels & motors of 690V,415V, 3.16KV.

Maintenance of Electrical Drives(ABB ACS800) installed in the mill and cranes.

Take the readings of Transformer, PCC, MCC & Electrical Drives.

Analyse and Handle the Faults during Rolling of Mill.

To identify the Locations of various instruments installed in the mill, verify the specifications of the spares with datasheets of manufacturers.

Handling of Procurement of Electrical spares, Materials Planning and Verification of Material at site.

2. Two years working experience of Ferro Struct Engineers from June, 2014 to May,2016 as an Electrical Maintenance Engineer in WRM(Wire Rod Mill) of ISP(SAIL). .

Academic Synopsis:-

S.N

Course

College/School

University/Board

% / CGPA

Year of Passing

1

B.E in Electrical Engineering

G .H. Raisoni College of Engineering, Nagpur

Nagpur University

66.4%/7.39

2014

2

HSSC(10+2)

Santinagar Vidyamandir, Burnpur

West Bengal Council of Higher Secondary Education

62.14%

2009

3

SSC(10th)

Eastern Railway Boys Higher Secondary School, Asansol

West Bengal Board of Secondary Education

67.62%

2007

Project Details:-

Project Title:-‘Auto Power Supply From 3 different Sources: Solar, Inverter & Mains to Ensure No Breaking of Power’.

Role:-Team Leader

Team size:-5

Brief Overview:-

Three sources are used in this project :-Solar, Inverter & Mains

ATmega16 microcontroller is used for fast switching.

Relay Driver IC (L293D) is used for driving the load by simply amplifying the logical i/p signals of microcontroller.

Voltage Regulator IC 7805 is used for maintaining the constant 5v supply.

AVR studio4, Sina Prog & PCB Artist softwares are used in this project.

The switching time of this project is 50 usec.

Computer Skills:-

MS-Office

Awards & Certifications:-

Successfully completed EDP on Solar Energy Training programme at MDTC, KVIC, Kalyani(W.B).

Present a paper of final year project in National Conference ‘Green Power & Energy’ 2013.

Won and represented my department in EPICS 2012 Football Tournament as a captain.

Winner of the EPICS 2012 Cricket Tournament.

Runners up of the MPL-2012.

Industrial Training

Certified training of fifteen days in Damodar Valley Corporation in 2012 Andal-DSTPS(Durgapur Steel Thermal Power Station)

Certified training of one month in Ambuja Cement (Farakka Unit)

Interests & Hobbies:-

Playing Cricket & Football.

Listening Music.

Personal Details:-

Date of Birth- 19th Feb, 1991

Father Name- Mr. Niloy Mondal

Mother Name- Mrs. Karuna Mondal

Permanent Address- Gour Mondal Road, Hutton Road, Asansol, West Bengal Pin-713301

Language Known- Bengali, Hindi, English

I, SUBHAJIT MONDAL, do hereby undertake and declare that the above informations are true to the best of my knowledge and belief.

Date:-

Place:- Signature



Contact this candidate