Power Plant Project

Location:
Posted:
January 07, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

ARIEL RELENTE RAYOS

Cahigam Rosario Batangas, Philippines

Contact Nos. +639*********, +639*********

Email add: ************.**@*****.***

Nationality: Filipino Civil Status: Married

Height: 5’6” Weight: 170lbs

Language / Dialect: English/Tagalog Sex: Male

Date of Birth: February 06, 1980

OBJECTIVE

To offer my best qualification and professional experiences in the field of Construction Industry, in order to attain the position of a Piping Foreman. Wherein my personal capabilities and self-expertise in Piping Works will be applied as per Piping Code, Standards and Clients Specifications.

EDUCATION AND QUALIFICATION

COLLEGE;

University of Cebu, 1998-2000; Bachelor of Science in Customs Administration

VOCATIONAL COURSES

Automotive • English Proficiency

SECONDARY SCHOOL; Basok National High School; 1993 - 1997

TECHNICAL QUALIFICATION

Seven years working experience in Construction of Petrochemical and Oil and Gas Plants,Power Plant and Piping Works exposure in various fields of piping such as Commissioning, Pre Commissioning, Pre-Fabrication and Erection from Above and Underground Piping.

SPECIAL CBT TRAINING COURSE

Hazard Identification Control • Working at Height

Emergency Response • Hand Safety and Manual Handling

Confine Space Entry • H2S Awareness • Lock Out/Tag Out

WORK EXPERIENCE

Company: Woolim E&C CO. LTD

Client Takoradi International Company Limited

Project: T2 Expansion Project, Power Plant

Duration: June 28, 2013 – June 28, 2014

Position: Piping Foreman

Duties and Responsibilities

Installation and erection of GRP 80” pipeline for sea water intake, supply and return for turbine connection.

Installation of HRSG / Boiler heavy wall internal piping both Carbon Steel and Alloy (P91, P22, P11)

Fabrication of stainless steel, carbon steel, alloy steel both large bore and small bore.

Fabrication of High Density Poly Ethane (HDPE) pipe for underground drain connection.

Erection, installation and alignment of feed water derrator drum connecting to the main pump.

Company: Kun Chong E&C CO. LTD

Client: Sonatroch Avol, Refinery Project

Project: Skikda, Algeria

Duration: May 17, 2012 to November 17, 2012

Position: Piping Foreman

Duties and Responsibilities

Request all header line, spool and random pipe for pipe rack erection

Installation of spool connection to equipment such as: vessel, tank, exchanger, pump, column, furnace, boiler etc.

Request fittings and materials used for site fabrication purposes

Doing AS BUILT for site line modification as per actual condition line checking for punch list purposes

Doing and clearing punch list for hydro testing preparation

Company: Chiyoda Hyundai Consortium

Client: Shell, Qatar

Project: FGP Pearl GTL,RasLoffan Qatar

Duration: May 07, 2011 to September 27, 2011

Position: Commissioning Foreman

Duties and Responsibilities

Preparation for air blowing activities and install valve for LPLT

Line checking all flanges joint and repair some leaking

Preparation for High Pressure Leak Test using Nitrogen and Helium

Doing final line-up together with the inspection team

Determine exact location of Injection point and depressurization point

Barricade all necessary areas because HPLT is a very critical activity

Preparation for degreasing activities

Water circulation using chemical running for the whole system

Nitrogen purging activities, preservation for all process line

Permit to Start Work applicant and receiver

Company: Hyundai Heavy Industries and Co. LTD/Sungdo Engineering and

Construction Co. LTD

Client: Qatar, Shell

Project: FGP, Pearl GTL

Project: RasLaffan

Duration: Sept. 1, 2010-Dec. 30, 2010/Mar. 30, 2009-Sept. 1, 2010

Position: Piping Foreman

Duties and Responsibilities

Material controller of fitting materials needed for site fabrication

Interpreting ISO, PLOT PLAN, PEFS and P & ID

Checking of package line and giving comment for punch list item

Fabrication of small bore both stainless steel and carbon steel

Erection of header and branch pipeline into the pipe rack

Connection and installation of spool direct to the equipment

Fabricating and bending of small pipe use for steam tracing

Experience in waterjetting, cleaning inside the pipe using compressor

Company: JGC-CCC Robigh Olefin Plants Project/ MHI CCC Independent Water Steam and Power Plant

Address: Rabigh 21911 Kingdom of Saudi Arabia

Project: Olefin Plant/Power Plant

Date: April 31, 2008-September 22, 2008/June 20, 2007-April 30, 2008

Position: Pipe Fitter

Duties and Responsibilities

Computing the formula of rolling offset, take off and etc.

Beveling, cleaning, check the squareness of pipe and then fit up

Cutting of pipe using speed cutter, cutting outfit and radial

Erection and installation of fabricated spool

Bolt tightening and hydro testing

REFERENCE

Engr. Joselito Bergonio JGC Philippines

Engr. Edgar Dumagsa Chiyoda Philippines

Supervisor BenjieEngalla Woolim Plant Engineering (Ghana)