OBJECTIVE
To offer my best qualification and professional experiences in the field of Construction Industry, in order to attain the position of a Piping Foreman. Wherein my personal capabilities and self-expertise in Piping Works will be applied as per Piping Code, Standards and Clients Specifications.
EDUCATION AND QUALIFICATION
COLLEGE;
University of Cebu, 1998-2000; Bachelor of Science in Customs Administration
VOCATIONAL COURSES
Automotive • English Proficiency
SECONDARY SCHOOL; Basok National High School; 1993 - 1997
TECHNICAL QUALIFICATION
Seven years working experience in Construction of Petrochemical and Oil and Gas Plants,Power Plant and Piping Works exposure in various fields of piping such as Commissioning, Pre Commissioning, Pre-Fabrication and Erection from Above and Underground Piping.
SPECIAL CBT TRAINING COURSE
Hazard Identification Control • Working at Height
Emergency Response • Hand Safety and Manual Handling
Confine Space Entry • H2S Awareness • Lock Out/Tag Out
WORK EXPERIENCE
Company: Woolim E&C CO. LTD
Client Takoradi International Company Limited
Project: T2 Expansion Project, Power Plant
Duration: June 28, 2013 – June 28, 2014
Position: Piping Foreman
Duties and Responsibilities
Installation and erection of GRP 80” pipeline for sea water intake, supply and return for turbine connection.
Installation of HRSG / Boiler heavy wall internal piping both Carbon Steel and Alloy (P91, P22, P11)
Fabrication of stainless steel, carbon steel, alloy steel both large bore and small bore.
Fabrication of High Density Poly Ethane (HDPE) pipe for underground drain connection.
Erection, installation and alignment of feed water derrator drum connecting to the main pump.
Company: Kun Chong E&C CO. LTD
Client: Sonatroch Avol, Refinery Project
Project: Skikda, Algeria
Duration: May 17, 2012 to November 17, 2012
Position: Piping Foreman
Duties and Responsibilities
Request all header line, spool and random pipe for pipe rack erection
Installation of spool connection to equipment such as: vessel, tank, exchanger, pump, column, furnace, boiler etc.
Request fittings and materials used for site fabrication purposes
Doing AS BUILT for site line modification as per actual condition line checking for punch list purposes
Doing and clearing punch list for hydro testing preparation
Company: Chiyoda Hyundai Consortium
Client: Shell, Qatar
Project: FGP Pearl GTL,RasLoffan Qatar
Duration: May 07, 2011 to September 27, 2011
Position: Commissioning Foreman
Duties and Responsibilities
Preparation for air blowing activities and install valve for LPLT
Line checking all flanges joint and repair some leaking
Preparation for High Pressure Leak Test using Nitrogen and Helium
Doing final line-up together with the inspection team
Determine exact location of Injection point and depressurization point
Barricade all necessary areas because HPLT is a very critical activity
Preparation for degreasing activities
Water circulation using chemical running for the whole system
Nitrogen purging activities, preservation for all process line
Permit to Start Work applicant and receiver
Company: Hyundai Heavy Industries and Co. LTD/Sungdo Engineering and
Construction Co. LTD
Client: Qatar, Shell
Project: FGP, Pearl GTL
Project: RasLaffan
Duration: Sept. 1, 2010-Dec. 30, 2010/Mar. 30, 2009-Sept. 1, 2010
Position: Piping Foreman
Duties and Responsibilities
Material controller of fitting materials needed for site fabrication
Interpreting ISO, PLOT PLAN, PEFS and P & ID
Checking of package line and giving comment for punch list item
Fabrication of small bore both stainless steel and carbon steel
Erection of header and branch pipeline into the pipe rack
Connection and installation of spool direct to the equipment
Fabricating and bending of small pipe use for steam tracing
Experience in waterjetting, cleaning inside the pipe using compressor
Company: JGC-CCC Robigh Olefin Plants Project/ MHI CCC Independent Water Steam and Power Plant
Address: Rabigh 21911 Kingdom of Saudi Arabia
Project: Olefin Plant/Power Plant
Date: April 31, 2008-September 22, 2008/June 20, 2007-April 30, 2008
Position: Pipe Fitter
Duties and Responsibilities
Computing the formula of rolling offset, take off and etc.
Beveling, cleaning, check the squareness of pipe and then fit up
Cutting of pipe using speed cutter, cutting outfit and radial
Erection and installation of fabricated spool
Bolt tightening and hydro testing
REFERENCE
Engr. Joselito Bergonio JGC Philippines
Engr. Edgar Dumagsa Chiyoda Philippines
Supervisor BenjieEngalla Woolim Plant Engineering (Ghana)