Post Job Free
Sign in

Engineering Manager

Location:
El Paso, TX
Posted:
January 06, 2017

Contact this candidate

Resume:

CARLOS GOMEZ

***********@*******.*** **** MITCHELL JONES El Paso Tx 915-***-****

OBJECTIVE

A Challenging and Rewarding Position on Government, Manufacturing, Engineering

or related areas.

Directed research, development, and implementation of design manufacturing engineering and government business.

Implemented streamlined manufacturing planning and engineering systems.

HIGHLIGHTS

Production and processing Active listening

Coordination Critical thinking

Complex problem solving Judgment and decision making

Proven Leader Management of personnel resources

ACCOMPLISMENTS

Planned, directed, coordinated and assigned manpower to efficiently meet production requirements.

Supervised different shift operations and more than 300 production and assembly line staff.

Contributed to increase in productivity through improvements in operations, quality, safety and administration.

Experience

Dish Network El Paso TX

Oct 2012 to Sep 2016

Manufacturing Supervisor.

Assessed and trained personnel for promotion to cross-functional operations.

Maintained and enforced a safe and clean working environment at all times.

Established and adjusted work procedures to meet production schedules.

Enforced a culture of lean manufacturing and continuous improvement while providing operational leadership.

Leading assigned area to get efficiency and quality bonus for 3 years.

Wal-Mart El Paso, TX

Mar 2007 to Sept 2012

Area Supervisor

Coordinate activities for assigned areas.

Conduct research to develop new and improved inventory process.

Review and require merchandise to maintain properly shelves levels to satisfy the customer needs.

ADEMCO Juarez, Mexico

1998-2006

FOCUS FACTORY LEADER

Coordinate, develop and implement the manufacturing

Engineering, Quality Control, production control and manufacturing

Activities, of the assigned area.

Improved the area productivity, reducing down time

Better production scheduling and modifying processes

Participate as a team leader, on process improvement

And cost reduction events, resulting in a savings of $400K.

JUAREZ CITY GOVERNMENT

1992-1998

AREA DIRECTOR

Coordinate Develop and Implement following programs:

Colonia’s electrification

Schools Construction and Improvement

Home Improvement

Designing and developing “My First Classroom” program.

250 classrooms and laboratories were built, 475 repaired schools.

Approval and assign more than 12,000 credits, for low incoming families.

Changed the whole logistical concept of distribution for construction materials.

Implemented Quality control for construction materials.

PROEINSA Juarez, Mexico

1986-1992

PRODUCTION MANAGER

Responsible for new area transferring, start up and personnel cerification.

Improve productivity by 25% on 2nd shift operations.

Implemented root cause and corrective actions to remove production constraints and improve product quality.

Temporary responsible for scheduling and warehouse.

TEXSCAN Juarez, Mexico

1983-1986

INDUSTRIAL ENGINEERING MANAGER

Implementation of lay out for new facility

Calculate new standards for all products

Introduced automatic equipment to reduce cycle time

Operations, decreased rejects by 50%.

Improved productivity in machining area in 30% by process improvement. Our cost reduction savings $750K

Implemented anodizing process for special aluminum parts.

EDUCATION

Bachelor's degree in Industrial Engineering

Tecnologico de Juarez Mexico

ADDITIONAL COURSES AND SEMINARS

Lean Manufacturing, JIT, ISO 9000, Leadership, Method’s Engineering



Contact this candidate