Tom Qvistgaard, Lilliendalsvej **, **** Mern, Denmark. Email:*******@*****.**

CIRRICULUM VITAE

Name: Tom Qvistgaard

Profession: Mechanical Engineer

Date of Birth: 1956

Nationality: Danish

Education:

1976 - 1981 The Engineering College, Odense Denmark.

Mechanical Engineering.

1981B.Sc. in Mechanical Engineering.

Membership in Professional Organisations:

Member of the Society of Danish Engineers

Languages:

First language: Danish

English: speaking, reading and writing: fluent

German: speaking, reading and writing: fluent

Key Qualifications:

Construction Manager/Project Manager of Water Treatment Plants, Sewer Treatment Plants, Reverse Osmoses Plants, Deep Well pump installation, distributions lines, hydraulic calculations, Water quality testing. Concrete foundations, concrete channels etc.

Construction Manager of Diesel power Plants and large Incineration Plants with Steam Boilers/Turbines, Commissioning, testing, trouble shooting, maintenance, operation and repair works. Handling-over documentation, construction scheduling, review of design. Planning of works and transportation, Factory inspections, Staff management, financial management, design and supervision of central heating stations, Hospital Departments, maintenance of Diesel Engines.

MEP Manager, MEP supervisor on Contractors side and on Consultants side.

Mechanical Consulting engineering of Power Plants-Water/Sewer Treatment Plants.

Relevant Experience:

Dec. 2013 to July 2015 Meinhardt Consultant, Singapore

Project Management and Engineering

King Abdullah Financial District

Riyadh-Saudi Arabia.

Position held in the company: Senior Mechanical Consultant Eng. Responsible for the

quality assurance of mechanical works in 19 Parcels and utilities. Design review, Site inspections, Reporting and Meetings with Consultants and the Client. Covering all mechanical utilities in buildings and external lines as sewage, 12km 800mm high pressure ductile water supply etc.

Working direct for the owner to assure Consultant’s and Contractor’s deliver the contractual quality of the works.

Details of Project. The King Abdullah Financial District (KAFD) is a new development under construction near King Fahad Road in the Asahafa area of Riyadh Saudi Arabia being undertaken by the Rayadah Investment Corporation on behalf of the Pension Authority of the Kingdom of Saudi Arabia consisting of 34 towers in an area of 1.6 million square meters. It will provide more than 3 million square meters of space for various uses, 62,000 parking spaces and accommodation for 12,000 residents.

January 2013 Grontmij Consultant

Project Management and Engineering

Saidabad, Dhaka Bangladesh

Position held in the company: Test Manager of water treatment plant

Details of Project. Saidabad Water Treatment Plant phase 2,

225,000m3/d treated water for Dhaka city.

Built by MT Hojgaard and Degreemont.

In charge of Test and Commissioning.

Sept. 2012 to Jan. 2013 Six Construct Ltd.

Project Construction, Management and Engineering

Abu Dhabi, UAE

Position held in the company: General MEP Manager

Details of Project. Cleveland Clinic, a 350 bed Hospital of highest standard.

1800 rooms of various use, Royal floors etc.

Managing of Sub Contractors work packages, including

manpower, logistic, planning.

June 2011 to May 2012 MT Højgaard A/S

Project Management and Engineering

Hardanger/Norway

Position held in the company: Construction Manager / Site Manager

Details of Project. Interim constructions for a 1310m suspension Bridge.

Platforms, Catwalk, Pull back, Spinning System etc.

Managing of Sub/Contractors.

Managing of the construction work.

July 2010 to January 2011 Semco Maritime

Project Management and Engineering

Male/Maldives

Position held in the company: Site Manager/Construction Manager/Mech. – Civil – Elec.

Details of Project. Construction of Power Plant with 3 x 8.4MW

MAN Diesel Engines.

Managing of Sub/Contractors.

Managing of the construction work and Test & Comm.

The construction include cooling pipes, pump station,fuel pipes, lubrication pipes, Tank Farm, HVAC, Sub Station and two 1400m, 600mm Sea Water cooling pipes 4m below ground level and further on the Sea bed.

April 2009 to October 2009 Aker Solutions Int.

Project Management and Engineering

Dubai/UAE

Position held in the company: Construction Manager / Commissioning Manager

General tasks and responsibilities: Managing of Project/Construction of VOC Plant

Details of Project. Assembling of 4 vapour units and installation on two ultra large crude oil tankers.

Managing of Sub/Contractors.

Managing of the construction work and Test & Comm.

The units include water, steam, elect, inst. Air, sea water,

crude oil, vapour gasses. All piping according to class certifications.

February 2006 to November 2008 Kruger A/S International

Project Management and Engineering

Oslo Norway

Position held in the company: Construction Manager / Projects Manager/

MEP Manager/Commissioning Manager

General tasks and responsibilities: Managing of Project/Construction of Plant/Commissioning

Details of Project. Construction of Oslo new Water Treatment Plant

Managing of up to 120 staff from Contractors.

Managing of the construction, Site facilities, all meetings with the Client and the Consultants and T&C incl. design issues.

The plant capacity is 390.000 cubic meters of

Drinking water/ day.

Process, lake water -CO2 – lime – micro sand - coagulant –

filtration – UV, clorination, water supply lines etc.

Stainless steel pipes in general in Plants and ductile pipes

underground.

http://www.vann-og-avlopsetaten.oslo.kommune.no/getfile.php/vann-%20og%20avl%C3%B8psetaten%20(VAV)/Internett%20(VAV)/Dokumenter/ThinkWater/City%20of%20Oslo/New%20water%20treatment%20plant%20in%20Oslo.pdf

June 2004 to October 2005 Mission East International

Project Management and Engineering

Northern Iraq, Dohuk

Position held in the company: Project Manager / Country Director

General tasks and responsibilities: Managing of Projects, Construction and Staff

Manager of design/construction, Site supervision and commissioning.

Design, Tender process and purchasing of equipment.

Management of 40 local Staff and Offices.

Details of Project.

Construction of 600 houses for UNHCR, 4 Schools, 10 Teachers houses, 4 Water projects/pump stations and Road Projects.

Deep Wells with pumps, piping, storage tanks and distribution lines for villages.

In all 12km 400mm ductile pipes laid in sand with concrete fix points, in trenches and final supply lines in pvc pipes.

January 2003 to November 2003 I.C.R.C. International Committee of Red Cross

Project Management and Engineering

Afghanistan

Position held in the company: Project Manager/Construction Manager

General tasks and responsibilities: Managing of Project and Staff

Manager of design/construction, Site supervision and commissioning.

Design, Tender process and purchasing of equipment.

Details of Project.

Refurbishment of X-ray departments, workshops and

Incinerators in Wazir Akbar Khan Hospital in Kabul

and Mir Wais Hospital in Khandahar for The Danish Red Cross and Kuwait Red Crescent.

November 2001 to August 2002 Hospitalized

October 2000 to August 2001 Burmeister & Wain Scandinavian Contractor

Project Management and Engineering

Iraq, Sulaimaniyah

Position held in the company: Construction Manager/Commissioning Manager/ Plant Manager

General tasks and responsibilities: Managing of Project/Construction of Plant

Chief of construction, Site supervision and commissioning

Design review, trouble shooting, contact to the Client, Consulting Engineers, and Sub-Contractors

Plant Manager, responsible for operation and maintenance, Staff management of 135 members.

Details of Project.

29 MW Diesel Power Plants equipped with 4 pcs. MAN 18V32/40 four stroke engines.

The construction include cooling pipes, fuel pipes, lubrication pipes, tank Farm, HVAC and Sub Station.

8km D 450mm water supply line, stainless steel,

installed above ground level and supported on concrete

foundations incl. loops for expansion. Water treatment

plant for engines cooling.

May 1994 to May 1999 Ansaldo Volund A/S

Project Management and Engineering

England, Cleveland Incineration Plant

Taiwan, Hsinshu Incineration Plant

Taiwan, Tainan Incineration Plant

Korea, Changwon Incineration Plant

Korea, Pusan Incineration Plant

Position held in the company: Construction Manager - Chief Engineer-Commissioning Manager

General tasks and responsibilities: Chief of construction / engineering, Site supervision and commissioning.

Design review, trouble shooting, contact to the Client, Consulting Engineers, and Sub-Contractors.

Details of Project.

Large Incineration Plants equipped with Furnaces, Boilers,

Steam drums, Economisers, Turbines up to 35 MW. Steam of 400 degrees Celsius and 52 bars. Diesel Generators for

start of Plant. Water Treatment plant for Boiler water/steam quality.

Construction of Plants, Commissioning and Handling-over

to the Client. High class welded steam pipes.

March 1991 to September 1993 Ibeco I.S. Industrial Building Company

Tripoli, Libya

Position held in the company: Maintenance Manager

General tasks and responsibilities: Chief of maintenance on a Concrete element Factory

Maintenance planning, Spare parts, Storage, repair works.

Details of Project.

Factory made by Hojgaard & Schultz with 300 employees, 45 maintenance Staff. 5 castings bays, cement Plant, concrete mixing Plant, 50 trucks, 5 overhead cranes and two gantry cranes and Diesel power Plant.

Water Treatment Plant and Boiler Plant for steam generation.

January 1989 to September 1990 Birch & Krogboe, Consulting Engineers & Planners

Riyadh and Jubail, Saudi Arabia

Position held in the company: Senior MEP Engineer

General tasks and responsibilities: Responsible for design, engineering and supervision.

Details of Project.

9 pcs. Radar Station Projects with 80 Villas, Sewer/

Water Treatment Plant, Power Plant, Radar tracking

Station, water storage, treatment and distribution.

11km D350mm PVC well water pipe for osmosis Plant and cooling Towers. Laid in a sand trench.

September 1986 to January 1989 Carl Bro A/S Int. Consulting Engineers & Planners

Nuuk, Greenland

Position held in the company: MEP Engineer

General tasks and responsibilities: Project management, Engineering / Supervision.

Details of Project.

Cooling Stores, Central heating Stations, Diesel Gen.Sets for small Towns, Incineration Plant, repair of 2-stroke diesel Power Plant. HVAC design.

8 km D 400mm ductile water pipe from Water Treatment Plant to residential area. Trench in rock matr. with sand bed.

September 1985 to July 1986 Birch & Krogboe, Consulting Engineers & Planners

Riyadh, Saudi Arabia

Position held in the company: MEP. Engineer

General tasks and responsibilities: Supervision of mechanical and sanitary works, incl.testing.

Details of Project.

500 beds Hospital for the Ministry of Interior.

Incl. Power Station, Water Treatment Plant,

Boiler House, Medical Gas Plant. Safety Gen.sets.

1.2km well water pipe in sand trench.

July 1982 to September 1985 Carl Bro A/S Int. Consulting Engineers & Planners

Baghdad, Iraq

Position held in the company: Site MEP Engineer

General tasks and responsibilities: Supervision of mechanical and sanitary works,incl.testing.

Details of Project.

Haifa Street part 6, 21 buildings with apartments,

6 – 15 floor, 230.000 square meters

Haifa Street parts 8, 9 Buildings, 21 floors.

Hai Sadam City, 305.00 square meters of apartments,

Public Buildings, Power Plant etc. Sewer systems.

26 km water pipes in trenches for supply to residential areas.

June 1981 to June 1982 Konsulentgruppen Fyn, Consulting Engineers

Svendborg, Denmark

Position held in the company: MEP Engineer

General tasks and responsibilities: Design and supervision of Mech. Works.

Details of Project.

Industrial Buildings and residential Buildings.

HVAC installations.