OSCAR GREGORIO CARDENAS SALINAS
Av. ** de Setiembre 616 Lima-07
Lima –Perú
Phone: +051-*********
*********@*******.***
SUMMARY
Petroleum engineer with twenty seven years of experience in Production, Workover and Reservoir engineering in oil and gas fields.
Experience in Design of Artificial Lift as Pumping Unit, Pumping Cavity Progressive, Electrical submersible Pumps. Experience working as company man in Rigs for Workovers and Well Services Jobs. Experience as Reservoir Engineer working in Reserves estimation and analysis of well testing in oil wells and gas wells.
OIL & GAS EXPERIENCE
MAPLE GAS CORPORATION Jan-18-2012 – to present
Manager Production Pucallpa, Peru
Production Manager, Management in Forecast, Budget, Production Operations, and control in workover, Pulling and Drilling Jobs, in Maquia, Agua Caliente and Pacaya Fields, Central Jungle in Peru.
Development in hydraulic fracturing in wells of central jungle.
Reserves Estimation in Maquia and Agua Caliente Fields. using decline analysis for wells with production history as well as risk analysis for exploratory prospects. Reserves bookings by year-end. Provided oil and water production forecast for all oil assets as required for internal and external needs
Economic analysis: prepared the economic evaluation of workover, drilling and others projects
PLUSPETROL NORTE Set 2007 – Jan-13-2012
Production Engineer in Engineering Production Department Lima, Peru
Currently responsible in production and reservoir engineering duties in the development one of the two largest oil fields in the North Peruvian jungle. Production of 15 MBOPD and 450 MBWPD.
Duties:
Optimization design of artificial lift system (Electro-Submersible Pump) using nodal analysis, and other software as AG (Centrilift), AVOCED (Schlumberger).
Well productivity Analysis using PROSPER and GAP.
Cased hole and pulsed neutron logs evaluation (cement bond log (CBL) and RST, Corrosion Logs and Production an Injection logs.
Design, wellsite supervision, QA/QC and analysis of well testing (DD, PBU, DST with jet pump) and wireline pressure logs (MDT).
Economic analysis: prepared the economic evaluation of workover, drilling and others projects.
MAPLE GAS CORPORATION Jan 1995-Aug 2007
Manager Production Pucallpa, Peru
Production Manager, Management in Forecast, Budget, Production Operations, and control in workover, Pulling and Drilling Jobs, in Maquia, Agua Caliente and Pacaya Fields, Central Jungle in Peru.
Economic analysis: prepared the economic evaluation of workover, drilling and others projects
Reservoir Engineer
Reserves Estimation in Maquia and Agua Caliente Fields. using decline analysis for wells with production history as well as risk analysis for exploratory prospects. Reserves bookings by year-end. Provided oil and water production forecast for all oil assets as required for internal and external needs.
Recovery Secondary in Cretaceo Reservoir in Maquia and Agua Caliente Fields. (Central Jungle in Peru)
Drilling and Workover Engineer
Drilling Supervisor in Works to Drill Well Cashiboya 1X BLOCK 31 E.
Drilling Supervisor in Works to Drill Well San Roque 1X BLOCK 31 E.
Supervisor of Rigs for Workovers in Maquia Well’s BLOCK 31-B (Workover Program, Squeeze design, Acidizing Design, Fishing Jobs).
Production Engineer
Production Engineer and Assistant for Manager Production
Production Engineer in the Maquia, Agua Caliente Fields (Jungle of Peru).
Design to Artificial Lift in Pumping and PCP.
Design in workover jobs and well testing for gas wells in Aguaytia Field.
CAVELCAS OF PERU Jan.1992-Jul. 1994
Production Engineer Talara-Norwest of Peru
Production Engineer in North West of Peru.
Responsible for prepare Workover Program to wells in North West of Peru.
Reserves Evaluation in BLOCK – I North West of Peru.
Economic evaluation of workover and drilling plans, other projects.
Production costs estimation.
PETROPERU July 1989- Set.1990
Lima - Peru
Junior Production Engineer
Evaluation for Drilling and Workovers for Gas wells in Camisea and Aguaytia Project, Gas Natural Department
Design Completion in gas wells in Camisea Field
Evaluation of Sand Frac and new technologies in Mud’s for wells in North West of Peru, Research Center in Lima-Peru.
PETROPERU Jan. 1988 – Dec. 1988
Trainee Lima - Peru
Rotation in Production Area.
OXY-PERU Jul. 1987 – Dec. 1987
Trainee Lima - Peru
Rotation in Reservoir Department Area.
TRAINING
PETROPERU.
Lima- Peru
Nodal Analysis Oct.1989
Gas Reservoir July 190
CAVELCAS OF PERU
Talara-Peru
Production Operations Set-1993
MAPLE GAS CORPORATION
Lima- Peru
Reservoir Course Set - 1999
Reserves estmation Nov - 2001
Drilling and Workover Jul. - 2004
Talara –Peru
Course to PCP installation Set. 2005
Fishing Techniques for Drilling and Workover Jobs. Nov - 2006
PLUSPETROL NORTE S.A.
Comodoro Rivadavia, Argentina
Damage of Formation Set-2008
Lima, Peru
Production in Reservoir of Heavy Oil Nov-2009
Nodal Analysis Jun-2009
Reserves Estimation Nov-2010
Techniques for Cementation BJ Services Dic-2010
SOFTWARE PROFICIENCY
Computer programs: Internet, Windows Environment, Microsoft Word, Excel, Power Point.
Professional software: Petroleum Experts IPM (Prosper: Nodal Analysis and Electro-Submersible Pump Design, GAP: Production System Modeling), OFM (Production Data Analysis)
AFFILIATIONS
None
EDUCATION
UNIVERSIDAD NACIONAL DE INGENIERIA
Lima, Peru
B. Sc Petroleum Engineering 1980-1988
Thesis: “Completion for Gas Wells in Camisea Field Using Nodal Analysis”
PERSONAL DETAILS
Nationality: Peruvian
Date of birth: 28th November 1962
Languages: Spanish (native language); English (Intermediate)
REFERENCES
Available upon request