NILESH BHANDAKKAR
Thane (West) Mumbai 400-601
Mobile: +91-898*******/ 979-***-****
Email: acwwgx@r.postjobfree.com
PROFILE SUMMARY
Offering over 4.5 years of experience as FIELD SERVICE ENGINEER / ASSEMBLY ENGINEER
Possess extensive knowledge of operation, installation and maintenance of surface exploration equipment
Provide service of well-head and X-mas tree.
Experience in pre planning including all logistics, Tooling, environmental, Health & safety (EHS) & technical work scope applicable to assignment.
Testing of oilfield products according to API standard on rig site.
Possess motivational management style with a record of being able to deliver positive results independently & under pressure
CAREER OBJECTIVE:
I am looking ahead to work in a professional, growth oriented organization, where in one can make significant contribution to the success of the organization. Seeking a position that involves creativity, challenges and that provides me, an opportunity to constantly strive to explore, innovate & excel in attaining organizational and my individual goals. A consistently dependable team player, I can thrive in a high-pressure environment, enjoy the challenges of meeting deadlines and lead a team successfully.
STRENGTH & SKILLS:
Good analytical, interpersonal, communication & listening skills coupled with dedication and sincerity towards the assigned job.
EDUCATION BACKGROUND:
Course / Degree
Institute / Board
Year of Passing
Grade
B.E (Mechanical)
Kavikul Guru Institute of Technology & Science, Rashtrasant Tukadoji Maharaj Nagpur University
2011
I
H.S.C
Maharashtra State Board
2007
II
S.S.C
Mount Carmel Convent /School/CBSE
2005
I
EXTRA QUALIFICATIONS
* Completed MS Office – Basic Computer Course (MS Word, MS Excel, MS Power Point & Internet).
* Completed T-BOSET, Sea Servival, Fire Fighting & Frist Aid Training.
* Completed PDMS course.
PROJECT HANDLED
Title Fabrication of Test Rig for the Replacement of Carbureted System with Direct Fuel Injection System for Two Stroke Si-Engine
Duration: 12 Months
Synopsis: Main aim was to compare the performance of carbureted system and optimization of the parameters like power output, combustion efficiency and BSFC Characteristics
PAPER PRESENTATION
* Manufacturing of Cement
TRAINING ATTENDED
* Associate Cement Company on Manufacturing of Cement for 18 Days
CASE STUDIES
* Manufacturing of Thread at Suryaamba Spinning Mill for 3 Days
EXPERIENCE
Worked as “Field Service Engineer” at KOP Surface Products (Aker Solutions (Services) Pvt. Ltd.) from September 2013 to December 2015
Worked as “Assembly Engineer” at Worldwide Oilfield Machines Pvt. Ltd. (WOM) from June 2011 to August 2013
Key Responsibilities
* Provide service of well-head and X-mas tree.
* Install landing ring, well-head, hangers, Pack-off, Xmas tree.
* Comprehensive job pre planning including all logistics, Tooling, environmental, Health & safety (EHS) &
technical work scope applicable to assignment.
* Knowledge of operation, installation and maintenance of surface exploration equipment
* Assembly of oilfield products such as ball valve, gate valve, X-mass tree, actuator valves, chokes, mud valve and
equipment’s according to API standard on rig site.
* Testing of oilfield products according to API standard on rig site.
* Troubleshooting of products on & off the job.
* Take action in a consequent manner, goal oriented within the fixed deadlines.
* Able to work efficient under time pressure.
PROJECT HANDLED IN WORLDWIDE OIL-FIELD MACHINES (2011-2013)
Title Refurbish Schlumberger’s 3 1/16” 15K Flow-Head.
Duration 3 months
Title Refurbish Transocean 3 1/16” 15K gear operated manual adjustable choke.
Duration 15 days
Title Refurbish Transocean 3 1/16” 15K Sub-Sea valve.
Duration 1month
Title Compact Well-head FAT for M3 and M9 Project for PTTEP (Petroleum Thailand exploration and production)
Duration 3months
WORKED FOR CLIENTS-OFFSHORE & ONSHORE
Kris Energy (Thailand)
Triple splitter well-head (TSW) 36” base plate X 13-3/8” casing hanger (3) X starting head X 9-5/8” casing hanger (3) X 9” 5M well head X 7” casing hanger with pack-off X 2-7/8” tubing hanger with #2 control line & X-mas tree.
Cairn Energy India Pvt. Ltd. (INDIA)
System: - 13-5/8” x 9-5/8” x 7” x 3-1/2” or 4-1/2” completion. 2-step as well as 3-step “MK-II” type wellhead and X-mas tree.
BG Exploration & Production India Pvt. Ltd. (INDIA)
Work-over completion for 4-1/2” tubing hanger and related pack-off jobs
Installation of VR plug and gate valve in the well-head side outlet and well-head seal testing at PANNA MUKTA BG INDIA
The objective of this job is to make the wellhead configuration of the annulus valves in Panna/Mukta wellheads comply with BG WEMS standards and to meet production requirements as well as install additional gate valves on annulus wherever having shortfall & Pressure testing of various valves/Seals and replaced the failed valves.
COMPETENCIES
Quick learner & adapts well to changes and pressure in work place
Managing relationships & working efficiently with diverse groups of people
Committed to meeting deadlines and schedules
Leadership skills to lead projects & handle work independently
LANGUAGES KNOWN
English, Hindi, Marathi (Speak, Read, Write)
HOBBIES
Reading & Playing Games
DATE OF BIRTH
17 October 1987
REFERENCE
DECLARATION
I hereby declare that the details furnished above are true to the best of my knowledge.
Mumbai