A creative, highly motivated, adaptable and effective planning engineer with more than 25 years of extensive multi-disciplinary experience in construction business both local and overseas environment.
A thorough knowledge and key skills in all areas of project management, tender and project scheduling with various heavy civil works, highways, bridges, mass concrete, building works, railways and oil and gas environment.
A skilled communicator and motivator both in oral and written. Able to develop conflict conditions to achieve maximum productivity. Experienced in working with remote locations and manage operations with less supervision.
Expertise in Primavera (P6, P3, suretrack), MS project, excel, word, Autocad, Sketchup and all computer software necessary to achieve effective results in minimum work time.
Professional Experience
Odebrecht Engenharia & Construccao Internacional – (Mar 2013 to Feb 2016)
Via1 – AV Talatona, Condominio Belas Business Park
Torre Cabinda 7, Andar, Luanda, Angola
Position : Sr. Planning and Scheduling Engineer
Projects:
Construction of Marine Port Facility (EPC)
Project Cost – USD 200 Million
Construction of New Lower Heavy Haul Road -
Project Cost USD 200 Million
Terracing - Site preparation works for the proposed SONAREF Oil Refinery
Project Cost USD 400 Million
Odebrecht Construction International – Liberia – (Mar 2012 to Dec 2012)
AML Compound, Buchanan City,
Liberia, West Africa
Position : Sr. Planning and Scheduling Engineer
Project:
Rehabilitation of the existing 262 Km of railway. The scope of works also includes the rehabilitation of railway deck truss, through truss, plate girder steel bridges CMP culverts rehabilitation including cleaning, slip lining, open cut & concrete invert and maintenance of access roads.
B.L. Harbert International, L.L.C. - Jun 2008 to Aug 2011
1030 London Drive, Suite 400,
Birmingham, Alabama 35211, USA
Position : Project Planner / Scheduler
Projects Completed:
Construction of New American Embassy Compound - August 2009 to Aug 2011
Monrovia, Liberia, West Africa
Construction of New American Embassy Compound - June 2008 to August 2009
Ouagadougou, Burkina Faso, West Africa
AC Tajanlangit Construction and Builders Corp. – (Apr 2007 to Jun 2008)
2nd Floor ATM Building, Ledesma corner Jalandoni Sts.
Iloilo City 5000, Philippines
Position : Operations Manager
Project Completed:
Boracay Convention Center – Boracay Island, Aklan
Two Seasons hotel – Boracay Island - Aklan
The Palms Condotel – Boracay Island - Aklan
Coron Gateway Hotel – Coron Island - Palawan
H.B. Zachry Company (International) – (Apr 2006 to Apr 2007)
527 Logwood, San Antonio,
Texas 78221-1738, USA
Position : Project Planner / Scheduler
Project Completed:
Construction of New American Embassy Compound
Quito, Ecuador
British Petroleum Philippines, Inc. (BPPI) – (Apr 2003 – Apr 2005)
Dino Compound, Labogon Road, Basak,
Mandaue City, Cebu, Philippines
Position: Field Implementation Manager
Project Completed:
Electrification of the Department of Agrarian Reform Beneficiaries, Mindanao Island, Philippines
Freelance Planning Consultant
Clients:
Leighton Contractors Philippines, Inc. (Australian Firm)- June to October 2002
Anderson Asphalt Philippines Inc. (Hong Kong Firm) - October to December 2002
British Petroleum Philippines, Inc. – December 2002 – April 2003
Leighton Contractors Phils, Inc. (Australian Firm) – (Feb 2000 to Apr 2001)
9/F Insular Life building6781 Ayala Avenue,
Makati City, Philippines
Position: Sr. Planning Engineer – Tender and Preconstruction
John Holland Contractor Inc. (Australian Firm) - (Feb 1996 to Feb 2000)
5 /F 115-117 Esteban Corner Herrera Sts.Legaspi Village,
Makati City, Philippines
Position Sr. Planning Engineer
Projects Completed:
Malampaya Concrete Gravity Sub Structure- October 1998 – Feb 2000 (EPCM)
Owner - Shell Philippines Exploration B.V.
Scope of Works - Design, Procure, Build, Supervision and Tow - The sub structure constructed in Subic, Zambales, towed and installed to its location in Malampaya Oil Field, Palawan, about 500 Nautical Miles south of Manila.
It is about 80,000 Metric tons in weight, 12,000 metric tons of reinforcing steel, 35,000 cubic meters of concrete and approximately 500 tons of Mechanical outfitting.
Quezon Power Plant Marine Facilities - April – October 1998
Owner - Bechtel Overseas Corp.
Scope of works – Procure, construction and supervise – 600 meter Pier/ Trestle and conveying systems for coal fuel unloading systems, from the delivery vessel to stockpile area. Installation of 3m diameter subsea intake and discharge cooling systems for coal power plant, and Construction of wharf and embankment.
JHP - Makati Main office - November 1997 April 1998
Overall In-charge for the preparation of Tender and Pre-construction schedules
Belleview Tagaytay Condominiums - September 1996 to November 1997
Hands-on Computer Training Center – (Apr 1995 to Dec 1995)
2nd Floor La sallete Building, Valeria St. Iloilo City, Philippines
Position Electronic Data Processing Instructor (Computer Software)
Courses Handled; Primavera Project Planner P3 (Basic), Autocad (Basic and Advance), Microsoft office software.
Al Osais International Holdings Company – (Oct 1988 to Mar 1995)
P. O. Box 1083, Dammam 31431, Kingdom of Saudi Arabia
Position : Chief Estimator/Tender Planner - January 1992 to March 1995 (Head Office)
Education:
Bachelor of Science in Civil Engineering - 1988
Other Courses & Seminars attended:
Shaping Accident Free Environment (SHAPE) – January 2015
HOC-Hazard Observation Check / CPI-Corrective Prevention Inspection - 2000 -
Primavera Project Planner (P3) - 1993
Computer Aided Design and Drafting Technology - 1992
Construction Management / Management Executive course - 1991
Managerial Problem Analysis and Decision Making - 1990