Jeffrey A. Cortez

Contact Info

Address: Don Candido Subdivision, North Fundidor, Molo, Iloilo City 5000, Philippines

Home Phone: 006*-**-***-****, Mobile Phone: 006*-***-*** 5051, Email: ***********@*****.***

Summary

A creative, highly motivated, adaptable and effective planning engineer with more than 25 years of extensive multi-disciplinary experience in construction business both local and overseas environment.

A thorough knowledge and key skills in all areas of project management, tender and project scheduling with various heavy civil works, highways, bridges, mass concrete, building works, railways and oil and gas environment.

A skilled communicator and motivator both in oral and written. Able to develop conflict conditions to achieve maximum productivity. Experienced in working with remote locations and manage operations with less supervision.

Expertise in Primavera (P6, P3, suretrack), MS project, excel, word, Autocad, Sketchup and all computer software necessary to achieve effective results in minimum work time.

Professional Experience

Odebrecht Engenharia & Construccao Internacional – (Mar 2013 to Feb 2016)

Via1 – AV Talatona, Condominio Belas Business Park

Torre Cabinda 7, Andar, Luanda, Angola

Position : Sr. Planning and Scheduling Engineer

Projects:

Construction of Marine Port Facility (EPC)

Project Cost – USD 200 Million

Construction of New Lower Heavy Haul Road -

Project Cost USD 200 Million

Terracing - Site preparation works for the proposed SONAREF Oil Refinery

Project Cost USD 400 Million

Odebrecht Construction International – Liberia – (Mar 2012 to Dec 2012)

AML Compound, Buchanan City,

Liberia, West Africa

Position : Sr. Planning and Scheduling Engineer

Project:

Rehabilitation of the existing 262 Km of railway. The scope of works also includes the rehabilitation of railway deck truss, through truss, plate girder steel bridges CMP culverts rehabilitation including cleaning, slip lining, open cut & concrete invert and maintenance of access roads.

B.L. Harbert International, L.L.C. - Jun 2008 to Aug 2011

1030 London Drive, Suite 400,

Birmingham, Alabama 35211, USA

Position : Project Planner / Scheduler

Projects Completed:

Construction of New American Embassy Compound - August 2009 to Aug 2011

Monrovia, Liberia, West Africa

Construction of New American Embassy Compound - June 2008 to August 2009

Ouagadougou, Burkina Faso, West Africa

AC Tajanlangit Construction and Builders Corp. – (Apr 2007 to Jun 2008)

2nd Floor ATM Building, Ledesma corner Jalandoni Sts.

Iloilo City 5000, Philippines

Position : Operations Manager

Project Completed:

Boracay Convention Center – Boracay Island, Aklan

Two Seasons hotel – Boracay Island - Aklan

The Palms Condotel – Boracay Island - Aklan

Coron Gateway Hotel – Coron Island - Palawan

H.B. Zachry Company (International) – (Apr 2006 to Apr 2007)

527 Logwood, San Antonio,

Texas 78221-1738, USA

Position : Project Planner / Scheduler

Project Completed:

Construction of New American Embassy Compound

Quito, Ecuador

British Petroleum Philippines, Inc. (BPPI) – (Apr 2003 – Apr 2005)

Dino Compound, Labogon Road, Basak,

Mandaue City, Cebu, Philippines

Position: Field Implementation Manager

Project Completed:

Electrification of the Department of Agrarian Reform Beneficiaries, Mindanao Island, Philippines

Freelance Planning Consultant

Clients:

Leighton Contractors Philippines, Inc. (Australian Firm)- June to October 2002

Anderson Asphalt Philippines Inc. (Hong Kong Firm) - October to December 2002

British Petroleum Philippines, Inc. – December 2002 – April 2003

Leighton Contractors Phils, Inc. (Australian Firm) – (Feb 2000 to Apr 2001)

9/F Insular Life building6781 Ayala Avenue,

Makati City, Philippines

Position: Sr. Planning Engineer – Tender and Preconstruction

John Holland Contractor Inc. (Australian Firm) - (Feb 1996 to Feb 2000)

5 /F 115-117 Esteban Corner Herrera Sts.Legaspi Village,

Makati City, Philippines

Position Sr. Planning Engineer

Projects Completed:

Malampaya Concrete Gravity Sub Structure- October 1998 – Feb 2000 (EPCM)

Owner - Shell Philippines Exploration B.V.

Scope of Works - Design, Procure, Build, Supervision and Tow - The sub structure constructed in Subic, Zambales, towed and installed to its location in Malampaya Oil Field, Palawan, about 500 Nautical Miles south of Manila.

It is about 80,000 Metric tons in weight, 12,000 metric tons of reinforcing steel, 35,000 cubic meters of concrete and approximately 500 tons of Mechanical outfitting.

Quezon Power Plant Marine Facilities - April – October 1998

Owner - Bechtel Overseas Corp.

Scope of works – Procure, construction and supervise – 600 meter Pier/ Trestle and conveying systems for coal fuel unloading systems, from the delivery vessel to stockpile area. Installation of 3m diameter subsea intake and discharge cooling systems for coal power plant, and Construction of wharf and embankment.

JHP - Makati Main office - November 1997 April 1998

Overall In-charge for the preparation of Tender and Pre-construction schedules

Belleview Tagaytay Condominiums - September 1996 to November 1997

Hands-on Computer Training Center – (Apr 1995 to Dec 1995)

2nd Floor La sallete Building, Valeria St. Iloilo City, Philippines

Position Electronic Data Processing Instructor (Computer Software)

Courses Handled; Primavera Project Planner P3 (Basic), Autocad (Basic and Advance), Microsoft office software.

Al Osais International Holdings Company – (Oct 1988 to Mar 1995)

P. O. Box 1083, Dammam 31431, Kingdom of Saudi Arabia

Position : Chief Estimator/Tender Planner - January 1992 to March 1995 (Head Office)

Education:

Bachelor of Science in Civil Engineering - 1988

Other Courses & Seminars attended:

Shaping Accident Free Environment (SHAPE) – January 2015

HOC-Hazard Observation Check / CPI-Corrective Prevention Inspection - 2000 -

Primavera Project Planner (P3) - 1993

Computer Aided Design and Drafting Technology - 1992

Construction Management / Management Executive course - 1991

Managerial Problem Analysis and Decision Making - 1990